Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹5,820
Closing Date
21 Sept 2026, 6:00 pm6d left
XEN REW JAMMU
XEN REW JAMMU
Construction of R wall/ Protection work and drain NHO vaishno Devi and Vidhya Devi at Block Kharahballi
2026_RDPR_324041_1
eNIT 558 REWJ of 2026-27 dated 09-09-2026
Open Tender
Civil Works
Percentage
30 days
rew jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹5,820
9 Sept 2026
9 Sept 2026
22 Sept 2026
9 Sept 2026
21 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kind of soil | 19.35 | cum. | 256.85 | ₹4,969.28 |
| 2 | P/L in position Cement conc. 1 cement:5fine sand:10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. | 0.76 | cum. | 4,826.5 | ₹3,663.31 |
| 3 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. | 27.21 | cum. | 5,733.6 | ₹1,56,034.19 |
| 4 | SUPPLY AND FILLING OF BOULDERS | 11.66 | cum. | 900 | ₹10,496.7 |
| 5 | Reinforced cement concrete including curing but excluding the cost of centering,shuttering and reinforcement withl 1:1.5:3 (1 Cement:1.5 Coarse sand:3 Graded stone aggregate 20mm nominal size) | 2.57 | cum. | 7,788.4 | ₹20,016.19 |
| 6 | Steel Reinforcement for RCC Work including straightening,cutting,bending, placing in position and binding all complete above plinth level . Cold twisted bars | 257.09 | Kg | 123.2 | ₹31,673.49 |
| 7 | Centring & shuttering including strutting, propping etc. and removal of the formwork. | 117 | sqm. | 286.35 | ₹33,502.95 |
| 8 | Suspended floor | 6.16 | sqm. | 718.2 | ₹4,424.11 |
| 9 | Edges of slab Above 20 cm wide | 4.02 | sqm. | 1,145.1 | ₹4,603.3 |
| 10 | Excavating, supplying and filling of local earth including royality in AKOS | 16.05 | cum. | 276.6 | ₹4,439.43 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_1092328.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .