| 1.00 | Soil investigation upto depth of 8m or upto resual strate where N Value otained 50/100 whichever met earlier conducting penetration test at change of layer at specified interval of 1m to 1.5 M Carrying out latest as Per IS Standard providing report for foundation including mobilisation and demobilisation shifting from location to location water charges for drilling etc., Complete | 1 | Loc | 61,000 ₹61,000 Lowest |
| 2.00 | Desigining All the components of foundation, Beams, Columns and slab as per the requirement based on soil investigation and preparation of drawings for all components for proposed construction and submission of drawings 6 copies = 2 soft copies afet getting approval from the competent authority including all material labour lead lift etc., | 1 | Nos | 33,000 ₹33,000 Lowest |
| 3.00 | Cutting and uprooting the existing trees and clearing the same away from the site as directed by the Engineer at site.
(Small sized trees) | 5 | Nos | 1,700 ₹8,500 Lowest |
| 4.00 | Cutting and uprooting the existing trees and clearing the same away from the site as directed by the Engineer at site.
( Medium sized trees) | 7 | Nos | 2,550 ₹17,850 Lowest |
| 5.00 | Cutting and uprooting the existing trees and clearing the same away from the site as directed by the Engineer at site.
(Uprooting & Removing Large Palmyrah/Coconut Stumps) | 7 | Nos | 230 ₹1,610 Lowest |
| 6.00 | Cutting and uprooting the existing trees and clearing the same away from the site as directed by the Engineer at site.
(Uprooting & Removing Large Palmyrah/Coconut Stumps) | 5 | Nos | 150 ₹750 Lowest |
| 7.00 | Cutting and uprooting the existing trees and clearing the same away from the site as directed by the Engineer at site.
( Clearing of Juliflora with uprooting in Yard Portion clearing of Juliflora with uprooting in Yard portion) | 240 | Sqm | 13 ₹3,120 Lowest |
| 8.10 | SGST | 1 | percentage | 0.09 ₹11,324.7 Lowest |
| 8.20 | CGST | 1 | percentage | 0.09 ₹11,324.7 Lowest |
| 8.30 | GST for bidders outside TamilNadu (IGST) | 1 | percentage | - |
Tender Value
Refer Docs
EMD Value
₹1,340
Closing Date
2 Feb 2026, 2:00 pmClosed
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
As per NIT
2026_EB_645065_1
LT-26/2025-26 of SE/GCC-II
Limited
Civil Works
Works
120 days
Velachery
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹1,340
Yes
20 Jul 2026
20 Jan 2026
3 Feb 2026
20 Jan 2026
2 Feb 2026
20 Jan 2026
Soil investigation upto depth of 8m or upto resual strate where N Value otained 50/100 whichever met earlier conducting penetration test at change of layer at specified interval of 1m to 1.5 M Carrying out latest as Per IS Standard providing report for foundation including mobilisation and demobilisation shifting from location to location water charges for drilling etc., Complete
Desigining All the components of foundation, Beams, Columns and slab as per the requirement based on soil investigation and preparation of drawings for all components for proposed construction and submission of drawings 6 copies = 2 soft copies afet getting approval from the competent authority including all material labour lead lift etc.,
Cutting and uprooting the existing trees and clearing the same away from the site as directed by the Engineer at site. (Small sized trees)
Cutting and uprooting the existing trees and clearing the same away from the site as directed by the Engineer at site. ( Medium sized trees)
Cutting and uprooting the existing trees and clearing the same away from the site as directed by the Engineer at site. (Uprooting & Removing Large Palmyrah/Coconut Stumps)
Cutting and uprooting the existing trees and clearing the same away from the site as directed by the Engineer at site. (Uprooting & Removing Large Palmyrah/Coconut Stumps)
Cutting and uprooting the existing trees and clearing the same away from the site as directed by the Engineer at site. ( Clearing of Juliflora with uprooting in Yard Portion clearing of Juliflora with uprooting in Yard portion)
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_773047.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].