| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹9.4 L+₹22,267.42 (2.42%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Devarasan L1 | MAHENDRAN CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Providing CC Pavement at Balaji Nagar 1st Street CC Road To PUM School H/O Goundampalayam Panchayat Rasipuram Block at Namakkal District under AGAMT II 2025 26 | |||||
| 2.00 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting as per SS 20B ete complete.,For Foundation | 30.9 | Cum | 123 ₹3,800.7 Lowest | 130 ₹4,017 |
| 3.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 45.58 | Cum | 277.25 ₹12,637.06 Lowest | 290 ₹13,218.2 |
| 4.00 | Plain Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation | 57.94 | Cum | 4,986.5 ₹2,88,917.81 Lowest | 5,050 ₹2,92,597 |
| 5.00 | Supplying and Erection Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 270.38 | Sqm | 344.3 ₹93,091.83 Lowest | 354 ₹95,714.52 |
| 6.00 | Plain Cement concrete 1:2:4 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation | 15.45 | Cum | 6,364.5 ₹98,331.53 Lowest | 6,500 ₹1,00,425 |
| 7.00 | Plain Cement concrete 1:1.5:3 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation | 39.98 | Cum | 7,011.5 ₹2,80,319.77 Lowest | 7,250 ₹2,89,855 |
| 8.00 | Supply and fixing of Bitumenpad charge | 8 | Sqm | 232.2 ₹1,857.6 Lowest | 250 ₹2,000 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,40,212 ₹1,40,212 Lowest | 1,43,609 ₹1,43,609 |
Tender Value
₹9.4 L
EMD Value
₹9,380
Closing Date
11 Jul 2025, 3:00 pmClosed
The Block Development Officer (VP), Rasipuram
The Block Development Office, Rasipuram
Providing CC Pavement at Balaji Nagar 1st Street CC Road To PUM School H/O Goundampalayam Panchayat Rasipuram Block at Namakkal District under AGAMT II 2025 26
2025_RDTN_578053_2
780/2025/T2 Dt.04.07.2025
Open Tender
Civil Works - Others
Works
90 days
Goundampalayam
Required Documents as per Schedule
4 documents required · 4 mandatory
₹0
₹9,380
Yes
10 Oct 2025
4 Jul 2025
11 Jul 2025
4 Jul 2025
11 Jul 2025
4 Jul 2025
Amount
Providing CC Pavement at Balaji Nagar 1st Street CC Road To PUM School H/O Goundampalayam Panchayat Rasipuram Block at Namakkal District under AGAMT II 2025 26
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting as per SS 20B ete complete.,For Foundation
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Plain Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and Erection Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Plain Cement concrete 1:2:4 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Plain Cement concrete 1:1.5:3 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supply and fixing of Bitumenpad charge
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
MAHENDRAN CONTRACTOR (BID ID -1399055)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_690810.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .