| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.5 LAccepted-AOC CHANDRONA TEHSIL NOHRADHAR DISTRICT SIRMOUR H P | ₹5.5 L Quoted ₹5.7 L | L-1 | Accepted-AOC Bidder quoted a lowest rate in submitted bids. |
| 2 | L-2₹5.6 LRejected-Finance SANTOKHGARH DISTT UNA H P | UNA | HIMACHAL PRADESH | 174301 | ₹5.6 L | L-2 | Rejected-Finance Bidder quoted a higher rate then L-1. |
| 3 | L-3₹5.8 LRejected-Finance BILASPUR | ₹5.8 L | L-3 | Rejected-Finance Bidder quoted a higher rate then L-1. |
Tender Value
₹5.3 L
EMD Value
₹5,333
Closing Date
22 Dec 2025, 11:00 amClosed
Sr. Executive Engineer
Sr. Executive Engineer ED HPSEBL Amb
Tender for prov. new 11/0.4 KV, 100 KVA S/Stn. Along with 11 KV HT line at Nagar Panchyat Amb at Nehrian road near GSSS Amb and re conductucting of 11 KV Feeder from truck union Amb point to main chowk Amb ( with 7/4.26 MM2) to improve the low vol
2025_HPSEB_123631_1
AED135/2025-26
Open Tender
Electrical Works
90 days
Sr. Executive Engineer ED HPSEBL Amb
Please refer a tender document.
2 documents required · 2 mandatory
₹590
₹5,333
23 Apr 2026
16 Dec 2025
22 Dec 2025
16 Dec 2025
22 Dec 2025
16 Dec 2025
Erection of PCC Single Pole 9 Mtr. Long:- Digging of Pit fixing of insulator and drilling of holes in X-Arm , Bracing Set, Top Clamp, errection of pole, fixing of barbed wire and danger plate, filling of Pit and ramming, painting of poles complete in all respect.
Erection of Earthing Set HT:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
Stringing and sagging conductor:- Laying of conductor stringing and sagging, binding with insulator complete in all respect.
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.(Duble wire)
Fixing jumper complete in all respect.
Transportation / Mannual carriage of material at destination site.
HT Line
Prov. STP Pole 9 mtr long. ( Qty.:- 1, Unit :- No. Provided by HPSEBL)
Prov. RCC Muff with Concrete Filling. ( Qty.:- 1 , Unit :- No. Provided by HPSEBL)
Prov. AAAC 7/3.15 ( 55 mm²) i/c 3% cutting,wastage & sagging ( Qty. - 0.093 Km, Provided by HPSEBL )
Prov. G.I.Wire No.8 SWG for earth ( 1.01 kms ). ( Qty.:- 11 , Unit :- Kg Provided by HPSEBL)
Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm
Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures
Pole Top Bracket [MSCI:100x50x6 mm- 100 mm]
Stay set complete in all respect (4No. / Dead Structure & 2 No./Run Thro.)
Stay Wire (7/3.15 mm) (10 kg Per Stay Set) . ( Provided By HPSEBL. Qty.- 20 Kg. )
HT Earthing set complete
Half clamps
Full clamps:
11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure .
Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps,straight stapples & Bend Stapples etc.) x (3 No. conductors ) x (2 No. sides)
MS Angle Iron 50x50x6, Length: 2800 mm
Danger Plate (250X200X1.6 mm) .
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ
Red Oxide
Aluminium Paint.
Prov LT Cable 3.5 Core 120MM2
Prov LT Cable 3.5 Core 185 MM2
Erection Part of Substation
Erection of 11/0.4 KV , 100 KVA S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, AI i.e X-arml, Knee bracing set, errection of D-pole,errection of plate form, errcetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Errection of T/F, and earthing conn. to T/F G.O Switch lightning etc. errection of Stay Set, Errection of Jumper, Pipe earthing 3 Nos., Errection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect , complete in all respect.
Sub-Station Supply Material
Distribution Transformer (Ordinary), 11/0.4 kV, 100 KVA ( Qty.:- 1 , Unit :- No. Provided by HPSEBL)
Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) ( Qty.:- 2 , Unit :- No. Provided by HPSEBL)
Muffs (2000mm) with concerete filling ( Qty.:- 2 , Unit :- No. Provided by HPSEBL)
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] . ( Provided By HPSEBL, Qty.- 2 Nos.)
MS Angle Iron (50X50x6 mm), Length: 2800 x1 Nos for LA's
X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch.
Transformer Bed, Belting & Knee Bracing
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed . ( Provided By HPSEBL, Qty.- 2 Nos.)
X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos. for supporting Main Channel of Transformer] . ( Provided By HPSEBL, Qty.- 2 Nos.)
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
MS Angle Iron (35X35x5 mm), Length : 460 x 2 Nos . ( Provided By HPSEBL, Qty.- 2 Nos.)
MS Angle Iron (50X50x6 mm), Length : 950 mm x 2 Nos for Bed Knee Bracing . ( Provided By HPSEBL, Qty.- 2 Nos.)
Transformer LT Dist Box and GO Switch fixing Assembly
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos
GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length : 460 mm
GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type
D.O Fuse Unit
Surge Arrester, 9 kV Station Class (Porcelain Type)
Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
Stay set complete
Pipe Earthing Set. ( Provided By HPSEBL. Qty.- 3 Nos. )
6 SWG GI wire For Earthing. ( Provided by HPSEBL. Qty.- 15 Kg. )
LT Distribution Panel Box with MCCB(160A,3P, 35 kA, ICS = 100 % ICU, Kit- Kat 200 Amp )
Half Clamp (M.S. Flat 50X6 mm)
Full Clamps (M.S. Flat 50X6 mm)
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Copper Thimble 200 Amp
Danger Plate
LT XPle (3.5 Core) 70 mm²
Energy Meter (3-Phase, 4-Wire) DLMS compliant 5A CT-100 Type for 100 KVA Transformer
Aluminium Paint.
Capacitor Bank 36 KVAr for 100 KVA S/Stn.
Erection of PCC Single Pole 9 Mtr. Long:- Digging of Pit fixing of insulator and drilling of holes in X-Arm , Bracing Set, Top Clamp, errection of pole, fixing of barbed wire and danger plate, filling of Pit and ramming, painting of poles complete in all respect.
Erection of S.T Double Pole 9 Mtr. Long:- Digging of Pit fixing of insulator and drilling of holes in X-Arm , Bracing Set, Top Clamp, errection of pole, fixing of barbed wire and danger plate, filling of Pit and ramming, painting of poles complete in all respect.
Erection of Earthing Set HT:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
Stringing and sagging conductor:- Laying of conductor stringing and sagging, binding with insulator complete in all respect.
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.(Duble wire)
Fixing jumper complete in all respect.
Erection Part of GO Switch
Distmental Cost of conductor
HT Line
Prov. STP Pole 9 mtr long. ( Qty.:- 7, Unit :- No. Provided by HPSEBL)
Prov. RCC Muff with Concrete Filling. ( Qty.:- 7 , Unit :- No. Provided by HPSEBL)
Prov. AAAC 7/3.15 ( 55 mm²) i/c 3% cutting,wastage & sagging ( Qty. - 0.093 Km, Provided by HPSEBL )
Prov. G.I.Wire No.8 SWG for earth ( 1.01 kms ). ( Qty.:- 11 , Unit :- Kg Provided by HPSEBL)
Cross Arm: [Channel Iron (100x50x6 mm), Length: 1800 mm
Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures
Pole Top Bracket [MSCI:100x50x6 mm- 100 mm]
Belt Set - MS Angle Iron 50X50X6 Mm Length 1800 MM X2 Nos.
Knee-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2 No.
X-Arm (Horizontal) - MS Channel Iron C type: 100X50x6, Length: 2340 mm x 2 No.] Δ Formation
Stay set complete in all respect (4No. / Dead Structure & 2 No./Run Thro.)
Stay Wire (7/3.15 mm) (10 kg Per Stay Set) . ( Provided By HPSEBL. Qty.- 60 Kg. )
HT Earthing set complete
Full clamps:
11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure .
Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps,straight stapples & Bend Stapples etc.) x (3 No. conductors ) x (2 No. sides)
MS Angle Iron 50x50x6, Length: 2800 mm
Danger Plate (250X200X1.6 mm) .( Provided By HPSEBL. Qty.- 27 Nos. )
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ
Barbed Wire
GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type
GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length : 460 mm
Aluminium Paint.
Prov Cross Arm ( Channel Iron 100X50X5 MM) Length 1270 MM for Cantilever
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Bid135.rar
Tender Documents • 9.85 MB
BOQ_181545.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid