| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹10.7 L+₹34,478.59 (3.34%)Rejected-Finance | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | BALA THIRAVIAMARTHANDAN H1 | T. KUMARASWAMI WORKS CONTRACTOR H2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on the bank with initial lead and lift of 10 metres and initial lift of 2 metres in hard stiff stiff clay stiff block cotton hard red earth murram, gravel stoney earth and earth mixed with small size boulders and hard gravelly soils (SS 20 B) etc., complete as per standard specification | 21 | m3 | 251.45 ₹5,280.45 | 243.32 ₹5,109.72 Lowest |
| 2.00 | Plain Cement concrete 1:4:8 (one cement, four sand and eight aggregates) using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS | 6 | m3 | 5,237.93 ₹31,427.58 | 5,068.47 ₹30,410.82 Lowest |
| 3.00 | R.C.C.1:1 1/2:3 mix using 20mm ISS HBG metal including Cost and conveyance and all labour charges for mixing laying finishing and curing etc complete but excluding cost of steel & Centering charges etc., complete as per SS | 24 | m3 | 8,990.55 ₹2,15,773.2 | 8,699.67 ₹2,08,792.08 Lowest |
| 4.00Supplying and erecting Steel Centering including necessary supports for plane sufaces in foundation and in all floors for RCC Column Beams , using mild steel sheets of suitable size 90cm x 60cm and 10 gauge stiffened with including all labour charges etc., complete. | |||||
| 5.00 | Column | 35 | m2 | 847.74 ₹29,670.9 | 820.32 ₹28,711.2 Lowest |
| 6.00 | Plain surface | 35 | m2 | 319.27 ₹11,174.45 | 308.94 ₹10,812.9 Lowest |
| 7.00 | RCC work | 54 | m2 | 705.84 ₹38,115.36 | 683 ₹36,882 Lowest |
| 8.00 | Supplying, fabricating and placing in position of mild steel or TMT rods, including cost of steel and binding wire and all labour charges for cutting, bending, tying and placing in position etc, complete as per SS. TNDSS NO: 97 V,VI (S6) VII (S6) VII-3 | 2,400 | Kg | 91.68 ₹2,20,032 | 88.71 ₹2,12,904 Lowest |
| 9.00 | Brick work in cement mortar 1:5 mix using (One cement and five sand) using best quality of country bricks of size (8 3/4"x41/4"x 23/4" ) for foundation including curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 22 | m3 | 6,523.87 ₹1,43,525.14 | 6,312.8 ₹1,38,881.6 Lowest |
| 10.00 | Plastering with cm 1:3 mix (One Cement and Three Sand), 10mm thick cost and conveyance of all materials finishing, curing and all labour charges etc complete as per standard specification. | 45 | m2 | 314.63 ₹14,158.35 | 304.45 ₹13,700.25 Lowest |
Tender Value
₹12.5 L
EMD Value
₹12,500
Closing Date
13 Aug 2025, 3:00 pmClosed
Agastheeswaram town panchayat
Executive Officer Agastheeswaram Town Panchayat
Construction of Auditorium at 5th ward Nadankulam Near Esakki Amman kovil in Agasteeswaram town panchayat
2025_DTP_588244_1
96/2025/A1
Open Tender
Civil Works
Works
180 days
Agastheeswaram Town Panchayat
4 class and above
3 documents required · 3 mandatory
₹0
₹12,500
Yes
Agastheeswaram Town Panchayat
26 Nov 2025
4 Aug 2025
14 Aug 2025
4 Aug 2025
13 Aug 2025
4 Aug 2025
4 Aug 2025 - 13 Aug 2025
5 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .