| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹128.5 CrAccepted-AOC | ₹128.5 Cr | L1 | Accepted-AOC Quoted Low Rate |
| 2 | L2₹136.7 CrRejected-Finance | ₹136.7 Cr | L2 | Rejected-Finance QUOTED HIGHRATE |
| 3 | L3₹137.4 CrRejected-Finance | ₹137.4 Cr | L3 | Rejected-Finance QUOTED HIGHRATE |
| 4 | L4₹138.3 CrRejected-Finance B 31 32 2ND FLOOR INDUSTRIAL ESTATE NEW POWER HOUSE ROAD JODHPUR 342003 RAJASTHAN | JODHPUR | RAJASTHAN | 342003 | ₹138.3 Cr | L4 | Rejected-Finance QUOTED HIGHRATE |
| 5 | L5₹142.1 CrRejected-Finance 24 MISSION COMPOUND AJMER ROAD JAIPUR 302001 RAJ | JAIPUR | JAIPUR | RAJASTHAN | 302001 | ₹142.1 Cr | L5 | Rejected-Finance QUOTED HIGHRATE |
Tender Value
₹139.5 Cr
EMD Value
₹2.8 Cr
Closing Date
5 Oct 2021, 6:00 pmClosed
Chief Engineer, PMC RRWS and FMP, PHED Nagaur
Office of Chief Engineer, PMC RRWS and FMP, PHED Nagaur, Nagaur Bikaner NH-89, Gogelav Headworks Nagaur
Retro-fitting Work for Providing Water Supply through FHTCs in 153 MH and 259 OH of Merta, Mundwa, Degana and Khinvsar Blocks, Distt. Nagaur with 10 year Operation and Maintenance after 01 year defect liability period under JJM(Phase-I, Package-III)
2021_PHCJ_238375_1
NIB No. 06/2021-22
Open Tender
Civil Works - Water Works
457 days
Merta, Mundwa, Degana and Khinvsar Blocks (Nagaur)
As per detailed NIB and Tender Documents enclosed.
4 documents required · 4 mandatory
₹50,000
Executive Engineer, PHED Project Division, Nagaur
₹2.8 Cr
Yes
Nagaur
23 Dec 2021
27 Aug 2021
6 Oct 2021
27 Aug 2021
5 Oct 2021
15 Sept 2021
27 Aug 2021 - 13 Sept 2021
13 Sept 2021
Amount
Construction of RCC air valve pillar including GI pipes, flanges, bend, MS clamps, rubber sheet, nut bolts/jointing materials etc in M-20 grade cement concrete of 2m height from Natural Ground Level in required shape and size as per approved drawing in all types of soils/rock disposing of surplus excavated materials within a lead of 50 m as per approved drawing complete including all charges at appropriate location in pipeline as per specification mentioned in the scope of work and as per direction of Engineer In Charge. G.I pipes and fittings of dia.
Construction of RCC valve chamber for different type of valves including earthwork excavation, 100mm PCC M10 (1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) as leveling course, RCC M20 grade (1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20mm nominal size) for base slab, side wall & cover slab all 125mm thick with C.I. surface box with hinged cover 100x100x75mm (deep), including cost of steel reinforcement not less than 80kg per cum CC, form work, proper curing of concrete work complete in all respect as per standard specifications and drawings and as directed by Engineer.
60cm x 60cm x 75cm (depth) for 80/100/125/150 mm dia valve
90cm x 90cm x 100cm (depth) for 200/250/300 mm dia valve
Extension Spindles for Gate Valves -600 mm for Water Supply System including surface box for service connection valves as per the approval of Engineer In Charge
Surface Box for Extension Spindle
Construction of Village Transfer Chambers
MSITC of Battery Operated Ultrasonic Flow Meter Application: Clear water Electronics Transmitter: Field Mount Weather Proof IP67 Number of Paths: Single Power Supply: Battery Operated MOC Electronics Enclosure: Aluminium Die Cast Electrical Connection: M20 *1.5 F Communication Output: GSM (Per day 1 SMS for 2 Mob. No.) Process Pressure Calibration Range: 10 Kg Spool Piece: With Spool Piece Electronics: Remote with 10 Mtr cable Flow Tube Protection Class: IP 68 Process Connection: Flanged Material of construction - Flange: MS Flange Standard and Rating: ANSI 150 B16.5 Material of construction - Flow Tube: SS 304 Material of construction - Sensor: SS 304 Insertion Flow Sensor Installation: Fixed Inline Pressure Sensor: 10 Kg Accuracy: ± 0.5% of F.S. Low Battery indication: Provided including all materials and making connection with existing pipeline required for Ultrasonic Flow Meter including cutting the existing pipeline etc. complete in all respect as per technical specification and as per direction of Engineer In-Charge.
80 mm dia
100 mm dia
150 mm dia
200 mm dia
250 mm dia
300 mm dia
Provision for replacement of Impeller of existing Mather+Platt (Wilo) make pumping set Modal No. SCP-125-330-HA with base plate and coupling at GAGUDA Pump House. (1W+1S) Make:- M/s WILO
Providing, installation, testing, trial run and commissioning of the following, as per the specifications
Providing, installation, testing and commissioning of soft starters, for each pump-set, complete in all respect as per the scope of work & specifications. (Total new pumping set to be instaled are (3W+3S)
Providing, installation, testing and commissioning of MCC with panels housing motor starters relays, MCB/MCCBs, bus-bar for all pump sets including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications .
Providing, installation, testing and commissioning of capacitor control panels, housing power factor control system panel/capacitors (APFC Panel), other accessaries including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications.
Provision for removing and refixing of impeller in the existing pump set
Provision for removing and refixing of Pumpsets in the existing pump house
Providing, installation, testing, trial run and commissioning of the following, as per specifications
Providing and fixing at site with necessary packing, Horizontal Centrifugal Split Casting pumps with 4 pole induction motor operating at syncronised speed of speed 1500 RPM as per IS 12615: 2011 or amended up to date , CI casing and casing ring, SS 316 impeller, SS 410 Shaft and shaft sleeve, coupling guard, common base plate, foundation bolts, Cement concrete foundation etc. complete with all respect as per the specification and scope of work and direction of Engineer in Charge of following range of duty conditions. Note: Duty condition of required pump shall also be mentioned in BoQ.
OLADAN & DESHWAL PROPOSED OHSR route 7 LPS / 65 m head/9 KW (1W+1S)
MANGLIYAWAS, BANKALIYA & ROL CHANDAWATA OHSR route 15 LPS / 70 m head/25 KW (1W+1S)
JARODA KALAN, DHAWA, JARODA KHURD PROPOSED & SIRSALA PROPOSED OHSR route 16 LPS / 85 m head/25 KW (1W+1S)
Providing, installation, testing, trial run and commissioning of the following, as per the specifications
Providing, installation, testing and commissioning of soft starters, for each pump-set, complete in all respect as per the scope of work & specifications. (Total new pumping set to be instaled are (3W+3S) & (76*2) KW
Providing, installation, testing and commissioning of MCC with panels housing motor starters relays, MCB/MCCBs, bus-bar for all pump sets including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications .
Providing, installation, testing and commissioning of capacitor control panels, housing power factor control system panel/capacitors (APFC Panel), other accessaries including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications.
Provision for disconnecting the existing pumps and fixing new pumps
Providing, installation, testing, trial run and commissioning of the following, as per specifications
Providing and fixing at site with necessary packing, Horizontal Centrifugal Split Casting pumps with 4 pole induction motor operating at syncronised speed of speed 1500 RPM as per IS 12615: 2011 or amended up to date , CI casing and casing ring, SS 316 impeller, SS 410 Shaft and shaft sleeve, coupling guard, common base plate, foundation bolts, Cement concrete foundation etc. complete with all respect as per the specification and scope of work and direction of Engineer in Charge of following range of duty conditions. Note: Duty condition of required pump shall also be mentioned in BoQ.
GOTAN Booster 1 / 17 m head/11 KW (1W+1S)
BOOSTER 2 / 10 m head/3.7 KW (1W+1S)
PALRI PICHKIYAP BOOSTER / 11 m head/2.2 KW (1W+1S)
JARODA KALAN BOOSTER / 17 m head/5.5 KW (1W+1S)
KUMPRAS BOOSTER / 12 m head/3.7 KW (1W+1S)
TALANPUR BOOSTER 1 / 8 m head/3.7 KW (1W+1S)
TALANPUR BOOSTER 2 / 12 m head/3.7 KW (1W+1S)
Sodas / 10 m head/3.7 KW (1W+1S)
G.I. discharge pipes with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc.-
50 mm dia
G.I. common Delivery Pipes (manifold) with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc. -
50 mm dia
Providing, lowering, aligning, fixing in position Brass full way valve with C.I. wheel (screwed end)
50 mm dia
Providing, lowering, aligning, fixing in position Gunmetal non-return valve-horizontal (screwed end)
50 mm dia
Add miscellaneous item for GI pipe fittings
Provision for interconnection and fixing new pumps
Construction of RCC valve chamber for different type of valves including earthwork excavation, 100mm PCC M10 (1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) as leveling course, RCC M20 grade (1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20mm nominal size) for base slab, side wall & cover slab all 125mm thick with C.I. surface box with hinged cover 100x100x75mm (deep), including cost of steel reinforcement not less than 80kg per cum CC, form work, proper curing of concrete work complete in all respect as per standard specifications and drawings and as directed by Engineer.
60cm x 60cm x 75cm (depth) for 80/100/125/150 mm dia valve
90cm x 90cm x 100cm (depth) for 200/250/300 mm dia valve
Provision for National Highway/State Highway Crossing/ Cluster Distribution/Village Distribution by Trenchless Technology including charges to be deposited to concerned authorities at 27 locations
Provision for Railway Crossing for Rising Main/ Cluster Distribution/Village Distribution by Trenchless Technology including charges to be deposited to concerned authorities at 27 locations
Provision for PLC-SCADA System @1.5% of project cost
Provision for O&M for Ten years
Bidder Name
Amount
M/s. Goodwill Advance Construction Co. Pvt. Ltd.(GSTN-08AADCG4121G1ZZ)
Unipro Techno Infrastructure Pvt Ltd(GSTN-08AABCU1732D1ZQ)
VISHNU PRAKASH R PUNGLIA LTD(GSTN-08AAECV4526D1ZG)
OFFSHORE INFRASTRUCTURES LTD (GSTN-08AAACO1012F1Z4)
DARA ENGINEERING AND INFRASTRUCTURES PVT LTD(GSTN-08AAGCD8130P1Z7)
GCKC Projects and Works Pvt. Ltd.(GSTN-08AADCG4669D1ZK)
Zuberi Engineering Construction Private Limited(GSTN-NA)
Description of Work / Item(s)
ABSTRACT OF QUAOTED RATES
TOTAL SUM OF RATE QUAOTED IN BOQ-1
TOTAL SUM OF RATE QUAOTED IN BOQ-2
Zuberi Engineering Construction Private Limited
GCKC Projects and Works Pvt. Ltd.
Unipro Techno Infrastructure Pvt Ltd
VISHNU PRAKASH R PUNGLIA LTD
M/s. Goodwill Advance Construction Co. Pvt. Ltd.
DARA ENGINEERING AND INFRASTRUCTURES PVT LTD
M/s. Goodwill Advance Construction Co. Pvt. Ltd.
OFFSHORE INFRASTRUCTURES LTD
VISHNU PRAKASH R PUNGLIA LTD
GCKC Projects and Works Pvt. Ltd.
Unipro Techno Infrastructure Pvt Ltd
DARA ENGINEERING AND INFRASTRUCTURES PVT LTD
OFFSHORE INFRASTRUCTURES LTD
M/s. Goodwill Advance Construction Co. Pvt. Ltd.
VISHNU PRAKASH R PUNGLIA LTD
GCKC Projects and Works Pvt. Ltd.
Unipro Techno Infrastructure Pvt Ltd
DARA ENGINEERING AND INFRASTRUCTURES PVT LTD
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html