Loading…
Loading…
Tender ID
Tender Value
₹10.0 L
EMD Value
₹20,000
Closing Date
31 Jan 2026, 2:00 pmClosed
DG CIVIL
OFFICE OF DG CIVIL
IMPROVEMENT OF ROAD BY PROVIDING PAVER BLOCK NEAR 47 A G.J KHAN ROAD and ETC. IN WD-66
2026_KMC_993965_1
KMC/DG(C)/ VII/066/APAS/01/149/10/0001
Open Tender
CIVIL WORKS
Percentage
60 days
WD-66
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹20,000
11 Feb 2026
26 Jan 2026
2 Feb 2026
26 Jan 2026
31 Jan 2026
26 Jan 2026
Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (i) In ordinary soil
BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018)
ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES
Raising cover and frame of Special Inspection Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date 04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria & Adda, Page-4, Date 08.01.2018, page-12 (item -13))
Raising cover and frame of Catch Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date 04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria & Adda, Page-4, Date 08.01.2018, page-12 (item -13))
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
Supplying and Laying in the specified pattern of Interlocking Concrete Block Pavements (ICBP) with concrete blocks (with Concrete grade as specified as per Table 1 of IS 15658 : 2006) manufactured from BIS licensee manufacturer, with spacer nib (Small protruding profiles on the vertical face of a paver block used as a device for keeping minimum joint gap in between the paving blocks, as per Cl. No 3.26 of IS: 15658)and of specified size and shape with aspect ratio (The ratio of length to thickness of a paver block, as per CL.No.3.3 of IS: 15658) as per Table 2 of IS :15658 with flexural strength/breaking load as per Annexure G of IS:15658.on the prepared base course of specified CBR as per Table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with a cushion of compacted bedding sand of 25-35 mm thick (grading of the bedding sand as per clanse 6.5.1 of IRC SP 63) and filling up the gaps in between paver blocks with joint filling sand (the grading of the joint filling sand will he us per clause 6.5.2 of IRC SP 63) and completing the edges with cut blocks as per Cl. No. 8.7 af IRC SP-63(2018) with proper confinement of bedding and joint filling sand, compaction levelling and filling up of the edge gap. 50mm thick i) Grey (12th Corrigenda & addenda dated14.10.2020)
CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.29Hire charges for engaging Air Compressor machine with minimum pressure capacity of 5.0 Kg/sq.cm arrangement including all necessary equipments and operating staff, carriage, fuel, Tools and plants all complete for cutting Road / hard crust cutting with pneumatic hammer at desired point in water supply works as per direction of EIC . a) With Pneumatic hammers For minimum engagement of 8 hrs. In a day
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
SUB TOTAL
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.25 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_2431679.xls
BOQ • 0.32 MB
T.pdf
Tender Documents • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .