| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | ₹1.6 L | L1 | Accepted-AOC Below from the Estimate Rate |
| 2 | L2₹1.6 LRejected-Finance | ₹1.6 L | L2 | Rejected-Finance There are Three Tender Received, above form the Estimate Rate |
| 3 | L3₹1.7 LRejected-Finance | ₹1.7 L | L3 | Rejected-Finance There are Three Tender Received, above form the Estimate Rate |
| Sl No | Description | Qty | Unit | ABIN J POICKATTIL L3 | NEOM BUILDERS L2 | ABRAHAM JOSEPH L1 |
|---|---|---|---|---|---|---|
| 1.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 2 | m3 | 17,000 ₹17,000 | 16,692 ₹16,692 | 16,474 ₹16,474 |
| 2.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 1 | m3 | 11,000 ₹11,000 | 9,637 ₹9,637 | 9,512 ₹9,512 |
| 3.00 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 10 | m2 | 4,000 ₹4,000 | 3,970 ₹3,970 | 3,930 ₹3,930 |
| 4.00 | Paving the floor with pre-polished Concrete Anti-Skid step tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg/sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. | 2 | m2 | 4,000 ₹4,000 | 3,972 ₹3,972 | 3,906 ₹3,906 |
| 5.00 | Dadooing of walls with glazed tiles of size 15 cm x15cm x 6mm finished thickness with c.m 1:2- and polished with same color cement including all cost and convene of all materials etc.,complete | 36 | m2 | 72,000 ₹72,000 | 71,352 ₹71,352 | 70,164 ₹70,164 |
| 6.00 | Floor finishing with ceromic tiles of 20cm x20 cmx 6mm finished thickness with c.m 1:3-20mm Tk and polished with same color cement including all cost and convene of all materials etc.,complete | 14 | m2 | 18,200 ₹18,200 | 18,004 ₹18,004 | 17,794 ₹17,794 |
| 7.00 | Manufacturing supplying and fixing of MILD STEEL DOOR made out of 50 x 50 x 6 mm M.S angle for outer frame,35 X 35 X 5mm M.S.Angle for outer frame of shutter. The entire shutter area shall be covered with CRC sheets (18 G) with 5Nos, of stiffners using M.S.Flats of size 25 X 6mm at equal intervals horizontally. The corners of the frames and shutter with CRC sheets shall be welded by adopting flash butt welding or any other suitable method. Provision towards 3Nos, of Hinges incase of single shutters / 6Nos,of Hinges incase of Double shutters of 125 X 31 X 1.25mm size placed at appropriate intervals and provisions shall be made for Tower bolts 2Nos, Aldrop 1No. The frame shall be provided with 6Nos,of Hold fast of 200mm length using 50 X 6mm M.S.Flat. The entire frame and shutter shall be provided with one coat of red oxide primer including cost of hold fasts,hinges, locking arrangements, handles wind appliences etc., complete and as directed by the departemental officers. | 1.5 | m3 | 4,500 ₹4,500 | 4,369.5 ₹4,369.50 | 4,317 ₹4,317 |
| 8.00 | Painting the new walls two coats over one coat of priming with best Emulsion paint of approved colour and quality including preparation of surface and finishing neatly etc., complete complying with standard specification and as directed by the department officers etc., complete complying with standard specifications. | 66 | m2 | 29,700 ₹29,700 | 24,090 ₹24,090 | 22,506 ₹22,506 |
| 9.00 | Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors. | 6 | m2 | 1,200 ₹1,200 | 1,164 ₹1,164 | 1,158 ₹1,158 |
| 10.00 | Supplying and fixing of 500 lit capacity HDPE tank and the rate including cost and conveyance of all materials to work site and all other labour charges etc.., complete | 2 | No | 8,400 ₹8,400 | 6,552 ₹6,552 | 8,254 ₹8,254 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
28 Jan 2026, 3:00 pmClosed
THE EXECUTIVE OFFICER, NADUVATTAM TOWN PANCHAYAT
NADUVATTAM TOWN PANCHAYAT NADUVATTAM POST OOTY - THE NILGIRIS 643224
Maintenance of Toilet at Panchayat Union Primary School, Anumapuram
2026_DTP_647099_1
451/2025-4
Open Tender
Civil Works
60 days
NADUVATTAM TOWN PANCHAYAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,000
6 Jun 2026
27 Jan 2026
28 Jan 2026
27 Jan 2026
28 Jan 2026
27 Jan 2026
27 Jan 2026 - 28 Jan 2026
Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications
Paving the floor with pre-polished Concrete Anti-Skid step tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg/sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers.
Dadooing of walls with glazed tiles of size 15 cm x15cm x 6mm finished thickness with c.m 1:2- and polished with same color cement including all cost and convene of all materials etc.,complete
Floor finishing with ceromic tiles of 20cm x20 cmx 6mm finished thickness with c.m 1:3-20mm Tk and polished with same color cement including all cost and convene of all materials etc.,complete
Manufacturing supplying and fixing of MILD STEEL DOOR made out of 50 x 50 x 6 mm M.S angle for outer frame,35 X 35 X 5mm M.S.Angle for outer frame of shutter. The entire shutter area shall be covered with CRC sheets (18 G) with 5Nos, of stiffners using M.S.Flats of size 25 X 6mm at equal intervals horizontally. The corners of the frames and shutter with CRC sheets shall be welded by adopting flash butt welding or any other suitable method. Provision towards 3Nos, of Hinges incase of single shutters / 6Nos,of Hinges incase of Double shutters of 125 X 31 X 1.25mm size placed at appropriate intervals and provisions shall be made for Tower bolts 2Nos, Aldrop 1No. The frame shall be provided with 6Nos,of Hold fast of 200mm length using 50 X 6mm M.S.Flat. The entire frame and shutter shall be provided with one coat of red oxide primer including cost of hold fasts,hinges, locking arrangements, handles wind appliences etc., complete and as directed by the departemental officers.
Painting the new walls two coats over one coat of priming with best Emulsion paint of approved colour and quality including preparation of surface and finishing neatly etc., complete complying with standard specification and as directed by the department officers etc., complete complying with standard specifications.
Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors.
Supplying and fixing of 500 lit capacity HDPE tank and the rate including cost and conveyance of all materials to work site and all other labour charges etc.., complete
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
BOQ_775719.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid