Loading…
Loading…
Tender Value
₹93.7 L
EMD Value
₹1.9 L
Closing Date
16 Sept 2026, 4:00 pmDue tomorrow
Executive Engineer Hydraulic Division Gurez
Executive Engineer Hydraulic Division Gurez
Construction of flood protection works by way of Toe crates, Channelization/ re-sectioning at Gujran Nallah, Hussaingam Malangam Nallahs, Kishanganga River, Chotta/Badda Nallah at Saradaab, Dukran, Shiekhpora, Zedgay Nallah in Tulail scetor. From RD
2026_PWDJK_323954_1
(InFC) E-NIT No 16 of 2026-27 EE-Hyd-Grz-667-73 E-tendering Dated-08-09-2026
Open Tender
Civil Works
Percentage
720 days
Gurez
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,600
Executive Engineer Hydraulic Division Gurez
₹1.9 L
Executive Engineer Hydraulic Division Gurez
9 Sept 2026
9 Sept 2026
17 Sept 2026
9 Sept 2026
16 Sept 2026
9 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 4,424.83 | Cum | 187.3 | ₹8,28,770.66 |
| 1.01 | Ordinary Rock. | 491.64 | Cum | 392.8 | ₹1,93,116.19 |
| 2 | Hand-packing stones in wire-crates(GI)incl.cost of stones but excluding cost of crates. | 3,144.09 | Cum | 1,071.15 | ₹33,67,792 |
| 3 | Supply of 4mm dia G.I wire woven crates 4”x4” mesh as per ISI specification .As directed by EIC. | 12,834.68 | Sqm | 247.48 | ₹31,76,326.61 |
| 4 | Carriage of material by MT incl.loading,unloading and stacking complete job.Crates avg.lead of 130km. | 28.87 | MT | 4,324.98 | ₹1,24,862.17 |
| 4.01 | Stones avg.lead of 5km. | 2,672.47 | Cum | 236.16 | ₹6,31,130.52 |
| 5 | Carriage of materials by H/L incl.loading unloading and stacking complete job.Crates avg.lead of 200mtr. | 28.87 | MT | 211.01 | ₹6,091.86 |
| 5.01 | Stones avg.lead of 200mtr. | 2,672.47 | Cum | 390.28 | ₹10,43,011.59 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_1091920.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .