| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC 171 172 191 192 KUNDLI INDUSTRIAL ESTATE EHTP SEC 56 PHASE V KUNDLI INDUSTRIAL ESTATE SONIPAT HARYANA 131028 | SONIPAT | HARYANA | 131028 | ₹2.3 Cr | L1 | Accepted-AOC Due to L1 rate quoted |
| 2 | L2₹2.7 Cr+₹34.7 L (15.0%)Rejected-Finance G1 12 INDEXEL ENGINEERING ROAD NO 4 I P I A KOTA KOTA RAJASTHAN 324005 | KOTA | RAJASTHAN | 324005 | ₹2.7 Cr+₹34.7 L (15.0%) | L2 | Rejected-Finance Other than L1 rate quoted |
| 3 | Rejected-Technical FLAT NO A 102 ASHOKVAN RAJSHIV CO OP HSG SOC SHIV VALLABH ROAD DAHISAR EAST MUMBAI 400 068 | MUMBAI SUBURBAN | MAHARASHTRA | 400068 | - | - | Rejected-Technical Applicant does not meets the eligibility criteria |
| 4 | Rejected-Technical 25 25 SADAR BAZAR JALANDHAR CANTT | JALANDHAR | JALANDHAR | PUNJAB | - | - | Rejected-Technical Applicant does not meets the eligibility criteria |
| 5 | Rejected-Technical 801802 SAKAR IV OPP MJ LIBERARY ELLISBRIDGE ASHRAM ROAD AHMEDABAD AHMEDABAD GUJARAT 380006 | 801802 | - | - | Rejected-Technical Adverse remarks in WLR for the QE Sep 2024 by HQ CECC |
Tender Value
₹3.0 Cr
EMD Value
₹3.7 L
Closing Date
4 Feb 2025, 6:00 pmClosed
Chief Engineer Jalandhar Zone Jalandhar Cantt
HQ Chief Engineer Jalandhar Zone Jalandhar Cantt
Automation of water supply at JRC under GE(West) JRC
2024_MES_688824_1
81016/E8
Open Tender
Civil Works
Item Rate
3920 days
Jalandhar Cantt
All documents as per NIT
9 documents required · 9 mandatory
₹2,000
Garrison Engineer (West) Jalandhar Cantt
₹3.7 L
Yes
8 Jul 2025
16 Dec 2024
12 Feb 2025
16 Dec 2024
4 Feb 2025
21 Jan 2025
Amount
Note : Please refer Schedule 'A' Notes given on Serial Page No 21 to 27 of tender documents.
Design, develop, integrate and commission SCADA system alongwith various analysing equipments for water supply system as indicated in the layout diagram enclosed as per Appx ‘A’ att and as per Table (Details of installation) Appx ‘B’ attached. The SCADA system shall comprise of following :- (a) Master control station with 02 Nos personal computers with latest processor and monitors of suitable size. (b) 02 Nos UPS's with half an hour backup. (c) 02 Nos Laser printers. (d) 02 Nos Servers. (e) Data gateway. (f) SCADA software which can be operated, programmed and modified by agencies other than developer. (g) PLC/ microprocessor controllers with indoor/ outdoor applications for water sensing display, pump operation with RTU/ without RTU or microprocessor controller and microprocessor transmitter. (h) Suitable communication system including payment of bills to telecom service provider. (j) Motorised butterfly valves. (k) Pressure transmitters. (l) Ultrasonic sensors. (m) Flow meters and switches. (n) Air release solenoid valves. Notes :- (a) Design of communication system shall be done by the bidder. Cloud based server/ data storage/ communication shall not be used and only local server based system shall be designed. (b) The cost of each item shall also be attached to arrive at pricing in case of some addition/ reduction at site. (c) Operating system, system software and programming shall not be intellectual property of any agency. (d) The memory in the hard disk shall be suitable for six months data. The backup storage device/ devices shall be provided for archiving of data more than six month old.
(f) In case of addition of installations, the system shall be capable of integrating the same. (g) The responsibility of the agency is restricted to intimate mechanical and electrical failures such as failure of pumps, leakages etc. such repairs shall be carried out by MES. (h) Operation and maintenance charges to be paid separately. (j) The SCADA system should have provision of both manual and automatic operation of installations. (i) Pump House No.27 :- (a) Submersible pumpset 45 HP, - 01 No (b) Over head tank Reservoir 75000 Gallon, 21.3 Mtr (Satging) - 01 No. (c) Rising and distribution pipe line- 150 mm(Rising) and 150mm (Delivery) (d) Chemical dosing system, Pressure 4 Kg/Sqcm, 35 LPH - 01 No (ii) Pump House No.15 :- (a) Submersible pumpset 15 HP - 01 No (b) Over head tank Reservoir 50000 Gallon, 21.3 Mtr (Staging) - 01 No (c) Rising and distribution pipe line- 150 mm(Rising) and 150mm (Delivery) (d) Chemical dosing system Pressure 4 Kg/Sqcm, 35 LPH - 01 No (iii) Pump House No.20:- (a) Submersible pumpset 45 HP - 01 No (b) Over head tank Reservoir 100000 Gallon, 21.3 Mtr (Staging) - 01 No (c) Rising and distribution pipe line- 150 mm(Rising) and 150mm (Delivery) (d) Chemical dosing system Pressure 4 Kg/Sqcm, 35 LPH - 01 No. (iv) Pump House No.18 :- (a) Submersible pumpset 25 HP - 01 No (b) Over head tank Reservoir 50000 Gallon, 2 1.3 Mtr (Staging) - 01 No (c) Rising and distribution pipe line- 150 mm(Rising) and 150mm (Delivery) (d) Chemical dosing system Pressure 4 Kg/Sqcm, 35 LPH - 01 No
(v) Pump House No.26 :- (a) Submersible pumpset 15 HP - 01 No (b) Over head tank Reservoir 50000 Gallon,21.3 Mtr (Staging) - 01 No (c) Rising and distribution pipe line- 100 mm(Rising) and 100mm (Delivery) (d) Chemical dosing system Pressure 4 Kg/Sqcm, 35 LPH - 01 No (vi) Pump House No.30 :- (a) Submersible pumpset 15 HP - 01 No (b) Over head tank Reservoir 25000 Gallon,21.3 Mtr (Staging) - 01 No (c) Rising and distribution pipe line- 150 mm(Rising) and 100mm (Delivery) (d) Chemical dosing system Pressure 4 Kg/Sqcm, 35 LPH - 01 No (vii) Pump House No.01 :- (a) Submersible pumpset 45 HP - 01 No and submerssible pump set 15 HP-01 No (b) Over head tank Reservoir 50000 Gallon,18 Mtr (Staging) - 01 No and under ground sump 25000 Gallon - 01 No (c) Rising and distribution pipe line- 150 mm (Rising), 150mm (Delivery of OHT) and 100mm (Delivery of UG sump) (d) Chemical dosing system Pressure 4 Kg/Sqcm, 35 LPH - 01 No
(viii) Pump House No 38 :- (a) Submersible pumpset 30 HP - 01 No (b) Over head tank Reservoir 50000 Gallon,21.3 Mtr (Staging) - 01 No (c) Rising and distribution pipe line- 150 mm(Rising) and 150mm (Delivery) (d) Chemical dosing system Pressure 4 Kg/Sqcm, 35 LPH - 01 No (ix) Pump House No.23:- (a) Submersible pumpset 25 HP - 01 No (b) Over head tank Reservoir 50000 Gallon,21.3 Mtr (Staging) - 01 No (c) Rising and distribution pipe line- 150 mm(Rising) and 150mm (Delivery) (d) Chemical dosing system Pressure 4 Kg/Sqcm, 35 LPH - 01 No (x) Pump House No.24 :- (a) Submersible pumpset 30 HP - 01 No (b) Over head tank Reservoir 100000 Gallon,21.3 Mtr (Staging) - 01 No (c) Rising and distribution pipe line- 150 mm(Rising) and 150mm (Delivery) (d) Chemical dosing system Pressure 4 Kg/Sqcm, 35 LPH - 01 No (xi) Pump House No.31 :- (a) Submersible pumpset 25 HP - 01 No (b) Over head tank Reservoir 100000 Gallon,21.3 Mtr (Staging) - 01 No (c) Rising and distribution pipe line- 150 mm(Rising) and 150mm (Delivery) (d) Chemical dosing system Pressure 4 Kg/Sqcm, 35 LPH - 01 No (xii) Pump House No.02 :- (a) Submersible pumpset 45 HP - 01 No (b) Over head tank Reservoir 50000 Gallon,18 Mtr & 12 Mtr (Staging) - 02 Nos (c) Rising and distribution pipe line- 150 mm(Rising) - 02 Nos and 150mm (Delivery) - 02 Nos (d) Chemical dosing system Pressure 4 Kg/Sqcm, 35 LPH - 01 No
(xiii) Pump House No.04 :- (a) Submersible pumpset 45 HP - 01 No (b) Over head tank Reservoir 50000 Gallon,15 Mtr & 21.3 Mtr (Staging) - 02 Nos (c) Rising and distribution pipe line- 150 mm(Rising) - 02 Nos and 150mm (Delivery) - 02 Nos (d) Chemical dosing system Pressure 4 Kg/Sqcm, 35 LPH - 01 No (xiv) Pump House No.05 :- (a) Submersible pumpset 45 HP - 01 No (b) Over head tank Reservoir 100000 Gallon, 12 Mtr (Staging) - 02 Nos (c) Rising and distribution pipe line- 150 mm(Rising) - 02 Nos and 150mm (Delivery) - 02 Nos (d) Chemical dosing system Pressure 4 Kg/Sqcm, 35 LPH - 01 No (xv) Pump House No.19:- (a) Submersible pumpset 30 HP - 01 No (b) Over head tank Reservoir 70000 Gallon, 21.3 Mtr (Staging) - 02 Nos (c) Rising and distribution pipe line- 150 mm(Rising) - 02 Nos and 150mm (Delivery) - 02 Nos (d) Chemical dosing system Pressure 4 Kg/Sqcm, 35 LPH - 01 No
Taking down carefully old sluice valves of size 100/150 mm all as specified and directed.
Operate SCADA system during defect liability period of two years (contractor to provide month-wise breakdown details of same, No manning or deployment of manpower required).
Operation and comprehensive maintenance of SCADA system including cost of upgradation cost of spares for first year post defect liability period, operation including payment of bills by telecom service provider (contractor to provide month-wise breakdown details of same)
Operation and comprehensive maintenance of SCADA system including cost of upgradation cost of spares for second year post defect liability period, operation including payment of bills by telecom service provider (contractor to provide month-wise breakdown details of same)
Operation and comprehensive maintenance of SCADA system including cost of upgradation cost of spares for third year post defect liability period, operation including payment of bills by telecom service provider (contractor to provide month-wise breakdown details of same)
Operation and comprehensive maintenance of SCADA system including cost of upgradation cost of spares for fourth year post defect liability period, operation including payment of bills by telecom service provider (contractor to provide month-wise breakdown details of same)
Operation and comprehensive maintenance of SCADA system including cost of upgradation cost of spares for fifth year post defect liability period, operation including payment of bills by telecom service provider (contractor to provide month-wise breakdown details of same)
Operation and comprehensive maintenance of SCADA system including cost of upgradation cost of spares for sixth year post defect liability period, operation including payment of bills by telecom service provider (contractor to provide month-wise breakdown details of same)
Operation and comprehensive maintenance of SCADA system including cost of upgradation cost of spares for seventh year post defect liability period, operation including payment of bills by telecom service provider (contractor to provide month-wise breakdown details of same)
Operation and comprehensive maintenance of SCADA system including cost of upgradation cost of spares for eighth year post defect liability period, operation including payment of bills by telecom service provider (contractor to provide month-wise breakdown details of same)
Indexel Engineering Pvt LTd (BID ID -3223515)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .