| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC | ₹3.3 L | L1 | Accepted-AOC Satisfied |
| 2 | L2₹3.5 L+₹18,554.30 (5.57%)Rejected-AOC COIMBATORE | ₹3.5 L+₹18,554.30 (5.57%) | L2 | Rejected-AOC Satisfied |
| 3 | L3₹3.6 L+₹22,773.40 (6.83%)Rejected-AOC | ₹3.6 L+₹22,773.40 (6.83%) | L3 | Rejected-AOC Satisfied |
| 4 | L4₹3.6 L+₹22,775.10 (6.83%)Rejected-AOC | ₹3.6 L+₹22,775.10 (6.83%) | L4 | Rejected-AOC Satisfied |
| 5 | L5₹3.6 L+₹23,056.04 (6.92%)Rejected-AOC | ₹3.6 L+₹23,056.04 (6.92%) | L5 | Rejected-AOC Satisfied |
| Sl No | Description | Qty | Unit | S RAJATHI L2 | svasit Engineers L3 | GOVINDAN ARUL KUMARAN L5 | M. DHANDAPANI L4 | NFS CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | 1. Dismantling the damaged Reinforced Cement Concret slab as per the instruction of Departmental officers. Including all initial lead and other labour charges | 1.5 | m3 | 3,000 ₹4,500 | 1,000 ₹1,500 Lowest | 4,361 ₹6,541.5 | 4,000 ₹6,000 | 3,000 ₹4,500 |
| 2.00 | 2. Desilting in the existing drain as per the direction of departmental officers etc. completed. | 20 | m3 | 50 ₹1,000 | 10 ₹200 Lowest | 125 ₹2,500 | 90 ₹1,800 | 100 ₹2,000 |
| 3.00 | 3. Dismantling the damaged Cement Concret work as per the instruction of Departmental officers. Including all initial lead and other labour charges | 2 | m3 | 400 ₹800 | 200 ₹400 Lowest | 491 ₹982 | 400 ₹800 | 400 ₹800 |
| 4.00 | 4. Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 4 | m3 | 100 ₹400 Lowest | 150 ₹600 | 189 ₹756 | 180 ₹720 | 100 ₹400 Lowest |
| 5.00 | 5. Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 0.5 | m3 | 5,000 ₹2,500 | 4,496 ₹2,248 | 5,127 ₹2,563.5 | 4,000 ₹2,000 Lowest | 5,500 ₹2,750 |
| 6.00 | 6. Supplying and erecting Shuttering including necessary supports for plane surfaces such as Drain walls etc, using mild steel sheets of size 90x60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. | 110 | m2 | 420 ₹46,200 | 319 ₹35,090 Lowest | 459 ₹50,490 | 430 ₹47,300 | 500 ₹55,000 |
| 7.00 | 7. Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 9.99 | m3 | 6,000 ₹59,970 | 5,780 ₹57,771.1 | 5,480 ₹54,772.6 Lowest | 5,500 ₹54,972.5 | 6,700 ₹66,966.5 |
| 8.00 | 8. Plastering with cement mortar 1:5 mix 12 mm thick ( one cement five sand) per direction of departmental officers etc. completed. | 198 | m2 | 260 ₹51,480 | 250 ₹49,500 Lowest | 257 ₹50,886 | 280 ₹55,440 | 260 ₹51,480 |
| 9.00 | 9.Reinforced Cement Concrete in 1:1.5:3 Mix using 20 mm size hard broken granite Stone Jelly from approved quarry including Mixing, Laying, Compacting, Finishing, Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | 8 | m3 | 8,000 ₹63,984 | 8,000 ₹63,984 | 6,931 ₹55,434.14 Lowest | 7,300 ₹58,385.4 | 8,400 ₹67,183.2 |
| 10.00 | 10.Supplying and fabrication and placing in position steel reinforcement using mild steel/Ribbed for steel rods for all RCC work as per the design given including cost of steel and binding wire in all floors complying with standard specification and drawings etc.., | 6 | Qtl | 9,000 ₹54,000 | 9,000 ₹54,000 | 8,381 ₹50,286 | 7,926.15 ₹47,556.9 Lowest | 9,500 ₹57,000 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
18 Aug 2026, 3:00 pmClosed
Assistant Commissioner, Central Zone,Coimbatore Co
The Assisstant Commissioner, Coimbatore City Municipal Corporation, Central Zone, Hosur road, Coimbatore 641 018.
Maintenance and Repair to the Storm Water Drain at Indhira Nagar and Vinayagar Kovil Street in Ward no 47 Central zone , Coimbatore Corporation
2026_MAWS_690297_8
e2/2026-CZ
Open Tender
Civil Works
Works
90 days
Central Zone, Coimbatore Corporation
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,000
15 Sept 2026
3 Aug 2026
19 Aug 2026
3 Aug 2026
18 Aug 2026
3 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. Dismantling the damaged Reinforced Cement Concret slab as per the instruction of Departmental officers. Including all initial lead and other labour charges | 1.5 | m3 | - | - |
| 2 | 2. Desilting in the existing drain as per the direction of departmental officers etc. completed. | 20 | m3 | - | - |
| 3 | 3. Dismantling the damaged Cement Concret work as per the instruction of Departmental officers. Including all initial lead and other labour charges | 2 | m3 | - | - |
| 4 | 4. Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 4 | m3 | - | - |
| 5 | 5. Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 0.5 | m3 | - | - |
| 6 | 6. Supplying and erecting Shuttering including necessary supports for plane surfaces such as Drain walls etc, using mild steel sheets of size 90x60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. | 110 | m2 | - | - |
| 7 | 7. Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 10 | m3 | - | - |
| 8 | 8. Plastering with cement mortar 1:5 mix 12 mm thick ( one cement five sand) per direction of departmental officers etc. completed. | 198 | m2 | - | - |
| 9 | 9.Reinforced Cement Concrete in 1:1.5:3 Mix using 20 mm size hard broken granite Stone Jelly from approved quarry including Mixing, Laying, Compacting, Finishing, Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | 8 | m3 | - | - |
| 10 | 10.Supplying and fabrication and placing in position steel reinforcement using mild steel/Ribbed for steel rods for all RCC work as per the design given including cost of steel and binding wire in all floors complying with standard specification and drawings etc.., | 6 | Qtl | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.43 MB
BOQ_829849.xls
BOQ • 0.26 MB
ITB.pdf
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .