Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹82,300Accepted-Finance | 1 | Accepted-Finance FOUND ELIGIBLE | |
| 2 | 2₹88,000+₹5,700 (6.93%)Accepted-Finance | 2 | Accepted-Finance FOUND ELIGIBLE | |
| 3 | 3₹91,000+₹8,700 (10.6%)Accepted-Finance | 3 | Accepted-Finance FOUND ELIGIBLE |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
24 Jul 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/NowshERA
Strengthening by way of replacement of copper and aluminium cables with allied works at LIS Gurha
2020_IFC_100524_1
25/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
6 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Yes
Executive Engineer MID Akhnoor/Nowshera
₹2,000
Yes
Office of the Executive Engineer MID Akhnoor/Nowsh
27 Jul 2020
15 Jul 2020
25 Jul 2020
16 Jul 2020
24 Jul 2020
16 Jul 2020
18 Jul 2020
180 days
Strenghtening of worn-out/overheated 630 mm2 single core insulated aluminium cable, and (37/14) single core copper cable at LIS Gurha-I. The job involves replacement of Overheated aluminium cable from fuse system to main switch (630mm2 single core aluminium cable approx. 28mtr.) by providing/laying of new 630mm2 single core aluminium cable (approx28mtr.) and 120mm2 single core copper cable (approx. 21mtr) from change over switch to panel of any reputed make conforming to relevant ISO/ISI standards. The job involves disconnecting the power supply, thereafter disconnecting of worn-out/damaged cables using skilled labour and suitable tool/tackles .The job also involves replacement of damaged/ burnt thimbles and providing and fitting of new thimbles of suitable size properly crimped, taped and duly provided with Patch roll .Testing of cable on no load. Complete job includes the cost of cable and allied material, transportation charges, fitting and skilled labour charges at the site of LIS .complete job
M/S UK MECH AND ELECT ENGG WORKS
M/s RK Elect. Mech. Engg and fabrication works
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .