Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Finance | -33.33% | ₹3.3 L | L1 | Admitted-Finance |
| 2 | L2₹3.6 LAdmitted-Finance | -27.27% | ₹3.6 L | L2 | Admitted-Finance |
| 3 | L3₹3.9 LAdmitted-Finance | -22.50% | ₹3.9 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical LANE NO 05 HNO 56 SHIV VIHAR TALAB TILLO JAMMU | - | - | - | Not Admitted-Fee/PreQual/Technical Others-Back Date Treasury Challan uploaded |
| Rank | Bidder | Quote | Total Amount |
|---|---|---|---|
| L1 | Yash Pal Bid ID 2706856 | 33.33% below | ₹3,33,378.73 |
| L2 | Shivam Arora Bid ID 2702918 | 27.27% below | ₹3,63,681.34 |
| L3 | Asha Singh Bid ID 2707451 | 22.5% below | ₹3,87,533.4 |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
24 Jan 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
CONST OF BALANCE WORK OF COMMUNITY HALL NEAR RADHA KRISHNA MANDIR. PYT PANJORE BLOCK MARH UNDER CDF SCHEME FOR THE YEAR 2025-26
2026_RDPR_300425_2
e-NIT No. 737 REWJ of 2025-26 dated 12-01-2026
Open Tender
Civil Works
45 days
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹10,000
27 Jan 2026
12 Jan 2026
27 Jan 2026
12 Jan 2026
24 Jan 2026
12 Jan 2026
Earthwork in excavation by manual means in trenches for foundations, drains,pipes, cables etc(not exceeding 1.5 m in width) and for shafts,wells, and like not exceeding 10sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m
Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregates 40mm nominal size)
Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:2:4(1 cement : 2coarse sand : 4graded stone aggregates 20mm nominal size)
Centering and shuttering incl. Strutting propping etc. And removal of form for columns, pillars,piers etc.
Reinforced cement concrete work in beams, suspended floors,roofs having slope upto 15, landings, balconies, shelves, chajjas, lintels staircases and spiral stair cases upto five level including curing but excluding ththe cost of centering, shuttering. finishing and reinforcement with 1:1.5:3
Steel reinforcement for rcc work incl cutting bending etc
Centering and shuttering incl. Strutting propping etc. And removal of form for lintel, beams etc
Centering and shuttering incl. Struuting propping etc and removal of form for suspended floors, roofs etc.
Carriage of agg
Add cost of sign board
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_974591.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid