Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC | ₹8.5 L Quoted ₹7.0 L | L1 | Accepted-AOC Contract value includes GST. |
| 2 | L2₹7.0 LSame as L1Rejected-Finance NAHARANA PHULAPATANA P O MRACHIPUR P S BALIKUDA DISTRICT JAGATSINGHPUR PIN 754119 | JAGATSINGHPUR | JAGATSINGHPUR | ODISHA | 754119 | ₹7.0 LSame as L1 | L2 | Rejected-Finance L2 |
| 3 | L3₹7.0 LSame as L1Rejected-Finance | ₹7.0 LSame as L1 | L3 | Rejected-Finance L3 |
| 4 | L4₹7.0 LSame as L1Rejected-Finance PARADEEP | ₹7.0 LSame as L1 | L4 | Rejected-Finance L4 |
| 5 | L5₹7.0 LSame as L1Rejected-Finance | ₹7.0 LSame as L1 | L5 | Rejected-Finance L5 |
Tender Value
₹8.3 L
EMD Value
₹8,259
Closing Date
13 Jan 2026, 5:30 pmClosed
EO, Paradeep Municipality
Paradeep Municipality
Construction of drain back side of Basti near Hostel in Ward No. 11
2026_ORULB_124113_10
EO/ PDPM/ W_05_MSBY/ 2025-26
Open Tender
Civil Works - Others
Percentage
90 days
Paradeep Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹8,259
Yes
8 Jul 2026
3 Jan 2026
15 Jan 2026
3 Jan 2026
13 Jan 2026
3 Jan 2026
3 Jan 2026 - 13 Jan 2026
Earth work in all kind of soil within 50 m Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the EIC. 14
Providing spreading, filling in foundation and plinth with sand watered and rammed as per OPWD specification including cost of materials, labour, conveyance, royalty, Tools and Plants etc.all complete required for the work to finished items of work. 18
PCC (1:3:6) with 40 mm size CBHG metal including all cost of materials, labour, conveyance, royalty, T&P, water for curing etc all complete. 37
RCC work of M20 grade with 20 mm and down grade CBHGC including hosting and laying all cost of materials, labour, conveyance, royalty, T & P, water for curing etc.all complete. 57
Requirement of HYSD/ MS rod and labour for cutting, bending,binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge. 62
Rigid and smooth centering and shuttering for CC/ RCC works in foundation, plinth band and footings bases of columns mass concrete pre-cast slabs etc including false work and dismentalling then after casting including cost of materials, cess complete in ground floor. 67
Filling in foundation and plinth with excavated materials including watering and ramming as directed by the EIC 17
Cost of Primer,Paint,Painting & Letter writing over Disply board 303
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.63 MB
BOQ_574205.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .