Tender Value
₹6.4 Cr
EMD Value
₹12.9 L
Closing Date
2 Apr 2026, 3:00 pmClosed
GAUTAM KUMAR
EXECUTIVE ENGINEER, FCD NAUGACHIA
FCD NAUGACHHIA
ANWER JAMIL
CHIEF ENGINEER
A.E. Work for Removal of shoal infront of sp-5 to sp-7 under FCD, Naugachia. (Agenda No - 245/15/2026)
128039
NIT06SBD/2025-26/NAUGACHIA/GROUP-2
Open Tender
CIVIL
Bhagalpur
• REGISTRATION
• CHARACTER CERTIFICATE
• AFFIDAVIT
• KEY PERSONS
• KEY PLANT AND MACHINERIES
• SIMILAR NATURE OF WORK EXPERIENCE
• PAN/ITR/GST
• EMD
• OTHERS
• Litigation History
• Undertaking
• NOC for Debar (If required)
• ANNUAL TURNOVER
• BID CAPACITY
• WORK EXPERIENCE IN TERMS OF QUANTITY
• BANK CERTIFICATE
• EXISTING COMMITMENT
CIVIL
PERCENTAGE
L1
1
19 documents required · 19 mandatory
₹10,000
Processing Fee: 5900
₹12.9 L
Yes
CHIEF ENGINEER, FLOOD CONTROL AND DRAINAGE, WATER RESOURCES DEPARTMENT, KATIHAR, CAMP PURNEA
7 May 2026
25 Mar 2026
4 Apr 2026
25 Mar 2026
2 Apr 2026
25 Mar 2026
28 Mar 2026
Earth work by Mechanical means with help of Excavator, Tipper and Spreader in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead of ............... metre (lead will be considered as track path i.e. half of distance travelled in one cycle i.e. half of haulage path from pit to bank or embankment. Pit will be beyond 150 meter to 500 meter from centre of bank i.e. perpendicular distance from centre of bank to nearest boundary of pit will be more than 150 meter) and with all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ) Beyond 150m but upto 1/2 km
Earth work by tractor (Rajasthani) with bucket (Doli) with spreader ( Tractor leveler or tractor dozer) in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers and construction and removel of dhalas properly with lead of ............... metre (lead will be considered as perpendicular distance from C.G.of pit to C.G.of banks) and with all lifts complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ) ( Lead should be taken C.G to C.G. perpendicular to the bank maximum lead up to -150 m. Note:- Track Path may not be taken as lead. (5.1.44 )
Extra for wet earth all complete as per specifications and direction of E/I.
A.E. Work for Removal of shoal infront of sp-5 to sp-7 under FCD, Naugachia. (Agenda No - 245/15/2026)
Items
Bid Validity
Bid Security
(i) Legal Status of Bidder.
Attached or Not
Total value of civil engineering construction work performed in last five years.
Amount To be entered (Rs in Lakhs)
Amount To be entered (Rs in Lakhs)
Amount To be entered (Rs in Lakhs)
Amount To be entered (Rs in Lakhs)
Amount To be entered (Rs in Lakhs)
Work Experience of Similar nature
Maximum Quantities of work done as prime contractor in any one year during last five years.
Bidding Capacity:
Amount To be entered (Rs in Lakhs)
Availability of key items of Contractor's Equipment
Key Personnel
Evidence of accesses to Financial Resources
Proposed methodology and programme of construction.
Litigation History
Affidavit
Undertaking
Time of Completion
Registration No.
I.T. & G.S.T. Registration & clearance Certificate
NOC for Debar (If required)
Name of the work :-
Estimated Cost :-
Earnest Money :-
Cost of BOQ pay online mode :-
E-Tendering Processing fee pay on online mode only :-
Date of Completion :-
Description of Work
Earth work by Mechanical means with help of Excavator, Tipper and Spreader in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead of ............... metre (lead will be considered as track path i.e. half of distance travelled in one cycle i.e. half of haulage path from pit to bank or embankment. Pit will be beyond 150 meter to 500 meter from centre of bank i.e. perpendicular distance from centre of bank to nearest boundary of pit will be more than 150 meter) and with all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ) Beyond 150m but upto 1/2 km
Earth work by tractor (Rajasthani) with bucket (Doli) with spreader ( Tractor leveler or tractor dozer) in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers and construction and removel of dhalas properly with lead of ............... metre (lead will be considered as perpendicular distance from C.G.of pit to C.G.of banks) and with all lifts complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ) ( Lead should be taken C.G to C.G. perpendicular to the bank maximum lead up to -150 m. Note:- Track Path may not be taken as lead. (5.1.44 )
Extra for wet earth all complete as per specifications and direction of E/I.
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
6SBDNIT.pdf
NIT • 1.49 MB
order_0200.pdf
NIT • 0.38 MB
4162.pdf
NIT • 0.38 MB
LETTER NO. 704.doc
NIT • 0.54 MB
LETTER NO.274.doc
NIT • 0.34 MB
letter_0050_m.pdf
NIT • 0.50 MB
letter_0633_m.pdf
NIT • 0.13 MB
letter_686.pdf
NIT • 0.40 MB
letter_0719_m.pdf
NIT • 1.10 MB
ltr.915 dtd. 24.12.2022.pdf
NIT • 0.42 MB
HC Patna stayed limitless below in Tender.pdf
NIT • 0.62 MB
Reference Letters.doc
NIT • 35.61 MB
6SBDNIT.pdf
NIT • 1.49 MB
BOQ Spur 5-7 Shoal Removal work.xlsx
NIT • 0.02 MB
SANCTIONED BOQ SHOAL REMOVAL.pdf
NIT • 0.74 MB
TECHNICALSHEETNIT06SBDFINALGR-02.xls
NIT • 0.04 MB
SBDNIT06SBDGR-02.docx
NIT • 2.56 MB
BOQ Spur 5-7 Shoal Removal work.xlsx
NIT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .