Tender Value
₹15.0 L
EMD Value
₹37,500
Closing Date
25 Aug 2024, 4:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Directorate of Municipal Administration
G R Pattar
Installation of TC and electrical poles near Mali Yakkunde Narute Pujari Kattikar and near Polytechnic college at Sadalga town limit
DMA/2024-25/EL/WORK_INDENT23663
DMA/2024-25/EL/WORK_INDENT23663
Open
Electrical
Two Tender Document System(Two Cover)
DMA Town Municipal Council Sadalga
6 documents required · 6 mandatory
List of existing commitments and ongoing work
List of works for which tenders already submitted
Banker Details
Contractor License
Total value of civl engineering works executed and payments received in the last five years (year-wise)
₹500
₹37,500
14 Oct 2026
7 Aug 2024
29 Aug 2024
21 Aug 2024
Part A Extension of HT Line
PSC Pole - 9 Mtrs Long, 200 Kg WL Material cost
Spiral Earth Electrode Material cost
Rabbit ACSR Conductor with 1.5% Sag Material cost
PG Clamps for Rabbit Conductor Material cost
HT Single Top support with Bolts, Nuts and
Washers (MS) Material cost
11KV 45kN Disc Insulators Polymeric Type Material cost
11kV Pin Insulators Polymeric Type Material cost
Guy Set Complete Material cost
Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07 Material cost
Anti Climbing Device (10Mtrs/1 Kg GI Barbed Wire) Lumpsum Material cost
PSC Pole - 9 Mtrs Long, 200 Kg WL Erection charges
Spiral Earth Electrode Erection charges
Rabbit ACSR Conductor with 1.5% Sag Erection charges
HT Single Top support with Bolts, Nuts and
Washers (MS) Erection charges
Guy Set Complete Errection charges
Concreting Materials for Guy Sets without cement Erection charges
Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07 Erection charges
Anti Climbing Device (10Mtrs/1 Kg GI Barbed Wire) Lumpsum Erection charges
Part B Erection of 16 KVA DTC
RCC Pole - 9 Mtr Long 150KG WL (Square Sction) Material cost
Single Pole Mounted Transformer Structure (Kit) for 25/16/10KVA Transformer on 9Mtr Long RCC Pole (Square Section) Without H Frame - MS Material cost
11KV 45kN Disc Insulators Polymeric Type Material cost
11kV/433V, 16 KVA, Copper Wound 1 Phase, 50 Cys Distribution Transformer EEL-3. Material cost
Earthing Materials Pipe Type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07 Material cost
Grounding of HV Windingof Single Phase Transformer by Cast Iron Pipe of 100mm ID(Intrnal Diameter) 13mm Ihickness, 2.75 Mtrs Long with 2 part clamp out of G.I.Flat 50X6mm continuously welded around th...
Grounding of equipments with 50x6mm GI Flat & Connecting equipment to ground pit with all formation works like bending, twisting, drilling of holes & connection by welding to point of earth connection...
Guy Set Complete Material cost
8 SWG GI Wire Material cost
7/10 SWG Guy wire Material cost
9kV, 5kA, Metal oxide, 11 KV Lightening Arrestor Material cost
a) LT Protection Kit for 16KVA Material cost
b) LT Wiring (From a) Tfr Neutral bushing to LT Line , b) from Tfr Phase bushing to LT line through LT Protection Kit) Material cost
i. Al Lead Wire - 50 Sqmm Material cost
ii. Copper Lugs - 50 Sqmm Material cost
iii. PG Clamps - Rabbit to 50 Sqmm Material cost
iv. Spacers for DTC Wiring Material cost
v. Fish Plate with necessary Clamps,Bolts & Nuts etc complete (Galvanised) Material cost
11kV Solid Core Type HG Fuse Unit Material cost
Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07 Material cost
Anti Climbing Device (12Mtrs/1Kg GI Barbed Wire) Lumpsum Material cost
RCC Pole - 9 Mtr Long 150KG WL (Square Sction) Labour cost
Single Pole Mounted Transformer Structure (Kit) for 25/16/10KVA Transformer on 9Mtr Long RCC Pole (Square Section) Without H Frame - MS Labour cost
Concreting for Single Pole Mounted Transformer Structure for 16KVA Transformer on 9Mtr Long RCC Pole (Base concreting with CC 1:4: 8+ Pole concreting with CC 1:2:4 (without coping)+ providing coping ...
11kV/433V, 16 KVA, Copper Wound 1 Phase, 50 Cys Distribution Transformer EEL-3. Labour cost
Earthing Materials Pipe Type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07 Labour cost
Grounding of HV Windingof Single Phase Transformer by Cast Iron Pipe of 100mm ID(Intrnal Diameter) 13mm Ihickness, 2.75 Mtrs Long with 2 part clamp out of G.I.Flat 50X6mm continuously welded around th...
Guy Set Complete Labour cost
Concreting for Guy Sets without cement Labour cost
9kV, 5kA, Metal oxide, 11 KV Lightening Arrestor Labour cost
a) LT Protection Kit for 16KVA Labour cost
b) LT Wiring (From a) Tfr Neutral bushing to LT Line , b) from Tfr Phase bushing to LT line through LT Protection Kit) i. Al Lead Wire - 50 Sqmm ii. Copper Lugs - 50 Sqmm iii. PG Clamps - Rabbit to 5...
11kV Solid Core Type HG Fuse Unit Labour cost
Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07 Labour cost
Anti Climbing Device (12Mtrs/1Kg GI Barbed Wire) Lumpsum Labour cost
Part C Extension of LT Line
RCC Pole - 8 Mtr Long, 115 Kg WL Material cost
PSCC Pole - 8 Mtr Long, 140 Kg WL Material cost
Spiral Earth Electrode Material cost
Weasal ACSR Conductor Material cost
2 Pin Cross Arms with Clamps, Bolts, Nuts & Washers for RCC Poles Material cost
2 Pin Cross Arms with Clamps, Bolts, Nuts & Washers forPSC Poles Material cost
No. 8 Strain Insulators Material cost
1.1KV Pin Insulators with GI Pins Material cost
Guy Set Complete Material cost
RCC Pole - 8 Mtr Long, 115 Kg WL Labour cost
PSCC Pole - 8 Mtr Long, 140 Kg WL Labour cost
Spiral Earth Electrode Labour cost
Weasal ACSR Conductor Labour cost
2 Pin Cross Arms with Clamps, Bolts, Nuts & Washers for RCC Poles Labour cost
2 Pin Cross Arms with Clamps, Bolts, Nuts & Washers forPSC Poles Labour cost
Guy Set Complete Labour cost
Concreting for Guy Sets without cement Labour cost
Installation of TC and electrical poles near Mali Yakkunde Narute Pujari Kattikar and near Polytechnic college at Sadalga town limit
RCC Pole - 9 Mtr Long 150KG WL (Square Sction) Material cost
PSC Pole - 9 Mtrs Long, 200 Kg WL Material cost
RCC Pole - 8 Mtr Long, 115 Kg WL Material cost
Spiral Earth Electrode Material cost
Single Pole Mounted Transformer Structure (Kit) for 25/16/10KVA Transformer on 9Mtr Long RCC Pole (Square Section) Without H Frame - MS Material cost
PSCC Pole - 8 Mtr Long, 140 Kg WL Material cost
Rabbit ACSR Conductor with 1.5% Sag Material cost
11KV 45kN Disc Insulators Polymeric Type Material cost
Spiral Earth Electrode Material cost
Weasal ACSR Conductor Material cost
11kV/433V, 16 KVA, Copper Wound 1 Phase, 50 Cys Distribution Transformer EEL-3. Material cost
PG Clamps for Rabbit Conductor Material cost
HT Single Top support with Bolts, Nuts and
Washers (MS) Material cost
Earthing Materials Pipe Type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07 Material cost
2 Pin Cross Arms with Clamps, Bolts, Nuts & Washers for RCC Poles Material cost
11KV 45kN Disc Insulators Polymeric Type Material cost
Grounding of HV Windingof Single Phase Transformer by Cast Iron Pipe of 100mm ID(Intrnal Diameter) 13mm Ihickness, 2.75 Mtrs Long with 2 part clamp out of G.I.Flat 50X6mm continuously welded around th...
2 Pin Cross Arms with Clamps, Bolts, Nuts & Washers forPSC Poles Material cost
11kV Pin Insulators Polymeric Type Material cost
No. 8 Strain Insulators Material cost
Grounding of equipments with 50x6mm GI Flat & Connecting equipment to ground pit with all formation works like bending, twisting, drilling of holes & connection by welding to point of earth connection...
Guy Set Complete Material cost
Guy Set Complete Material cost
1.1KV Pin Insulators with GI Pins Material cost
Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07 Material cost
8 SWG GI Wire Material cost
Guy Set Complete Material cost
Anti Climbing Device (10Mtrs/1 Kg GI Barbed Wire) Lumpsum Material cost
7/10 SWG Guy wire Material cost
RCC Pole - 8 Mtr Long, 115 Kg WL Labour cost
PSC Pole - 9 Mtrs Long, 200 Kg WL Erection charges
9kV, 5kA, Metal oxide, 11 KV Lightening Arrestor Material cost
PSCC Pole - 8 Mtr Long, 140 Kg WL Labour cost
Spiral Earth Electrode Labour cost
Spiral Earth Electrode Erection charges
a) LT Protection Kit for 16KVA Material cost
Rabbit ACSR Conductor with 1.5% Sag Erection charges
b) LT Wiring (From a) Tfr Neutral bushing to LT Line , b) from Tfr Phase bushing to LT line through LT Protection Kit) Material cost
Weasal ACSR Conductor Labour cost
HT Single Top support with Bolts, Nuts and
Washers (MS) Erection charges
i. Al Lead Wire - 50 Sqmm Material cost
2 Pin Cross Arms with Clamps, Bolts, Nuts & Washers for RCC Poles Labour cost
Guy Set Complete Errection charges
ii. Copper Lugs - 50 Sqmm Material cost
2 Pin Cross Arms with Clamps, Bolts, Nuts & Washers forPSC Poles Labour cost
Concreting Materials for Guy Sets without cement Erection charges
iii. PG Clamps - Rabbit to 50 Sqmm Material cost
Guy Set Complete Labour cost
Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07 Erection charges
iv. Spacers for DTC Wiring Material cost
Concreting for Guy Sets without cement Labour cost
v. Fish Plate with necessary Clamps,Bolts & Nuts etc complete (Galvanised) Material cost
Anti Climbing Device (10Mtrs/1 Kg GI Barbed Wire) Lumpsum Erection charges
11kV Solid Core Type HG Fuse Unit Material cost
Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07 Material cost
Anti Climbing Device (12Mtrs/1Kg GI Barbed Wire) Lumpsum Material cost
RCC Pole - 9 Mtr Long 150KG WL (Square Sction) Labour cost
Single Pole Mounted Transformer Structure (Kit) for 25/16/10KVA Transformer on 9Mtr Long RCC Pole (Square Section) Without H Frame - MS Labour cost
Concreting for Single Pole Mounted Transformer Structure for 16KVA Transformer on 9Mtr Long RCC Pole (Base concreting with CC 1:4: 8+ Pole concreting with CC 1:2:4 (without coping)+ providing coping ...
11kV/433V, 16 KVA, Copper Wound 1 Phase, 50 Cys Distribution Transformer EEL-3. Labour cost
Earthing Materials Pipe Type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07 Labour cost
Grounding of HV Windingof Single Phase Transformer by Cast Iron Pipe of 100mm ID(Intrnal Diameter) 13mm Ihickness, 2.75 Mtrs Long with 2 part clamp out of G.I.Flat 50X6mm continuously welded around th...
Guy Set Complete Labour cost
Concreting for Guy Sets without cement Labour cost
9kV, 5kA, Metal oxide, 11 KV Lightening Arrestor Labour cost
a) LT Protection Kit for 16KVA Labour cost
b) LT Wiring (From a) Tfr Neutral bushing to LT Line , b) from Tfr Phase bushing to LT line through LT Protection Kit) i. Al Lead Wire - 50 Sqmm ii. Copper Lugs - 50 Sqmm iii. PG Clamps - Rabbit to 5...
11kV Solid Core Type HG Fuse Unit Labour cost
Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07 Labour cost
Anti Climbing Device (12Mtrs/1Kg GI Barbed Wire) Lumpsum Labour cost
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW-1 12825 04.doc
Tender Document • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .