Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.0 LAccepted-AOC | L1 | Accepted-AOC L1 CONTRACTOR | |
| 2 | L2₹73.7 L+₹1.7 L (2.43%)Rejected-Finance 281 BLOCK 21 M G R STREET NEYVELI CUDDALORE TAMIL NADU 607807 UDYAM TN 04 0047548 | CUDDALORE | TAMIL NADU | 607807 | L2 | Rejected-Finance L2 CONTRACTOR |
Tender Value
Refer Docs
EMD Value
₹78,000
Closing Date
25 Jun 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional collector(D) DRDA Madurai
O/O of Additional collector DRDA Madurai
Madurai District Strenthening and Black Topping of Muruganeri-M.sengulam road KM 0/0-1/640 in T.Kallupatti Block under NABARD RIDF (2025-26) Package no 04
2025_RDTN_567646_5
DIPR/2866/TENDER/MDU NABARD
Open Tender
Civil Works
Item Rate
180 days
T.Kallupatti
Refer Tender document
4 documents required · 4 mandatory
₹0
₹78,000
O/O of Additional collector DRDA Madurai
9 Jul 2025
17 Jun 2025
25 Jun 2025
17 Jun 2025
25 Jun 2025
20 Jun 2025
19 Jun 2025
Amount
Strenthening and Black Topping of Muruganeri-M.sengulam road KM 0/0-1/640
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 B
For Road
For Core wall
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over BM surface using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying Bituminous Concrete to 25/30/40 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP using( Vibratory Roller)
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Cement Concrete 1:4:8 (One Cement, Four sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. (BELOW GROUND LEVEL)
Plain Cement Concrete 1:3:6 (one cement, three Sand and Six hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specifications and as directed by the departmental officers.
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 80mm and compacted over a thin bedding M.Sand layer of 25 mm thickness and joints shall be filled by fine M.Sand of specified grading as per table 1500.6 of Specification of Rural roads-2014 and Technical specification clause 1504.
Provision for Kilometer stone
Provision for Hectometer Stone
Strenthening and Black Topping of Muruganeri-M.sengulam road KM 0/0-1/640
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
THIRUMURUGAN AND CO (BID ID -1379257)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .