| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹6.2 L+₹1,685.60 (0.27%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
₹7.5 L
EMD Value
₹7,500
Closing Date
18 Mar 2024, 3:00 pmClosed
The Assistant Commissioner,
North Zone, Coimbatore Corporation, Balasundaram Road,Oppsite Womens Polytechnic
Construction of Storm water drain at Bharathiyar road Manikarampalayam in ward no 19, north zone
2024_MAWS_443794_14
E9/NorthZone/2023-24
Open Tender
Civil Works
Works
90 days
North Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹7,500
12 Jul 2025
7 Mar 2024
19 Mar 2024
7 Mar 2024
18 Mar 2024
7 Mar 2024
Amount
Dismantling the existing damaged cement concrete including all labour charges etc complete.,
Desilting of existing drain with all labour charges etc., complete.
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete
Conveying of excavated earth upto a distance of 15 Km including all charges etc., complete
Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Reinforced cement concrete 1:1.5:3, (one cement,one half m sand and three aggregate) using 20mm ISS HBG metal including cost and conveyance of all materials and labour charges
Plain cement concrete 1:3:6, (one cement, three m sand and six aggregate) using 20mm ISS HBG metal including cost and conveyance of all materials and labour charges
Plastering in cement mortar 1:5 (one cement and five sand),12mm thick including cost and conveyance of all materials and labour charges etc., complete
Add :- GST @ 18%
P GNANASEKAR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_529152.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .