Loading…
Loading…
Tender Value
₹2.0 Cr
EMD Value
₹2.5 L
Closing Date
22 Dec 2025, 3:00 pmClosed
Construction of FOB and other allied works at Level Crossing no. 20 of Bhartana station in connection with ROB no.5,13 & 20 on ALD-CNB & CNB-TDL section under Dy.CE/C/kanpur on Prayagraj division of North Central Railway.
CNB2025202605~NCR
CNB2025202605
Open
Works - General
12 Months
Kanpur Nagar, Uttar Pradesh
₹0
₹2.5 L
22 Dec 2025
29 Nov 2025
8 Dec 2025
01-Schedule 01 USSOR 2021
02-CPWD DSR Items
Item Breakup - 01-Schedule 01 USSOR 2021
With provision of one 50mm wide Metre retro-reflective tape in horizontal direction, duly secured/tight with vertical posts. Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
All kinds of soils DYCE-C-CNB-ENGINEERING/NORTH CENTRAL RLY
P r o v id in g and laying in position cum machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design a n d in that case deduction shall be made as per relevant item. P r o v id in g and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design a n d in that case deduction shall be made as per relevant item.
Abutment & Pier DYCE-C-CNB-ENGINEERING/NORTH CENTRAL RLY
Providing and laying Plain Cement cum Concrete 1:3:6 with graded stone aggregate of 40mm nominal size, in foundation and floors, retaining walls of bridges including mechanical mixing, vibrating, pumping and bailing out water where ever required with all materials and labour complete but excluding the cost of cement and shuttering as per drawings and technical specifications as directed by Engineer. Centering and shuttering including strutting, propping etc. and removal of form for :
All types of bridge sub-structures, Sqm e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level
All types of bridge super-structures, Sqm e.g. slabs, I-girders, T-girders, Box girders etc. up to 5m above ground level. Supply and using Cement at Worksite
Ordinary Portland Cement 43 grade MT approved brands/makes Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
Thermo-Mechanically Treated bars of Kg grade Fe-500D or more of approved brands/makes. DYCE-C-CNB-ENGINEERING/NORTH CENTRAL RLY P r o v id in g and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for cast in-situ Prestressed (Post-tensioned) concrete girder / Box girders/Slabs for different spans including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as p e r d r a w i n g s , specifications and direction of the Engineer in-charge. Note: 1. Payment for Staging, Shuttering, Cement, reinforcement, HTS cables, sheathing, anchorage cones, stressing of cables and grouting of the ducts shall be made extra under relevant items. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item.
With Soffit level up to 9m above Bed cum level
Deduction in rate of 031010, 031020 cum and 031030 for casting of slab in place of Girder for any height DYCE-C-CNB-ENGINEERING/NORTH CENTRAL RLY Supplying, fabrication, assembling of all types of steel girders of specified spans with structural steel conforming to Quality "B0" Grade Designation E250 conforming to IS:2062, erection / slewing / end launching of steel girders with cranes or any other approved launching methods as per site conditions (not requiring traffic block) on sub- structure including provision of trolley refuges etc., complete as per a p p r o v e d Q A P and drawings conforming to IRS-B1-2001 and other relevant codes and specifications. Note: 1. Detailed fabrication and erection drawings & launching methodology will be prepared by the contractor and got approved from Railway. 2. The rate is all inclusive including launching in position, complete in all respect except cost of (i) Painting / Metalising; (ii) Bearings & (iii) HSFG bolts which shall be paid extra under relevant item. 3. The payment shall be made on the theoretical weight of main components and gusset plates only. 4. Payment Schedule: (i) Receipt of material at site: 40% (ii) Fabrication of girders: 20% (iii) Erection/Launching: 20% (iv) Completion in all respects: 20%
Plate Girder/Composite Girder (Steel Work)
Supplying and fixing HSFG bolts of Kg any dia and any length with suitable n u t s including DTI washers conforming to IRS-B1-2001 for bridges and s t e e l structures with contractors labour, tools and plants and lead and lift etc., complete. Metallizing of steel work of girders with sprayed aluminium after surface preparation by Sand/grit blasting, followed by one coat of etch primer (IS:5666) & one coat of Zinc Chrome primer (IS:104) and two coats of aluminium paint (IS:2339) with all labour, T&P and material as a complete job duly conforming to all relevant specifications and process given under Clause 39 of IRS-B1- 2001. Note: Nominal Thickness of sprayed Aluminium coating shall be 150 microns. DFT of Zinc chrome primer shall be 25-30 microns and DFT of each coat of Aluminium paint shall be 12-14 microns.
On new girder during fabrication DYCE-C-CNB-ENGINEERING/NORTH CENTRAL RLY
Supplying and fixing M.S. Angles Kg 65mmx 65mmx 8mm or any other size conforming to IS:2062 in the nosing of steps of stair cases of Foot Over Bridges including provision of 10mm dia, anchor bar 600mm c/c and fixing with main girder with M.S. flat, making anti-slip arrangements over the top of nosing as per approved scheme given by Engineer in charge with all material, labour, T&P as a complete job. Providing and fixing various size HTS holding down bolts conforming to r e l e v a n t Codes/Specification in concrete column or in other structures with proper nuts, bolts, washers/plates, grouting of holes with cement or epoxy concrete with all material, labour, T&P as a complete job.
With epoxy concrete grouting. Painting of cleaned plate/composite bridge girders including all scaffolding along with provision of Jhoola / hanging scaffolding ladders etc. where required.
With two coats of Aluminium paint in Sqm dual containers conforming to IS:2339 with DFT of 15 - 20 Microns for each coat.
Supplying fabricating and erecting MT welded and/or bolted and/or riveted steel work in built up sections, trusses and framed work, staging, racks, Height Gauge etc. for Steel Structures other than bridge girders, using RSJ, tees, angles and channels/flats, plates, gussets, round or square bars, cleats, bolts etc., with contractors own steel including cutting, bending, straightening, drilling, riveting, hoisting, fixing, erecting, welding, bolting etc., with Providing stiffeners wherever required as per approved drawing including applying a priming coat of a approved steel primer with all contractor's materials, labour, tools & plants, lead & lift including crossing of tracks if required etc., complete as per specification and as directed by E n g i n e e r- i n - c h a r g e . Note: The payment shall be made on the theoretical weight of main components and gusset plates only. Painting of cleaned plate/composite bridge girders including all scaffolding along with provision of Jhoola / hanging scaffolding ladders etc. where required. 19 041263(041280) Extra for working under traffic Sqm 840.00 9.32 7828.80 conditions over items 041220 to 041274 [RATE = 10%] Total 14410936.13
Item Breakup - 02-CPWD DSR Items
Item Breakup - 03-NS ITEMS
Extra for carrying out erection of FOB MT main steel girder under traffic and*or power block at day/night time. Total 39648.58
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC-2022_1.pdf
ATTACHMENT
GCCACS1.pdf
ATTACHMENT
GCCACS2.pdf
ATTACHMENT
GCCACS3.pdf
ATTACHMENT
GCCACS4.pdf
ATTACHMENT
GCCACS5.pdf
ATTACHMENT
GCCACS6.pdf
ATTACHMENT
GCCACS7.pdf
ATTACHMENT
Rly_Bd_Letter_Dt.14.05.2024.pdf
ATTACHMENT
GCCACS8.pdf
ATTACHMENT
GCCACS9.pdf
ATTACHMENT
GCCACS10.pdf
ATTACHMENT
TenderDocumentFOBBhartana.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .