Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | ₹2.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.4 L+₹5,869 (2.50%)Rejected-Finance AMBARI PO KAMALA BAGAN DIST DARJEELING WEST BENGAL 734 426 | DARJEELING | WEST BENGAL | 734426 | ₹2.4 L+₹5,869 (2.50%) | L2 | Rejected-Finance L2 |
Tender Value
₹2.3 L
EMD Value
₹4,800
Closing Date
17 Feb 2026, 11:00 amClosed
Executive Engineer (civil HQ)
The Executive Engineer (C ) HQ at 48, Market Street, Kolkata - 87
DEVELOPMENT OF THE CHAMBER OF ADDL. MUNICIPAL SECRETARY AT THE NEWLY ALLOTTED PORTION AT ROOM NO. 112,1ST FLOOR CMO BUILDINGS.
2026_KMC_1001408_1
KMC/DG(C)/EEC/HQ/25-26
Open Tender
CIVIL WORKS
Percentage
7 days
KMC AREA
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹4,800
25 Aug 2026
10 Feb 2026
19 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (G) WOOD AND PVC WORKS G. WALL PANELLING 2.Supplying, fitting and fixing boiling water proof ply conforming to IS: 710-1977 bonded with phenol formaldehyde synthetic resin conforming to IS: 848-1974 of approved make and brand fitted and fixed as per design as per approval and direction of Engineer-in-Charge. [excluding the cost of supporting frame work and teak wood batten/Lipping] In Ground Floor (iii) 9mm.(Note: For Boiling Water Resistant Block Boards reduce the above rates by 5%). For upper floor refer Item H (4) for item 1, 2, 3, 4 under subhead G | 1 | SQM | 1,304 | ₹1,302.7 |
| 2 | BUILDING WORKS (G) WOOD AND PVC WORKS G. WALL PANELLING 14Supplying fitting, fixing decorative lamination conforming to IS: 2046 : 1995 as per approved make, brand, finish and thickness with fitting, fixing the same on Particle/MDF / Ply Boards with recommended / approved adhesive with proper clipping the sides for better attachment as per direction of Engineer-incharge. The rate includes the cost of labour, adhesive and all incidental charges thereof.In ground floor Glossy/Matt/Suede excluding surface texture or metallic lustre.(i) Thickness of laminate 1.5mm (For upper floors refer to item H(4) for items 13, 14, 15, 16 under subhead G | - | SQM | 816 | - |
| 3 | BUILDING WORKS (G) WOOD AND PVC WORKS C. MISCELLANEOUS WOODWORK 1 (B) Dressed wood work in post , plate , battens . etc. fitted & fixed complete(excluding the cost of bolts only, but including the cost of nails, screws etc.)(The quantum should be corrected upto three decimals) (ii) Sal : Local. Note: Extra for Lifting Charges:-i) upto 4th floor Rs. 200/- per Cu.m per Floor.ii) Above 4th floor Rs. 250/- per Cu.m per Floor. | 0.77 | M3 | 82,631 | ₹63,870.99 |
| 4 | BUILDING WORKS (G) WOOD AND PVC WORKS F. REPAIR WORKS 6.Providing and fixing of false ceiling with powder coated exposed G.I. grid suspension system (E-Grid U-1520 or equivalent load carrying capacity with mid span deflection not exceeding 1/360 span with hanger spacing of 1200mm c/c ) consisting of Main Runner 3600 mm long, Cross Tee 1200 mm / 600 mm long and Wall Angle. The Wall Angle shall be fixed on PVC Dash Fasteners on the perimeter of the wall by steel screws with distance 300mm c/c. The Main Runners to be placed @ 1200 mm. The Cross Tee 1200mm will be inserted in the pre-cut slots of Main Runner at a regular interval of 600 mm to form a modular grid of 1200mm X 600mm. Additional Cross Tees of 600 mm shall be placed perpendicular to the Cross Tee 1200 mm long to finally form a grid of 600 mm X 600 mm. Grid of module size 600 mm X 600 mm shall be supported by 6 mm dia G.I. wire from purlins / soffit. 15mm thick OW Acoustic Board (Mineral Fiber Acoustic Ceiling Tiles) of approved patern and size 595mm X 595mm with NRC value > 0.65 should be placed in the Grid module to form a False Ceiling. All complete as per the drawing & directions of Engineer-in-charge. In ground floor.a) Acoustic False Ceiling (with 15mm thick OW Acoustic Board and E-Grid U-1520)(For upper floors refer to item H (4) for items 1 to 7 under subhead F) | - | SQM | 1,357 | - |
| 5 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER B. MISCELLANEOUS ITEMS 5 (a)Rendering the Surface of walls and ceiling with White Cement base WATER PROOF wall putty of approved make & brand.(1.5 mm thick) | - | %SQ | 122 | - |
| 6 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 7 Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor) (a) One Coat ii) Solvent based interior grade Acrylic Primer.[This item to be done under specific instruction of the Superintending Engineer] | 1 | %SQ | 3,370 | ₹3,369.97 |
| 7 | BUILDING WORKS (D) Flooring B. REPAIR AND REHABILITATION 1. A) Supplying & laying of approved brand of scratch proof, semi flexible P.V.C. blended homogeneous marble Vinyle flooring in tiles conforming to IS:3461, fixing with synthetic acrylic adhesive after preparing the floor, levelling & smothaning when necessary with suitable putty, as per the design & instruction of the Engineer-in-charge. 2 mm thick | - | SQM | 578 | - |
| 8 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | - | EA | 269.5 | - |
| 9 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 5)Carpenter (Head). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | - | EA | 358.6 | - |
| 10 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 10 Acrylic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer's specification) including cleaning and smoothning of surface. Two Coats | - | SQM | 70 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
C1.pdf
Additional Documents • 4.88 MB
form.pdf
Tender Documents • 0.68 MB
BOQ_2453806.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .