| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹65.8 LAccepted-AOC | ₹65.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹69.1 L+₹3.3 L (5.00%)Rejected-Finance PANDANESWAR BARDHAMAN BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713346 | ₹69.1 L+₹3.3 L (5.00%) | 2 | Rejected-Finance L2 |
| 3 | 3₹70.4 L+₹4.6 L (7.00%)Rejected-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹70.4 L+₹4.6 L (7.00%) | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | K R ENTERPRISE L1 | SWAPAN KUMAR AKHULI L2 | BABLU SINHA L3 |
|---|---|---|---|---|---|---|
| 1.00Part A: Transportation, installation, commissioning & trial run of one 1000mm width, 2X150kW, 6.6kV, double drive belt conveyor for a length of 69mtr from 59L/8D to 59L/10D in R-VII seam. | ||||||
| 1.01 | Loading, transportation and unloading of one breaker(6.6kV/200A), starter(6.6kV/2X150kW), LS unit from surface to 59L/8R(R-VII) with help of haulages & 100 mtr manually. (Distance- approx. 3800mtr.) | 1 | WORK | 98,649 ₹98,649 Lowest | 1,03,581 ₹1,03,581 | 1,05,554 ₹1,05,554 |
| 1.02 | Laying-hanging of 100mtr 6.6kV grade 70 sq.mm. PVCDWA cable from 62L/9R ACB to 59L/9R ACB manually. | 1 | WORK | 1,07,350 ₹1,07,350 Lowest | 1,12,718 ₹1,12,718 | 1,14,865 ₹1,14,865 |
| 1.03 | Transportation of the 1000mm width, 2X150kW, 6.6kV, double Drive Head unit Complete with Loop take up structure, lockout arrangement((10+2.5+2.56+0.945+40.21) ton) and installation at 59L/9D (R-VII) with necessary fabrication job. | 1 | WORK | 15,63,580 ₹15,63,580 Lowest | 16,41,759 ₹16,41,759 | 16,73,031 ₹16,73,031 |
| 1.04 | Transportation of 140mtr. 1000mm width PVC belting from dismantled site to 59L belt installation site(9D/59L) with help of haulages & 10mtr manually. | 1 | WORK | 31,500 ₹31,500 Lowest | 33,075 ₹33,075 | 33,705 ₹33,705 |
| 1.05 | Laying, lapping, jointing & tensioning of this 140mtr. 1000mm width PVC belting in proposed 59L belt. | 1 | WORK | 28,800 ₹28,800 Lowest | 30,240 ₹30,240 | 30,816 ₹30,816 |
| 1.06 | Taking apart 1000mm width, 2X150kW, 6.6kV, double Drive Head unit Complete with Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, baseplate, fencing etc., Loop take up structure, lockout arrangement and transportation outside panel(by haulages and manually as required)(excluding supply of materials) of previously installed belt conveyors at panel 7 (for 1 ton)
Actual calculation will be done on tonnage, breakup given ((10+2.5+2.56+100.53+0.945) ton) | 1 | WORK | 15,98,720 ₹15,98,720 Lowest | 16,78,656 ₹16,78,656 | 17,10,630 ₹17,10,630 |
| 1.07 | Unlapping & pulling out of approximately 1400 mtr. (including loop) 1000mm width PVC belting of previously installed belt conveyors at panel 7,8 and salvaging them from this panel in R-VII seam to (72L-71L)/4D in R-VII seam by the help of haulage. | 1 | WORK | 3,15,000 ₹3,15,000 Lowest | 3,30,750 ₹3,30,750 | 3,37,050 ₹3,37,050 |
| 1.08 | Transportation of 420mtr. 1000mm width PVC belting from dismantled site to extension site of the previously running belt conveyor(8D/59L) with help of haulages & 10mtr manually. | 1 | WORK | 78,950 ₹78,950 Lowest | 82,898 ₹82,898 | 84,477 ₹84,477 |
| 1.09 | Laying, lapping, jointing & tensioning of this 420mtr. 1000mm width PVC belting in extension site of the previously running belt conveyor(8D/59L). | 1 | WORK | 94,500 ₹94,500 Lowest | 99,225 ₹99,225 | 1,01,115 ₹1,01,115 |
Tender Value
₹65.8 L
EMD Value
₹82,300
Closing Date
22 Dec 2025, 11:00 amClosed
Area Engineer EnM
Office of the General Manager, Jhanjra Area, ECL
Transportation, installation, necessary fabrication, commissioning and trial run including extension of one no. 1000mm width, 2X150kW, 6.6kV, double drive belt conveyor along 59L from 8D to 22D in R-VII seam at 3n4 Incline, J.P.Colly
2025_ECL_349135_1
ECL/GM/JNR/EnM/A2/25-26/101 dated 08.12.2025
Open Tender
Miscellaneous Works
Item Rate
90 days
Jhanjra UG
Please refer Tender documents.
5 documents required · 5 mandatory
₹82,300
2 Jun 2026
10 Dec 2025
23 Dec 2025
10 Dec 2025
22 Dec 2025
11 Dec 2025
10 Dec 2025 - 17 Dec 2025
Amount
Part A: Transportation, installation, commissioning & trial run of one 1000mm width, 2X150kW, 6.6kV, double drive belt conveyor for a length of 69mtr from 59L/8D to 59L/10D in R-VII seam.
Loading, transportation and unloading of one breaker(6.6kV/200A), starter(6.6kV/2X150kW), LS unit from surface to 59L/8R(R-VII) with help of haulages & 100 mtr manually. (Distance- approx. 3800mtr.)
Laying-hanging of 100mtr 6.6kV grade 70 sq.mm. PVCDWA cable from 62L/9R ACB to 59L/9R ACB manually.
Transportation of the 1000mm width, 2X150kW, 6.6kV, double Drive Head unit Complete with Loop take up structure, lockout arrangement((10+2.5+2.56+0.945+40.21) ton) and installation at 59L/9D (R-VII) with necessary fabrication job.
Transportation of 140mtr. 1000mm width PVC belting from dismantled site to 59L belt installation site(9D/59L) with help of haulages & 10mtr manually.
Laying, lapping, jointing & tensioning of this 140mtr. 1000mm width PVC belting in proposed 59L belt.
Taking apart 1000mm width, 2X150kW, 6.6kV, double Drive Head unit Complete with Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, baseplate, fencing etc., Loop take up structure, lockout arrangement and transportation outside panel(by haulages and manually as required)(excluding supply of materials) of previously installed belt conveyors at panel 7 (for 1 ton) Actual calculation will be done on tonnage, breakup given ((10+2.5+2.56+100.53+0.945) ton)
Unlapping & pulling out of approximately 1400 mtr. (including loop) 1000mm width PVC belting of previously installed belt conveyors at panel 7,8 and salvaging them from this panel in R-VII seam to (72L-71L)/4D in R-VII seam by the help of haulage.
Transportation of 420mtr. 1000mm width PVC belting from dismantled site to extension site of the previously running belt conveyor(8D/59L) with help of haulages & 10mtr manually.
Laying, lapping, jointing & tensioning of this 420mtr. 1000mm width PVC belting in extension site of the previously running belt conveyor(8D/59L).
Transportation of the 1000mm width tail end((0.945) ton) and installation at 58L/8D.(For 1 ton)(As per committee report Sl.no. 2 ECL/GM/JNR/2024-25/303 Dt. 29.08.2024) Final amount will be calculated on tonnage(0.945 for 1000mm tail end)
Transportation of 500mtr belt sequence cable from surafce to 72L/8D(R-VII); then laying-placing them from 72L/8D starter to 59L/9D starter in R-VII seam.
Testing, trial run, alignment & commissioning of 59L belt conveyor from59L/8D to 59L/10D and previously installed belt conveyor(after extension of 5 pillars) in R-VII seam.
Supply of M.S. Nut & Bolt 5/8x2"
Supply of DA cylinder(6.2 cum)
Supply of industrial oxygen cylinder(7.1cum)
Supply of 5T Turnbukle 89 G 63-88
Part B: Twelve times extension for a length of 12 pillars 414mtr. from 59L/10D to 59L/22D in R-VII seam. Each time belt extension will be for a length of 34.5mtr.
Transportation and Installation of 34.5mtrs of belt structure(weight of 1000mm structures is 0.1457MT/mtr.)
Transportation of 70mtr.(approx) 1000mm PVC belting through haulages & 100mtr. manually to 59L(R-VII) belt extension site.
Laying, Lapping, Jointing & Tensioning of this 70 mtr. 1000mm belting and trial run.
Shifting and installation of tailend at the time of belt extension
Supply of M.S. Nut & Bolt 5/8"x2"
Part C: Civil Work
Civil foundation works for installation of 2X150kW, 6.6kV, 1000mm wide belt conveyor drive head, discharge unit, loop take-up unit and platform for VCB, Starter for proposed 59L belt conveyor of 3&4 incline, JPC.
Part D: Roof heightening by drilling and blasting in stone, cleaning, roof bolting, including cost of drill rod, drill bit for installation of proposed 59L belt conveyor in R-VII seam of 3&4 incline under JPC.
Roof heightening by drilling, blasting in stone including dressing, Cleaning with cost of drill rod and drill bit. (Excluding cost of explosive & detonator).
Roof bolting including carrying of materials from surface to u/g side, drilling, grouting & cost of drill rod and drill bit.
Total impact of GST for the purpose of CTC
SWAPAN KUMAR AKHULI (BID ID -1205962)
BABLU SINHA (BID ID -1205969)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_361861.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .