Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹21.1 L+₹2.1 L (10.9%)Accepted-Finance | L2 | Accepted-Finance ok |
Tender Value
Refer Docs
EMD Value
₹38,400
Closing Date
10 Mar 2022, 3:00 pmClosed
CWA(WnS)II
DELHI JAL BOARD GOVT OF NCT OF DELHI OFFICE OF THE CHIEF WATER ANALYST (WnS)- II HAIDERPUR WATER WORKS DELHI 110085
SITC of FUME Hood X 1, Body Shower and Eye Shower for Quality Control Laboratory, Haiderpur (ISO-9001-2015 certified).
2022_DJB_217862_1
NIT No. 18(21-22)/CWA(WnS)II HP
Open Tender
Miscellaneous Goods
Supply
30 days
Haiderpur Water Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Online Sabpaisa Portal Allahabad Bank
₹38,400
11 Mar 2022
2 Mar 2022
10 Mar 2022
2 Mar 2022
10 Mar 2022
2 Mar 2022
Supply of Body & Eye Shower with glass bathing enclosure and SS frame "The vendor shall provide overhead safety Shower integrated with eye washer and fume hood with installation and also do the necessary civil and well as wiring work in a scientific required manner. " Specifications for Safety Shower enclosed in glass shower enclosure "There shall be safety shower cum eye washer for decontamination of body in case of any toxic or Chemical contamination. It shall be dual operation with hand or foot. The same will be enclosed in Glass enclosure with proper water supply system and drainage system. The height of Shower and Bowl will be adjustable. " "Material of Construction: Shower: SS 304 Basin Bowl: SS 304 Shower foundation: SS 304 Filter Screens: SS 304 Activation Push Plates: SS 304 Piping: SS 304 Waste strainer: SS 304 Water Flow atomizer: ABS " "Dimensions: a. Total height: 2445+-30mm b. Shower height 2100-2400mm c. Eyewash height 850-1150mm d. Shower bowl: 10.5/8” e. Eye Water bowl: 11” f. Piping: ¾” wall thickness 2.5-3mm g. Inlet: 1” BSP, Outlet ¾” h. SS Push Plate: 2 mm thickness i. SS Pull rod: 6 mm thickness j. Foundation Diameter: 165 mm " Water Flow: 1. Inverted Directional Laminar flow. 2. Protects Nasal cavity. 3. Filter capsule prevents water clogs for uninterrupted water flow. 4. Attached Dust cover (PPCP). 5. Provided with Filter Capsule with Flow controller (Pressure range: 2.1-3kgf/cm2). 6. Provided with SS filter screen to protect from unwanted impurities. 7. Additional flow controller for pressure higher than 3Kgf/cm2 8. Under conditions of adequate pressure, minimum flow 11 L/min. Receptor Bowl: 1. Straight edged and raised basin to prevent splashing. 2. SS Bowl valve equipped with SS ball and steam SS .304 (1/2" for eyewash, 1"for shower). Drainage System: There will be a rectangular SS drain platform with perforation. The same will be minimum 60% of the area of the enclosure platform. This is need in an scientific manner to flush out the water from the system in seconds. Glass Enclosure: The above safety shower cum eye washer will be enclosed in U Type-Glass enclosure so at the time of decontamination no spill spread takes place. The glass enclosure will have tiles of good quality at the back side and three side glass that include gate (U Type). All glass will be toughened. Glass thickness: 10 mm toughened (TUFNIK or JAGUAR) Glass door: 2135 mm X 750 mm (minimum) Glass enclosure dimensions: 1066 mm Width X 1220 mm Depth X 2133 mm height Fittings, hinges and Towel bar handle, L connectors: TUFNIK or JAGUAR Shower cubical size: As per site requirement Over-head Tank: 1000 ltr (Syntex) Water supply fittings: will be PP (Astral) Drain pipes: PVC (Astral/Prince) Installation of safety Shower and Fume Hood with ducting, electric connections and plumbing and required civil work: It will be carried out by skilled team with ductwork design, fitting, electrical work (all wiring will be in the concealed conduit), required civil repairs, commissioning & tetsing of the same. (Vendor may visit the site). The whole work will be done scientifically keep in view all and future requirements of both the systems. Between the two systems i.e. safety shower and fume hood there will be backlit glass/acrylic DJB logo and lab certifications. Civil work:Demolition of existing slab and back wall tiles, re-plastering of back wall and tile work. 10' x 18' including corner of another wall (180 sq feet). Platform 10' x 5' of 2" height where safety shower and fume hood will be installed. Vitrified tile of best quality on floor 12' x 6'. There will be black granite on the platform front (12'x2"). The plumbring work that include installation of 1000 ltr water tank on the roof of the lab, connection of water of the systems, and drainage from safety shower to the drain as per specifications.
Demolition of existing slabs, tiles, sink, floor tiles, cupboard, electrical fixtures and plumbing fixtures
Installation of body shower and eye shower with glass bath and SS frame
Installation chemical styorage with fume suction system including carriage.
Fixing of eye shower with complete plumbing work to maintain pressure from DJB mainline administration block with overhead tank including all necessary work.
Fixing of floor tiles, wall tiles, complete electrical work and civil cutting of window, manhole with cover frame and all other necessary jobs.
Testing & commissioning with 365 days of on-site warranty
MAZELINOV SOLUTIONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .