Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹9.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹10.1 L+₹37,903.60 (3.90%)Admitted-Fee/PreQual/Technical/Finance | ₹10.1 L+₹37,903.60 (3.90%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹10.1 L+₹39,115.68 (4.03%)Admitted-Fee/PreQual/Technical/Finance MUTHAIAHPURAM VILATHIKULAM TK THOOTHUKUDI DISTRICT | ₹10.1 L+₹39,115.68 (4.03%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹10.1 L+₹40,587.48 (4.18%)Admitted-Fee/PreQual/Technical/Finance SF NO 348 5 TIRUPUR TO UDUMALAI ROAD GUDIMANGALAM | TIRUPPUR | TAMIL NADU | 638051 | ₹10.1 L+₹40,587.48 (4.18%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹10.1 L+₹42,059.94 (4.33%)Admitted-Fee/PreQual/Technical/Finance | ₹10.1 L+₹42,059.94 (4.33%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | G RAGUPATHY L8 | MITHRA & CO L6 | PALANI S L7 | RAMALINGAM L3 | T.MAHALINGAM L1 | KARTHIK L4 | K KARMEGAM L11 | REVATHI M L9 | MKM SIVASAKTHI CONTRACT L17 | B SENTHILKUMAR L12 | ASHOK KUMAR L15 | M. SIRANJEEVI L10 | Balakrishnan Borewell L13 | UDAYAKUMAR L2 | K KASITHEVAR L14 | SURENDRAN L5 | POOVALINGAM A L16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Name of Work : EXTENSION OF PIPE LINE GANAPATHI MANGALAM SUMP TO KEELKUDI SUMP IN KULATHUR PANCHAYAT. | ||||||||||||||||||||
| 2.00 | Earthwork Excavation in narrow trenches or laying and joijting of pipes and specials and depositing on bank with an initial lead of 10 m and initial lift of 2 m in hard stiff clay. Still black cotton, hard red earth shales murrams hard gravel soil including shoring strutting lighting and watching and tested etc., complete as directed by RDDA officers. | 2,116.8 | M3 | 240.7 ₹5,09,513.76 | 229.82 ₹4,86,482.98 | 230.79 ₹4,88,536.27 | 223.89 ₹4,73,930.35 | 211 ₹4,46,644.8 | 224.2 ₹4,74,586.56 | 250 ₹5,29,200 | 205 ₹4,33,944 | 70 ₹1,48,176 Lowest | 83.5 ₹1,76,752.8 | 260.45 ₹5,51,320.56 | 204 ₹4,31,827.2 | 256 ₹5,41,900.8 | 222 ₹4,69,929.6 | 260 ₹5,50,368 | 224.55 ₹4,75,327.44 | 187 ₹3,95,841.6 |
| 3.00 | Supply Deliverry of HDPE Pipes to confirm to ISI Specification and as amended from time to time HDPE PIPE PN6 63MM | 3,105 | rm | 90.15 ₹2,79,915.75 | 86.08 ₹2,67,278.4 | 86.45 ₹2,68,427.25 | 83.86 ₹2,60,385.3 | 83 ₹2,57,715 Lowest | 84 ₹2,60,820 | 85 ₹2,63,925 | 100 ₹3,10,500 | 94 ₹2,91,870 | 196 ₹6,08,580 | 97.75 ₹3,03,513.75 | 120 ₹3,72,600 | 95 ₹2,94,975 | 84 ₹2,60,820 | 97 ₹3,01,185 | 84.1 ₹2,61,130.5 | 145 ₹4,50,225 |
| 4.00 | Supply Deliverry of PVC Pipes to confirm to ISI Specification and as amended from time to time PVC PIPE 63MM | 255 | RM | 39.1 ₹9,970.5 | 37.36 ₹9,526.8 | 37.52 ₹9,567.6 | 36.39 ₹9,279.45 | 20 ₹5,100 Lowest | 36.45 ₹9,294.75 | 50 ₹12,750 | 50 ₹12,750 | 400 ₹1,02,000 | 81 ₹20,655 | 42.3 ₹10,786.5 | 55 ₹14,025 | 42 ₹10,710 | 21 ₹5,355 | 42 ₹10,710 | 36.5 ₹9,307.5 | 46 ₹11,730 |
| 5.00 | Conveyance of the PVC Pipes to site and lowering into trenches laying to proper grade and alignment jointing with PVC Couplers with cement paste including cost of fixing specials (Specials should be supplird by the contractor) and testing the required pressure including conveyance of water upto 1.00 KM lead for filling curing testing as directed by RDDA., Officers HDPE PIPE PN6 63MM | 3,105 | rm | 14.65 ₹45,488.25 | 13.98 ₹43,407.9 | 14.04 ₹43,594.2 | 13.62 ₹42,290.1 Lowest | 14 ₹43,470 | 13.65 ₹42,383.25 | 19 ₹58,995 | 25 ₹77,625 | 95 ₹2,94,975 | 33.1 ₹1,02,775.5 | 15.85 ₹49,214.25 | 15 ₹46,575 | 16 ₹49,680 | 15 ₹46,575 | 15.75 ₹48,903.75 | 13.66 ₹42,414.3 | 34.41 ₹1,06,843.05 |
| 6.00 | Conveyance of the PVC Pipes to site and lowering into trenches laying to proper grade and alignment jointing with PVC Couplers with cement paste including cost of fixing specials (Specials should be supplird by the contractor) and testing the required pressure including conveyance of water upto 1.00 KM lead for filling curing testing as directed by RDDA., Officers PVC PIPE 63MM | 255 | RM | 17.15 ₹4,373.25 | 16.4 ₹4,182 | 16.47 ₹4,199.85 | 15.98 ₹4,074.9 | 8 ₹2,040 Lowest | 16 ₹4,080 | 20 ₹5,100 | 23 ₹5,865 | 230 ₹58,650 | 20 ₹5,100 | 18.55 ₹4,730.25 | 17 ₹4,335 | 17 ₹4,335 | 9 ₹2,295 | 18.5 ₹4,717.5 | 16.02 ₹4,085.1 | 14.3 ₹3,646.5 |
| 7.00 | Refilling with excavated earth after the pipes are laid jointed and tested including watering ramming and consolidation etc., Complete as directed by RDDA., Officers | 2,116.8 | M3 | 33.5 ₹70,912.8 | 31.96 ₹67,652.93 | 32.1 ₹67,949.28 | 31.13 ₹65,895.98 | 32 ₹67,737.6 | 31.15 ₹65,938.32 | 40 ₹84,672 | 40 ₹84,672 | 70 ₹1,48,176 | 29 ₹61,387.2 | 36.2 ₹76,628.16 | 30 ₹63,504 | 35 ₹74,088 | 33 ₹69,854.4 | 36.2 ₹76,628.16 | 31.22 ₹66,086.5 | 15 ₹31,752 Lowest |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,65,631 ₹1,65,631 | 1,58,136 ₹1,58,136 | 1,58,809 ₹1,58,809 | 1,54,054 ₹1,54,054 | 1,48,087 ₹1,48,087 Lowest | 1,54,279 ₹1,54,279 | 1,71,836 ₹1,71,836 | 1,66,564 ₹1,66,564 | 1,87,892 ₹1,87,892 | 1,75,545 ₹1,75,545 | 1,79,315 ₹1,79,315 | 1,67,916 ₹1,67,916 | 1,75,624 ₹1,75,624 | 1,53,869 ₹1,53,869 | 1,78,652 ₹1,78,652 | 1,54,503 ₹1,54,503 | 1,80,007 ₹1,80,007 |
Tender Value
₹15.1 L
EMD Value
₹15,100
Closing Date
22 Sept 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER B.P,THITUVADANAI
UNION OFFICE THIRUVADANAI
TVD-UNION GENERALL FUND PIPE LINE KULATHUR
2026_RDTN_702216_1
TVD-UNION GENERAL FUND KULATHUR PIPE LINE
Open Tender
Civil Works
Item Rate
180 days
UNION OFFICE THIRUVADANAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,100
22 Sept 2026
8 Sept 2026
22 Sept 2026
8 Sept 2026
22 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work : EXTENSION OF PIPE LINE GANAPATHI MANGALAM SUMP TO KEELKUDI SUMP IN KULATHUR PANCHAYAT. | - | - | - | - |
| 2 | Earthwork Excavation in narrow trenches or laying and joijting of pipes and specials and depositing on bank with an initial lead of 10 m and initial lift of 2 m in hard stiff clay. Still black cotton, hard red earth shales murrams hard gravel soil including shoring strutting lighting and watching and tested etc., complete as directed by RDDA officers. | 2,116.8 | M3 | - | - |
| 3 | Supply Deliverry of HDPE Pipes to confirm to ISI Specification and as amended from time to time HDPE PIPE PN6 63MM | 3,105 | rm | - | - |
| 4 | Supply Deliverry of PVC Pipes to confirm to ISI Specification and as amended from time to time PVC PIPE 63MM | 255 | RM | - | - |
| 5 | Conveyance of the PVC Pipes to site and lowering into trenches laying to proper grade and alignment jointing with PVC Couplers with cement paste including cost of fixing specials (Specials should be supplird by the contractor) and testing the required pressure including conveyance of water upto 1.00 KM lead for filling curing testing as directed by RDDA., Officers HDPE PIPE PN6 63MM | 3,105 | rm | - | - |
| 6 | Conveyance of the PVC Pipes to site and lowering into trenches laying to proper grade and alignment jointing with PVC Couplers with cement paste including cost of fixing specials (Specials should be supplird by the contractor) and testing the required pressure including conveyance of water upto 1.00 KM lead for filling curing testing as directed by RDDA., Officers PVC PIPE 63MM | 255 | RM | - | - |
| 7 | Refilling with excavated earth after the pipes are laid jointed and tested including watering ramming and consolidation etc., Complete as directed by RDDA., Officers | 2,116.8 | M3 | - | - |
| 8 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | - | - |
stage.html
html • 0.05 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_844148.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .