Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹5,840
Closing Date
15 Jul 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Krishnan Pillai
Office of colliery engineer(Enm), Sasti workshop, near Sasti Sub Area office, Sasti pincode 442905
various pre-monsoon activities related to pumping in Sasti OCM
2022_WCL_248809_1
ba3605-enm-0030-2022-23
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Sasti OCM, Sasti
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,840
Yes
16 Jul 2022
4 Jul 2022
16 Jul 2022
4 Jul 2022
15 Jul 2022
4 Jul 2022
4 Jul 2022 - 9 Jul 2022
Amount
Shifting, lowering and assembling fabricated new pontoons in the sumps
Fabrication of walkway or baby pontoons
Transportation from the repair site and installation in the sumps
Loading, unloading and transportation of 8” MS pipe to the working site with help of departmental truck
Spreading, laying and jointing of MS pipe including inserting of rubber / belt joints with suitable nut bolts etc
Shifting of PVC cable of 3.3kV grade 50/70/90 Sq.mm
Haul Road crossing of the power cables include loading/ unloading and transportation of GI pipe to the site, handling/ shifting and erection of GI pipe cable bridge for crossing of the haul road with proper alignment for safety
Shifting of Starter and Isolators. Loading/unloading and shifting and installation placement manually/ crane
Dismantling and fitting of 8” dia flexible hose pipe including dismantling of pipes shifting, handling, laying and fixing of empty barrels (floating arrangement with proper alignment and support and complete the delivery pipeline in the sump)
Loading, unloading of MS pipes to the welding site cutting and welding to the required length again transportation to the working site and pit digging with the help of excavator laying and fitting with proper alignment and support
Loading, unloading of HT/LT pump set from various locations of the field to the Area workshop or repair site
On bed plate alignment with installation pontoon pump sets, fitting of bolts jointing of suction pipes foot valves bends delivery pieces, NR valves, Sluice valve, Cable pieces, cable supporting and hose pipe supporting etc
Total impact of GST for the purpose of CTC
A K SURYAWANSHI
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .