Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.2 LAccepted-AOC RAMGARH ORIENT COLLIERY BRAJRAJNAGAR JHARSUGUDA ODISHA 768233 | JHARSUGUDA | ODISHA | 768233 | L1 | Accepted-AOC Work Awarded to Techno-commercially evaluated L-1 Bidder. | |
| 2 | L2₹21.0 L+₹81,161.75 (4.02%)Rejected-Finance AT PO RAMPUR ORIENT COLLIERY DIST JHARSUGUDA ODISHA PIN 768233 | JHARSUGUDA | ODISHA | 768233 | L2 | Rejected-Finance Rejected as L2 | |
| 3 | L3₹25.0 L+₹4.8 L (23.8%)Rejected-Finance | L3 | Rejected-Finance Rejected as L3 | |
| 4 | L4₹25.3 L+₹5.1 L (25.3%)Rejected-Finance AT REMJA POWER HOUSE PO BRAJRAJNAGAR DIST JHARSUGUDA ODISHA PIN 768216 | BRAJRAJNAGAR | JHARSUGUDA | ODISHA | 768216 | L4 | Rejected-Finance Rejected as L4 | |
| 5 | L5₹26.2 L+₹6.0 L (29.7%)Rejected-Finance GANGAPUR UMRER DIST NAGPUR 441203 | UMRER | NAGPUR | MAHARASHTRA | 441203 | L5 | Rejected-Finance Rejected as L5 |
Tender Value
₹30.6 L
EMD Value
₹38,300
Closing Date
29 Sept 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer(Mining), Orient Area, MCL
Mining Department, Office of the General Manager, Orient Area, MCL, Brajrajnagar, Jharsuguda, Odisha
Underground Construction of 08 Nos. of R.C.C Isolation Stoppings of Lajkura Seam from 1L to 20L at 3rd Phase for sealing of all three Sections in North Flank at Orient Colliery Mine No.3, OSA, OA, MCL.
2022_MCL_256523_1
MCL/GM/OA/SO(M)/2022/ NIT-165RT/1319, Dtd-16.09.22
Open Tender
Civil Works - Others
Item Rate
200 days
Orient Colliery-3, OSA, Orient Area
PLEASE REFER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹38,300
21 Dec 2022
16 Sept 2022
30 Sept 2022
19 Sept 2022
29 Sept 2022
19 Sept 2022
19 Sept 2022 - 22 Sept 2022
Amount
Carting of coal/shale/shaly coal in u/g mine by manual loading, unloading and stacking upto a lead of 50 m.
Excavation in coal/shale in u/g mine by chiseling for making notches in galery including stacking of serviceable material & unserviceable material with a lead of 30 mtr and lift upto 1.5 mtr.
Half Brick work 1:4 in foundation and plinth in class designation 50 bricks excluding carriage of material from incline mouth to the U/G mine site.
Half brickwork in super structure, above plinth level upto floor-2 level.
Carriage of half brick materials from Incline mouth to U/G mine track end/buffer including loading in the mine car at incline mouth, rehandling in case of derailment of cars, unloading and stacking the materials at destination including taking the empty cars from U/g mine to the Incline mouth. i. upto an avg. 1km lead and also including manual carriage in ug upto an avg 50m lead in top section.
ii. upto an avg. 1km lead and also including manual carriage in ug upto an avg 150m lead in bottom section.
iii. upto an avg. 1 km lead and also including manual carriage upto an avg 200m lead in bottom section
Providing and laying in position specified grade of RCC excluding the cost of centering, shuttering, finishing, reinforcement and carriage of material from incline mouth to u/g mine site. All work upto plinth level. (1:2:4)
RCC in walls including attached plasters, buttresses, plinth and string courses, fillets, column, pillars, piers, abutments, posts and struts etc. upto floor two level excluding cost of centering, shuttering, reinforcement and carriage of material from incline mouth to U/g mine site. (1:2:4)
Carriage of PCC materials from incline mouth to U/g mine track end/buffer including loading in mine car at Incline mouth, walking along the car inside the mine, rehandling in case of derailment of the cars, unloading and stacking the materials at destination including taking the empty cars from U/g mine to Incline mouth. i. upto an avg. 1km lead and also including manual carriage in u/g upto an avg 50m lead in top section.
ii. upto an avg. 1km lead and also including manual carriage in u/g upto an avg 150m lead in bottom section
iii. upto an avg. 1km lead and also including manual carriage in u/g upto an avg 200m lead in bottom section
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete excluding carriage of materials from incline mouth to U/g mine site Cold twisted bar.
Carriage of RCC steel rod (12 mm) from Incline mouth to U/g mine track end/buffer including loading in mine car at Incline mouth, rehandling in case of derailment of the cars, unloading and stacking the materials at destination including taking the empty cars from U/g mine to the Incline mouth. i. upto an avg 1km lead in both top and bottom section.
ii. upto an avg 2km lead in Sec-4.
12 mm thick cement plaster 1:6 excluding carriage of materials from incline mouth to U/g mine site.
Carriage of cement plastering materials (only sand for storage at sites) from incline mouth to u/g mine track end/buffer including loading in mine car at Incline mouth, walking along the car inside the mine, rehandling in case of derailment of the cars, unloading and stacking the materials at destination including taking the empty cars from U/g mine to Incline mouth. i. upto an avg. 1KM lead and also including manual carriage in u/g upto an avg. 50m lead in top Section
ii. Upto an avg. 1 km lead and also including manual carriage in u/g upto an avg. 150m lead in bottom section.
iii. Upto an avg. 1 km lead and also including manual carriage in u/g upto an avg. 200m lead in bottom Section
Neat cement punning work on isolation stoppings for smooth finishing and stopping leakages.
Carriage of cement bags (only sand for storage at sites) from incline mouth to u/g mine track end/buffer including loading in mine car at Incline mouth, walking along the car inside the mine, rehandling in case of derailment of the cars, unloading and stacking the materials at destination including taking the empty cars from U/g mine to Incline mouth. i. upto an avg. 1KM lead and also including manual carriage in u/g upto an avg. 50m lead in top Section
ii. Upto an avg. 1 km lead and also including manual carriage in u/g upto an avg. 150m lead in bottom section
iii. Upto an avg. 1 km lead and also including manual carriage in u/g upto an avg. 200m lead in bottom section.
Two or more coats of black paint of approved brand on isolation stoppings for sign board.
Total impact of GST for the purpose of CTC
SOUDAMINI BISWAL
AJAYA MAHANANDA
DEBASISH SAHOO
M/s Akash Construction
stage.html
html • 0.05 MB
techsummary_265226.pdf
PDF • 0.22 MB
finsummary_265226.pdf
PDF • 0.22 MB
LOA-165RT.pdf
PDF • 0.48 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .