| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST LOWEST₹1.6 LAccepted-AOC | ₹1.6 L | 1ST LOWEST | Accepted-AOC FIRST LOWEST |
| 2 | 2ND LOWEST₹1.6 L+₹32.13 (0.02%)Rejected-Finance | ₹1.6 L+₹32.13 (0.02%) | 2ND LOWEST | Rejected-Finance NOT THE FIRST LOWEST |
| 3 | 3RD LOWEST₹1.6 L+₹64.27 (0.04%)Rejected-Finance | ₹1.6 L+₹64.27 (0.04%) | 3RD LOWEST | Rejected-Finance NOT THE FIRST LOWEST |
Tender Value
₹1.6 L
EMD Value
₹3,213
Closing Date
30 Mar 2026, 11:00 amClosed
The Assistant Engineer Burdwan Sub Div.-II SS, PWD
Office Of The Assistant Engineer Burdwan Sub Division II Social Sector P W Dte Jagatberh Surya Nagar PO Sripally Dist Purba Bardhaman
Emergent repair and maintenance work including mending of damaged underground water line and blocking of openings at C-block with other ancillary work under Burdwan Medical College and Hospital, Purba Bardhaman.
2026_WBPWD_1020837_3
WBPWD/AE/BSD-II/SS/ NIT-16eOF2025-26
Open Tender
CIVIL WORKS
Percentage
60 days
Purba Bardhaman
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,213
Yes
O/O The Assistant Engineer Burdwan Sub Div.-II SS,
15 Sept 2026
13 Mar 2026
2 Apr 2026
13 Mar 2026
30 Mar 2026
18 Mar 2026
18 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.
(a) In ground floor including roof. | 2.5 | Cum | 1,956 | ₹4,890 |
| 2 | Labour for taking out door and window frame including shutter for repair or
replacement of different parts of the frame & refixing the same including mending
good all damaes complete. (Concrete and brick work for mending damage will be paid separately)
(a) Upto area 2.5 Sq.m | 21 | Cum | 119 | ₹2,499 |
| 3 | Brick work with 1st class bricks in cement mortar (1:6)
(a) In Ground floor | 6.5 | Cu.M. | 4,990.06 | ₹32,435.39 |
| 4 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary. [Excluding cost of chipping over concrete surface]
(i) 10 mm thick plaster. With 1 : 4 cement mortar. | 20 | Sq.M | 120.55 | ₹2,411 |
| 4.01 | (ii) 15 mm thick plaster With 1:6 cement mortar | 26 | Sq.M | 133.55 | ₹3,472.3 |
| 5 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed.
staff qtr canopy | 18 | Sq.M. | 19 | ₹342 |
| 6 | Applying epoxy based reactive joining agent for joining the old concrete with fresh concrete to be applied within manufacturer's specified time as per manufacturers specification. (0.4 Kg / m² of concrete surface). | 9 | Sqm | 309 | ₹2,781 |
| 7 | Cement concrete (1:1.5:3) with graded stone chips 5.6 mm size with hexagonal square mesh wire netting, I.R.C. fabric mesh or X.P. M. fitted and fixed after tying the existing reinforcement on concrete without distributing the same and with proper scarping and cleaning the reinforcement and disturbed concrete with wire brush etc. after applying a coat of cement including the cost of wire netting I.R.C or X. P. M. & cost of all handling and scaffolding complete as per direction of Engineer-in -charge.
b) 20 mm thick
staff qtr canopy | 9 | Sqm | 483 | ₹4,347 |
| 8 | Making one set of scaffolding only for replacing glass panels, painting, uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-in-charge.
(This item should be executed only after prior approval of the Engineer-in-charge). Firstly, one number to be paid and then labour rate for shifting up to further nineteenth (19) times @ 10% each time to be considered. If necessary further after twenty times of total use, another one number new and labour rate for shifting to be considered accordingly.
e) 11.10 metre height | 2 | Each | 769 | ₹1,538 |
| 8.01 | f) Shift | 4 | Each | 76.9 | ₹307.6 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
2911ii.pdf
Tender Documents • 0.50 MB
FormVI.pdf
Tender Documents • 0.44 MB
BOQ_2512627.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .