| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC 1ST FLOOR B 11 1152 KENDRIYE VIDHALAYA NO 2 BHARAT NAGAR KANGANPUR ROAD GALI NO 12 DASHA SHAH NAGAR SIRSA 125055 | SIRSA | SIRSA | HARYANA | 125055 | ₹1.8 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹1.8 Cr+₹4.3 L (2.45%)Rejected-AOC HOUSE NO 21 22 SECTOR 16 G2 ROHINI NORTH DELHI 110085 | DELHI | NORTH DELHI | DELHI | 110085 | ₹1.8 Cr+₹4.3 L (2.45%) | L2 | Rejected-AOC Reject |
| 3 | Not Admitted-Technical VPO CHANELI YAMUNANAGAR 135001 | YAMUNA NAGAR | YAMUNA NAGAR | HARYANA | 135001 | - | - | Not Admitted-Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | BABA DEEP SINGH BUILDER AND DESILTER PVT LTD L1 | M/s. Sainyam Goel L2 |
|---|---|---|---|---|---|
| 1.00 | Desilting of 300mm dia Master sewer lines has been prepared with taking Appx discharge of 300mm i/d pipe with running full capacity at a velocity of 0.75 Mtr/Sec (As per sewerage design statement) = 5.70 Cusecs. (By converting the discharge in MLD = 13.94 MLD) Asuming 75 to 80% sewer line is silted and 25 to 20% sewage water is running = 3.48 MLD (2417 LPM) which needs to be diversion during the desiling of master sewer line.
Required HP of pump = 2417 /60 = 40.28 LPS = 40.28 x 10 / 75 = 5.37 HP = 5.37 /0.65 = 8.26 HP Say 10 HP, So 10 HP sewage submerssible pump alngwith 10 Mtr. head is required at site | 6,845 | Metre | 450 ₹30,80,250 Lowest | 500 ₹34,22,500 |
| 2.00 | Desilting of 400mm dia Master sewer lines has been prepared with taking Appx discharge of 400mm i/d pipe with running full capacity at a velocity of 0.75 Mtr/Sec (As per sewerage design statement) = 5.70 Cusecs. (By converting the discharge in MLD = 13.94 MLD) Assuming 75 to 80% sewer line is silted and 25 to 20% sewage water is running = 3.48 MLD (2417 LPM) which needs to be diversion during the desiling of master sewer line.
Required HP of pump = 2417 /60 = 40.28 LPS = 40.28 x 10 / 75 = 5.37 HP = 5.37 /0.65 = 8.26 HP Say 10 HP, So 10 HP sewage submerssible pump alngwith 10 Mtr. head is required at site | 2,180 | Metre | 605 ₹13,18,900 | 600 ₹13,08,000 Lowest |
| 3.00 | Desilting of 450mm dia Master sewer lines has been prepared with taking Appx discharge of 450mm i/d pipe with running full capacity at a velocity of 0.75 Mtr/Sec (As per sewerage design statement) = 5.70 Cusecs. (By converting the discharge in MLD = 13.94 MLD) Assuming 75 to 80% sewer line is silted and 25 to 20% sewage water is running = 3.48 MLD (2417 LPM) which needs to be diversion during the desiling of master sewer line.
Required HP of pump = 2417 /60 = 40.28 LPS = 40.28 x 10 / 75 = 5.37 HP= 5.37 /0.65 = 8.26 HP Say 10 HP, So 10 HP sewage submerssible pump alngwith 10 Mtr. head is required at site | 1,390 | Metre | 605 ₹8,40,950 | 600 ₹8,34,000 Lowest |
| 4.00 | Keeping in view the above desilting details the following analysis for desilting of 600mm dia Master sewer lines has been prepared with taking Appx discharge of 600mm i/d pipe with running full capacity at a velocity of 0.87 Mtr/Sec (As per sewerage design statement) = 7.87 Cusecs. (By converting the discharge in MLD = 19.25 MLD) Assuming 75 to 80% sewer line is silted and 25 to 20% sewage water is running = 4.81 MLD (3340 LPM) which needs to be diversion during the desiling of master sewer line. Required HP of pump = 3340 /60 = 55.66 LPS = 55.66 x 10 / 75 = 7.42 HP = 7.42 /0.65 = 11.42 HP Say 15 HP, So 15 HP sewage submerssible pump alngwith 10 Mtr. head is required at site | 5,110 | Metre | 900 ₹45,99,000 Lowest | 900 ₹45,99,000 Lowest |
| 5.00 | ..Desilting of 800mm dia Master sewer lines has been prepared and the Appx discharge of 800mm i/d pipe with running full capacity at a velocity of 1.05 Mtr/Sec (As per sewerage design statement) = 14.25 Cusecs. (By converting the discharge in MLD = 34.86 MLD) Assuming 75 to 80% sewer line is silted and 20 to 25% sewage water is running = 8.71 MLD (6050 LPM) which needs to be diversion during the desiling of master sewer line.
Required HP of pump = 6050 /60 = 100.83 LPS= 100.83 x 10 / 75 = 13.44 HP = 13.44 /0.65 = 20.68 HP Say 20 HP, So 20 HP sewage submerssible pump alngwith 10 Mtr. head is required at site... | 3,180 | Metre | 1,500 ₹47,70,000 | 1,400 ₹44,52,000 Lowest |
| 6.00 | ..Keeping in view the above desilting details the following analysis for desilting of 900mm dia Master sewer lines has been prepared and the Appx discharge with running full capacity at a velocity of 1.02 Mtr/Sec (As per sewerage design statement) = 23.47 Cusecs. (By converting the discharge in MLD = 57.42 MLD) Assuming 75 to 80% sewer line is silted and 20 to 25% sewage water is running = 14.36 MLD (9972 LPM) which needs to be diversion during the desiling of master sewer line. Required HP of pump = 9972 /60 = 166.20 LPS....= 166.20 x 12 / 75 = 26.59 HP = 26.59 / 0.65 = 40.91 HP Say 50 HP, So 50 HP sewage submerssible pump alngwith 12 Mtr. head is required at site | 800 | Metre | 1,500 ₹12,00,000 | 1,400 ₹11,20,000 Lowest |
| 7.00 | CCTV Survey by Lazer Profiler | 20,195 | Metre | 70 ₹14,13,650 Lowest | 90 ₹18,17,550 |
| 8.00 | Desilting of 550mm dia Master sewer lines has been prepared with taking Appx discharge of 550mm i/d pipe with running full capacity at a velocity of 0.75 Mtr/Sec (As per sewerage design statement) = 5.70 Cusecs. (By converting the discharge in MLD = 13.94 MLD) Assuming 75 to 80% sewer line is silted and 25 to 20% sewage water is running = 3.48 MLD (2417 LPM) which needs to be diversion during the desiling of master sewer line. Required HP of pump = 2417 /60 = 40.28 LPS = 40.28 x 10 / 75 = 5.37 HP = 5.37 /0.65 = 8.26 HP Say 10 HP, So 10 HP sewage submerssible pump alngwith 10 Mtr. head is required at site | 690 | Metre | 750 ₹5,17,500 Lowest | 900 ₹6,21,000 |
Tender Value
₹2.4 Cr
EMD Value
₹4.9 L
Closing Date
15 Sept 2025, 3:00 pmClosed
BHANU PARKASH SHARMA
Jind PHED No. 1
Cleaning of various size sewer lines to be cleaning through Super Sucker De-silting Machine
2025_HRY_469782_1
2025BF98FD1B D491 4AB4 8EAD 02C1A422EE64568PUH
Open Tender
Civil Works
Works
200 days
Jind
4 documents required · 4 mandatory
₹15,000
₹4.9 L
Yes
10 Nov 2025
3 Sept 2025
15 Sept 2025
3 Sept 2025
15 Sept 2025
3 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .