Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.1 LAccepted-AOC | 1 | Accepted-AOC Lowest Bidder | |
| 2 | 2₹7.3 L+₹16,226 (2.29%)Rejected-AOC | 2 | Rejected-AOC Highest Bidder | |
| 3 | 3₹8.0 L+₹92,943 (13.1%)Rejected-AOC D SHALA DISTT KANGRA HP | 3 | Rejected-AOC Highest Bidder | |
| 4 | 4₹8.6 L+₹1.5 L (21.3%)Rejected-AOC | 4 | Rejected-AOC Highest Bidder | |
| 5 | 5₹8.9 L+₹1.8 L (24.8%)Rejected-AOC | 5 | Rejected-AOC Highest Bidder |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
17 Sept 2021, 12:00 pmClosed
District Project Officer, IDP
District Project Officer, Integrated Development Project, Chamba at Chowari
C/o Cement Concrete Check Dam at Jandrah Nallah under Jal Bhandaran Scheme
2021_CPD1_51893_1
DPO/IDP/CHAMBA/ JOB NO.132
Open Tender
Civil Works - Water Works
Item Rate
90 days
Tunuhatti (Jandrah)
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
DPO, IDP
₹25,000
16 Dec 2021
3 Sept 2021
17 Sept 2021
3 Sept 2021
17 Sept 2021
4 Sept 2021
3 Sept 2021 - 15 Sept 2021
Amount
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m. as directed by engineer-in-charge. All kind of soil
Excavation work by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bootoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m Ordinary rock
Providing and Laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level: 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size)
Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.
Providing and Laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level: 1:2:4 (1 Cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)
Steel reinforcement for RCC work including straightening, cuttting, bending, placing in position and binding all complete upto plinth level. Same qty. as per Item No. 4 = 11.25 @ 65/-=731 Kg` Mild steel and Medicumk Tensile steel bars
Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
R.K ENTERPRISES
kuldeep kumar
Sh. Manoj Kumar Sharma
Tarviz Singh Kudial, Govt. Contractor
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .