Loading…
Loading…
Tender Value
₹3.9 L
EMD Value
₹7,780
Closing Date
9 Jul 2026, 6:00 pmDue tomorrow
Executive Engineer
PWD (RandB) Division Udhampur
Gatyal Morh to Dhanoo via Seen Brahmna (Under Permanent Restoration)
2026_PWDJK_314451_4
e-NIT 60 of 2026-27 dated 03.07.2026
Open Tender
Civil Works
30 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RandB Division Udhampur
₹7,780
3 Jul 2026
3 Jul 2026
10 Jul 2026
4 Jul 2026
9 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres All kind of soil | 33.3 | cum | 256.85 | ₹8,553.11 |
| 2 | Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering -- All work upto plinth level 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) | 5.15 | cum | 4,826.5 | ₹24,856.48 |
| 3 | Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering -- All work upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone agg. 20 mm nominal size) crushed. Incl. 20% Plum | 51 | cum | 4,774.46 | ₹2,43,497.46 |
| 4Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 4.1 | Foundations, footings, bases of columns etc. for mass concrete | 74 | sqm | 286.35 | ₹21,189.9 |
| 5 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone agg.) finished with a floating coat of neat cement including cement slurry, but excl. the cost of nosing of steps etc. 50 mm thick with 20 mm nominal size stone aggregate. | 17.44 | sqm | 562.15 | ₹9,803.9 |
| 6 | Dumping Stones including cost of stones in horizontal or level. | 12 | cum | 937.9 | ₹11,254.8 |
| 7Carriage of material by M.T incl loading/unloading & stacking complete | |||||
| 7.1 | Sand av lead of 50 km | 27.4 | cum | 741.14 | ₹20,307.24 |
| 7.2 | Stone agg below 40mm nominal size av lead 20 km | 98.81 | cum | 409.94 | ₹40,506.17 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_1018098.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid