| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹8.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹9.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹9.5 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹9.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹9.6 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | LOTUS CIVIL ENGINEERING L2 | C SHANMUGAM L3 | K TECH FOUNDATION L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling the Existing Reinforced cement Concrete including cost and conveyance of all materials and labour charges etc complete. | 11.25 | M3 | 60,750 ₹71,685 | 61,875 ₹73,012.5 | 30,937.5 ₹36,506.25 Lowest |
| 2.00 | Dismantling the Existing Plain cement Concrete including cost and conveyance of all materials and labour charges etc complete. | 20 | M3 | 10,400 ₹12,272 | 10,600 ₹12,508 | 9,000 ₹10,620 Lowest |
| 3.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 55 | M3 | 10,450 ₹12,331 | 11,000 ₹12,980 | 8,250 ₹9,735 Lowest |
| 4.00 | Desilting of sand and silt under water (SS20 B ) Earth work excavation and depositing on bank with initial lead and lift etc complete PWD SOR 2025-26 . | 30 | M3 | 5,400 ₹6,372 Lowest | 5,700 ₹6,726 | 8,100 ₹9,558 |
| 5.00 | Supplying and filling in foundation and basement with filling crusher stone dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 13.75 | M3 | 4,193.75 ₹4,948.63 | 4,262.5 ₹5,029.75 | 3,575 ₹4,218.5 Lowest |
| 6.00 | Plain cement concrete 1:4:8 mix using 40 mm HBG ISS metal including cost and conveyance of all materials and including all labour cahrges etc comlete | 13.75 | M3 | 73,562.5 ₹86,803.75 | 74,250 ₹87,615 | 71,500 ₹84,370 Lowest |
| 7.00 | Plain cement concrete 1:2:4mix using 20 mm HBG ISS metal including cost and conveyance of all materials and including all labour cahrges etc comlete | 30 | M3 | 2,04,000 ₹2,40,720 | 2,05,500 ₹2,42,490 | 1,65,000 ₹1,94,700 Lowest |
| 8.00 | Centering for soffits of CC slabs of plane surface like lintels, beams, etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm x and BG 10 stiffened with MS angles of size 25mm x 25mm x 3mm laid over silver oak joists of size 10cm x 6.5 cm spaced at about 90 cm c/c and supported by consurina props of 10 cm to 13cm dia spaced of 75cm c/c complying with standard specifications and as directed by the departmentsl officers etc., complete | 237.5 | M2 | 1,14,000 ₹1,34,520 Lowest | 1,16,375 ₹1,37,322.5 | 1,49,625 ₹1,76,557.5 |
| 9.00 | Plastering in CM 1;5-12mm thick including cost and conveyance of all materials and including all labour charges etc complete | 75 | M2 | 28,500 ₹33,630 Lowest | 29,250 ₹34,515 | 46,500 ₹54,870 |
| 10.00 | Supply and Fixing of Kadapha Slab including cost and conveyance of all materials and including all labour charges etc complete | 85.11 | M2 | 63,832.5 ₹75,322.35 | 67,236.9 ₹79,339.54 | 17,022 ₹20,085.96 Lowest |
Tender Value
₹10.5 L
EMD Value
₹10,500
Closing Date
30 Jul 2026, 3:00 pmClosed
The Commissioner Tambaram Corporation
Muthurangan Street West Tambaram
Construction of SWD at Krishna Avenue 1st street, krishna avenue 3rd street,at ward no 66, Zone 5 in Tambaram City Municipal Corporation.
2026_DMA_685018_6
006/2026/E2/Z-5
Open Tender
Civil Works
Works
Zone 5
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,500
30 Jul 2026
10 Jul 2026
30 Jul 2026
10 Jul 2026
30 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Dismantling the Existing Reinforced cement Concrete including cost and conveyance of all materials and labour charges etc complete. | 11.25 | M3 | - | - | 18% |
| 2 | Dismantling the Existing Plain cement Concrete including cost and conveyance of all materials and labour charges etc complete. | 20 | M3 | - | - | 18% |
| 3 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 55 | M3 | - | - | 18% |
| 4 | Desilting of sand and silt under water (SS20 B ) Earth work excavation and depositing on bank with initial lead and lift etc complete PWD SOR 2025-26 . | 30 | M3 | - | - | 18% |
| 5 | Supplying and filling in foundation and basement with filling crusher stone dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 13.75 | M3 | - | - | 18% |
| 6 | Plain cement concrete 1:4:8 mix using 40 mm HBG ISS metal including cost and conveyance of all materials and including all labour cahrges etc comlete | 13.75 | M3 | - | - | 18% |
| 7 | Plain cement concrete 1:2:4mix using 20 mm HBG ISS metal including cost and conveyance of all materials and including all labour cahrges etc comlete | 30 | M3 | - | - | 18% |
| 8 | Centering for soffits of CC slabs of plane surface like lintels, beams, etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm x and BG 10 stiffened with MS angles of size 25mm x 25mm x 3mm laid over silver oak joists of size 10cm x 6.5 cm spaced at about 90 cm c/c and supported by consurina props of 10 cm to 13cm dia spaced of 75cm c/c complying with standard specifications and as directed by the departmentsl officers etc., complete | 237.5 | M2 | - | - | 18% |
| 9 | Plastering in CM 1;5-12mm thick including cost and conveyance of all materials and including all labour charges etc complete | 75 | M2 | - | - | 18% |
| 10 | Supply and Fixing of Kadapha Slab including cost and conveyance of all materials and including all labour charges etc complete | 85.11 | M2 | - | - | 18% |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_823509.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].