Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹39.4 LAdmitted-Finance | -16.00% | ₹39.4 L | L1 | Admitted-Finance |
| 2 | L2₹39.9 LAdmitted-Finance | -15.00% | ₹39.9 L | L2 | Admitted-Finance |
| 3 | L3₹46.4 LAdmitted-Finance | -1.11% | ₹46.4 L | L3 | Admitted-Finance |
Updated dates
Tender Value
₹46.9 L
EMD Value
₹93,800
Closing Date
29 May 2026, 1:00 pmClosed
Project Officer CAD Samba, H.Q. Jammu
Project Officer CAD Samba, H.Q. Jammu
Construction of Field channels at Thagan/ Somfari/ Dheeran/ Baryalta/ Nallan Badi to Bantalab Khul
2026_APD_308834_2
eNIT 15 of 2026-27, dated 27.04.2026
Open Tender
Civil Works - Others
Bari and Dheeran Baryalta and Pyt Bari and Baryalt
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Project Officer CAD Samba, H.Q. Jammu
₹93,800
5 Jun 2026
12 May 2026
30 May 2026
12 May 2026
29 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth 1 mtr from cutting edge. | 683.72 | m3 | 479.3 | ₹3,27,707 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 147.93 | m3 | 4,826.5 | ₹7,13,984.15 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 30 % 225 mm boulders | 264.13 | m3 | 5,733.6 | ₹15,14,415.77 |
| 4 | Dumping/ Hand Packing of stones (30%) in plum including the cost of Stone boulder (nallah) nominal size 225 mm in Horizontal on level | 113.2 | m3 | 937.9 | ₹1,06,170.28 |
| 5 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.( 40mm thick with 20 mm nominal size stone aggregate.) | 814.72 | m2 | 510.25 | ₹4,15,710.88 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns. | 3,430.4 | m2 | 286.35 | ₹9,82,295.04 |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 120.06 | m3 | 218.4 | ₹26,221.1 |
| 8 | Carriage of cement, sand, bajri,and stone inncluding mechnical and head load | 1 | m3 | 6,03,495.78 | ₹6,03,495.78 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.45 MB
retender15.pdf
Other Document • 0.49 MB
BOQ_1002732.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid