Loading…
Loading…
Tender Value
Refer Docs
Closing Date
14 Sept 2026, 10:30 am3d left
Single Packet
Normal Tender
No
Not Applicable
Itemwise/Consigneewise
Lowest to Highest
TPI Agency
Not Applicable
90 days
Expenditure
General
P6
3 conditions · 3 needing a document upload
Supply should be as per the Tender Description and Specifications. Para-wise compliance to the attached specifications must be submitted along with the bid/offer, failing which the firms offer shall be summarily rejected.
Railway reserves the right to place bulk order on OEM or their authorized dealers. Dealers participating on behalf of OEM should upload tender specific authorization from OEM. Offers from sub dealers will not be considered.
Railway reserves the right to place bulk order on firms which have executed supply of tendered/similar item to any Railway/PSU/Govt. agencies for which firm should upload proof of execution. It is to be noted that Purchase Order copies cannot be considered as proof of execution. In case authorized dealer participates in the tender, the past performance of their principal firm i.e, OEM will be considered. Here similar is defined as Hydraulic Puller of 30 Ton Capacity or higher.
38 conditions · 2 needing a document upload
Have you read and accepted tender conditions?
Have you furnished the statement of deviations [preferably nil]?
Have you attached any performance statements separately?
Are you coming under MSE status given as per guidelines issued by Railway Board for purchase preference vide letter No. 2010-RS [G] -363-1 Dt. 05.07.2012 or latest.
If yes, have you attached valid documents towards being MSE?
Have you submitted authenticated copy of the document authorizing the signatory to submit offer and commit on behalf of tenderers. Other conditions will be as per attached tender document.
Have you quoted delivery period correctly and precisely?
Have you quoted Mode of dispatch on FOR destination basis for free delivery at destination with rate structure clearly indicating the basic rate, GST and freight etc, up to destination [consignees premises].
Additional ITC benefits or set offs after the date of tenderers offer- The tenderers further agree to pass on such additional duties and set off as may become available in future in respect of all the inputs used for the manufacture of the final product on the date of the supply under GST scheme by way of reduction in price and advise the purchaser accordingly.
Have you quoted the discount if any in the specified column only in IREPS?
Have you furnished Bank account details such as Name of the Bank and address, account no., MICR, IFSC code and type of account to facilitate EFT payment?
The tenderers should not merely quote Entry Tax or Toll Tax etc. extra, as the rates quoted without specific rates will not be considered, and if the same becomes applicable, the same have to be borne by the suppliers. Therefore, if the tenderers desire to claim such charges, they should quote specific rate of tax or duty.
The bidder confirms that Rates and other financial terms quoted in relevant columns of financial bid will only be ruling terms for acceptance, and such terms quoted anywhere else should be ignored. [Denial of this condition not recommended]
Firm to indicate make-model-brand offered if any.
1. The offers shall be evaluated based on the GST rate as quoted by each bidder and same will be used for determining the inter se ranking. While submitting offer, it shall be the responsibility of the bidder to ensure that they quote correct GST rate and HSN Number. 2. Purchaser shall not be responsible for any misclassification of HSN number or incorrect GST rate if quoted by the bidder. 3. Whenever the successful bidder invoices the goods at GST rate or HSN number which is different from that incorporated in the purchase order; payment shall be made as per GST rate which is lower of the GST rate incorporated in the purchase order or billed. 4. Vendor is informed that she/he would be required to adjust her/his basic price to the extent required by higher tax billed as per invoice to match the GST condition.
MAKE IN INDIA POLICY : Item is reserved for purchase from MII policy compliant firms. All terms and conditions will be as per clause 29.0 of attached tender booklet.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
1 location across Karnataka · 2 Numbers total
Supply, Installation, commissioning, testing of hydraulic Puller for replacement of Aclathan ring/Elastic ring of WAG-9 locomotives
65265008~SWR
65265008
Open - Indigenous
Goods
Karnataka
₹0
Exempted
19 Aug 2026
19 Aug 2026
1 item · 2 Numbers total
Supply, Installation, commissioning, testing of hydraulic Puller for replacement of Aclathan ri ng/Elastic ring of WAG-9 locomotives as per specification enclosed at Annexure I. [ Warranty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/DSL/KJM, SWR | Karnataka | 2.00 Numbers |
| Total | 2 Numbers | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5877669.pdf
ATTACHMENT
5788567.pdf
ATTACHMENT
5788557.pdf
ATTACHMENT
5788544.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .