Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹39.0 LAdmitted-Finance ITWA | -6.99% | ₹39.0 L | L1 | Admitted-Finance |
| 2 | L2₹41.3 LAdmitted-Finance | -1.37% | ₹41.3 L | L2 | Admitted-Finance |
| 3 | L3₹41.5 LAdmitted-Finance | -0.99% | ₹41.5 L | L3 | Admitted-Finance |
| 4 | L4₹41.7 LAdmitted-Finance | -0.50% | ₹41.7 L | L4 | Admitted-Finance |
Tender Value
₹41.4 L
EMD Value
₹4.1 L
Closing Date
13 Apr 2026, 2:00 pmClosed
E.O.
N.P. Ekdil
Contraction R.C.C. Contraction R.C.C. Coverd Nala Side Patri Lalman Baba Mandir to Amar Singh Plot Moh Chhoti Fufai
2026_DOLBU_1129348_1
1366/EN/NPE/2025-26 /17
Open Tender
Civil Works
30 days
N.P. Ekdil
Contraction R.C.C. Coverd Nala Side Patri Lalman Baba Mandir to Amar Singh Plot Moh Chhoti Fufai
2 documents required · 2 mandatory
₹5,000
Yes
E.O.
₹4.1 L
Yes
N.P. Ekdil
28 Apr 2026
23 Mar 2026
13 Apr 2026
23 Mar 2026
13 Apr 2026
23 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1demolishing brick work manually /by mechanical means including stacking of serviceable material and disposal all complete as per dar no15.7.4 | |||||
| 2Earth work in excavation in foundation in ordinary soil (loam, clay or sand )including lift up to 1.5 meter and lead up to 30 meter all as per sor 251 | |||||
| 3Earth work in filling cartage up to 8.0 km excluding royality | |||||
| 4Cement concrete in 1:4:8 cement and coarse sand with approved stone ballast all as per sor no 281 | |||||
| 5Providing Cast of dewatring and making banda for diversion of water and dewatring all complete | |||||
| 65.3 Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).as per dsr 5.3 | |||||
| 7supply and fixing of sign board with granite stone | |||||
| 8dispossal of malwa cartage up to 8.0 km all as per sor | |||||
| 9Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars as per dsr 5.22.1 | |||||
| 10Providing and laying factory made 80 mm thick Interlocking cement concrete tiles (30mpa) including 25mm thick compacted bed of fine sand compacting ------- - - - -- including the cost of material, labour T&P etc. required for proper copletion of work as directed by Engineer-in-charge.All complete as per mord 1500 6.7 2 | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_2106632.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid