| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.1 CrAccepted-Finance | ₹3.1 Cr | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹3.3 Cr+₹22.9 L (7.50%)Rejected-Finance | ₹3.3 Cr+₹22.9 L (7.50%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹3.7 Cr+₹64.2 L (21.0%)Rejected-Finance M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹3.7 Cr+₹64.2 L (21.0%) | L-3 | Rejected-Finance L-3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technical Bid not Qualified |
| 5 | Rejected-Technical KUKUHAWA POST GAURABADSHAHPUR JANPAD JAUNPUR | - | - | Rejected-Technical Technical Bid not Qualified |
| Sl No | Description | Qty | Unit | M/S BADRI SINGH L3 | M/S RADHEY MOHAN DUBEY CONSTRUCTION L2 | M/S RAMPYARE SINGH L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in removal of overburden in all type of soil, soft rock and hard rock etc. including all cost of material labour charges T&P etc.required for proper completion of work. | 1,606.7 | M3 | 80 ₹1,28,536.25 Lowest | 140 ₹2,24,938.44 | 110 ₹1,76,737.34 |
| 2.00 | Earth work in excavation of foundation in all types of soil including hard soil mixed with boulder, soft and disintegrated rock including all leads, lifts, labour charges its proper disposal, T&P etc. required for proper completion of work. | 4,914 | M3 | 100 ₹4,91,400 | 76 ₹3,73,464 | 75 ₹3,68,550 Lowest |
| 3.00 | C.C. 1:3:6 (M-10) in foundation with cement, coarse sand, FM not less than 2.0, hard stone ballast 20 to 40 mm. size including all cost of material, labour, T&P etc. complete required for proper completion of work. | 223.2 | M3 | 4,100 ₹9,15,120 | 3,800 ₹8,48,160 Lowest | 3,800 ₹8,48,160 Lowest |
| 4.00 | providing and laying C.C. (M-15) in anchor for geocell with cement, coarse sand ,FM not less than 2.0 and crushed hard stone grit 4.75 to 20 mm size including cost of all material, lead lift, T&P etc. but excluding centering & shuttering required for proper completion of work. | 18 | M3 | 6,000 ₹1,08,000 Lowest | 6,000 ₹1,08,000 Lowest | 6,000 ₹1,08,000 Lowest |
| 5.00 | Laying C.R. stone masonry in 1:3 with cement, coarse sand, FM not less than 2.0 and stone boulder including cost of all material, labour and T&P etc. required for proper completion of work. | 7,461 | M3 | 4,100 ₹3,05,90,100 | 3,600 ₹2,68,59,600 | 3,300 ₹2,46,21,300 Lowest |
| 6.00 | Providing and fixing 75 mm Ø P.V.C. Pipe in weep hole 1.5 m c/c along the canal . Including cutting, placing, all cost of labour charges T&P etc. required for proper completion of work. | 1,929.6 | R.M. | 100 ₹1,92,960 | 97 ₹1,87,171.2 | 90 ₹1,73,664 Lowest |
| 7.00 | Centering & shuttering for Enclose filter. including cost of all materials, labour, T&P etc. required for proper completion of work. | 6,609.6 | M2 | 200 ₹13,21,920 | 59 ₹3,89,966.4 | 50 ₹3,30,480 Lowest |
| 8.00 | Stuck deep cement pointing in 1:2 C.M.mortar over R.R stone masonary with all labour material T&P etc. required for proper completion of work . per m2 | 1,965.77 | M2 | 125 ₹2,45,721.25 | 124 ₹2,43,755.48 | 105 ₹2,06,405.85 Lowest |
| 9.00 | Providing and laying coarse sand in filter .including cost of all material labours and T&P etc.required for proper completion of work. | 224.07 | M3 | 1,600 ₹3,58,512 Lowest | 2,500 ₹5,60,175 | 2,500 ₹5,60,175 |
| 10.00 | Providing and laying graded filter Stone grit 4.75 to 20 mm. including cost of all material labour and T&P etc. required for proper completion of work. | 224.07 | M3 | 2,200 ₹4,92,954 Lowest | 2,900 ₹6,49,803 | 2,600 ₹5,82,582 |
Tender Value
Refer Docs
EMD Value
₹7.5 L
Closing Date
6 Aug 2026, 2:00 pmClosed
S.E. B.S.C.C.C.-2, Mzp
Office of Superintending Engineer, Bansagar Canal Construction Circle-2 Mirzapur
Bank strengthening work on both sides of Meja Jirgo Link Canal between Km. 42.940 to 43.140.
2026_UPIDC_1172517_1
04/SE/2026-27
Open Tender
Civil Works
Item Rate
330 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹7.5 L
20 Sept 2026
27 Jul 2026
6 Aug 2026
28 Jul 2026
6 Aug 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in removal of overburden in all type of soil, soft rock and hard rock etc. including all cost of material labour charges T&P etc.required for proper completion of work. | - | M3 | - | - |
| 2 | Earth work in excavation of foundation in all types of soil including hard soil mixed with boulder, soft and disintegrated rock including all leads, lifts, labour charges its proper disposal, T&P etc. required for proper completion of work. | - | M3 | - | - |
| 3 | C.C. 1:3:6 (M-10) in foundation with cement, coarse sand, FM not less than 2.0, hard stone ballast 20 to 40 mm. size including all cost of material, labour, T&P etc. complete required for proper completion of work. | 1 | M3 | - | - |
| 4 | providing and laying C.C. (M-15) in anchor for geocell with cement, coarse sand ,FM not less than 2.0 and crushed hard stone grit 4.75 to 20 mm size including cost of all material, lead lift, T&P etc. but excluding centering & shuttering required for proper completion of work. | - | M3 | - | - |
| 5 | Laying C.R. stone masonry in 1:3 with cement, coarse sand, FM not less than 2.0 and stone boulder including cost of all material, labour and T&P etc. required for proper completion of work. | - | M3 | - | - |
| 6 | Providing and fixing 75 mm Ø P.V.C. Pipe in weep hole 1.5 m c/c along the canal . Including cutting, placing, all cost of labour charges T&P etc. required for proper completion of work. | 1 | R.M. | - | - |
| 7 | Centering & shuttering for Enclose filter. including cost of all materials, labour, T&P etc. required for proper completion of work. | - | M2 | - | - |
| 8 | Stuck deep cement pointing in 1:2 C.M.mortar over R.R stone masonary with all labour material T&P etc. required for proper completion of work . per m2 | 1 | M2 | - | - |
| 9 | Providing and laying coarse sand in filter .including cost of all material labours and T&P etc.required for proper completion of work. | 1 | M3 | - | - |
| 10 | Providing and laying graded filter Stone grit 4.75 to 20 mm. including cost of all material labour and T&P etc. required for proper completion of work. | 1 | M3 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
Tender_Document_Lot_1.pdf
Tender Documents • 5.00 MB
BOQ_2201890.xls
BOQ • 5.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .