Tender Value
₹7.8 L
EMD Value
₹8,000
Closing Date
21 Jul 2022, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri DT - AGAMT 2021-22 - Kaveripattinam Block - Construction of link Drainage with Vertical Filter and Providing Barbed Wire Fencing to the Murunga Nursery and Block Nursery - 4 works - at Sundekuppam Panchayat - Package No - TN-04-KRI-86
2022_RDTN_238814_1
RocNo_42_2022_R10_ 20_06_2022
Open Tender
Civil Works - Others
Item Rate
180 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,000
DRDA Krishnagiri
2 Aug 2022
2 Jul 2022
21 Jul 2022
2 Jul 2022
21 Jul 2022
2 Jul 2022
18 Jul 2022
Amount
1.Construction of link Drainage with Vertical Filter (30m)at Kambalikan theru Kovil Near H/o.Sundekuppam - Rs.2.50/- Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all cost
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers
Construction of Vertical Filter
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Soak pit Chamber
2nd Depth
3rd Depth
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Supply and Filling of Rough stone from Approved Qurry including all labour charge
Supply and Filling of 40 mm Metal from Approved Qurry including Cost and Conveyance
Supply and Fixing of RCC 1.00 Dia Ring thickness of 0.05m Including cost and conveyance
RCC Ring
Cover Slab
Supply and Fixing of 0.60x0.60m Vertical Filter Cover slab
Supply and Filling of 20 mm Metal from Approved Qurry including Cost and Conveyance
Supply and Filling of Char Coal including all labour charges
Supply and filling of 20 mm Brick jelly from approved qurry including all labour charges
supplying and fixing of 110mm dia 6ksc pvc pipe including all cost and conveyance etc., all complete
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and levelling to required profile
Provision for Name Board
2.Construction of link Drainage with Vertical Filter(5m) at Chettimaramapatti Govt High School Near H/o.Sundekuppam - Rs.1.42419/- Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all cost
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers
Construction of Vertical Filter
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Soak pit Chamber
2nd Depth
3rd Depth
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Supply and Filling of Rough stone from Approved Qurry including all labour charge
Supply and Filling of 40 mm Metal from Approved Qurry including Cost and Conveyance
Supply and Fixing of RCC 1.00 Dia Ring thickness of 0.05m Including cost and conveyance
RCC Ring
Cover Slab
Supply and Fixing of 0.60x0.60m Vertical Filter Cover Slab
Supply and Filling of 20 mm Metal from Approved Qurry including Cost and Conveyance
Supply and Filling of Char Coal including all labour charges
Supply and filling of 20 mm Brick jelly from approved qurry including all labour charges
supplying and fixing of 110mm dia 6ksc pvc pipe including all cost and conveyance etc., all complete
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and levelling to required profile
Provision for Name Board
3.Providing Barbed Wire Fencing to the Murunga Nursery (160m) at Nattan Kottai H/o.Sundekuppam - Rs.0.78 /- Lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Cement concrete 1 : 2 : 4 mix using 20mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all cost
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Supply and fixing of Barbed wire including all cost and conveyance etc., all complete
Provision for Name Board
4.Providing Barbed Wire Fencing to the Block Nursery (658m) at Nattan Kottai H/o.Sundekuppam - Rs.3.10/- Lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Cement concrete 1 : 2 : 4 mix using 20mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all cost
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Supply and fixing of Barbed wire including all cost and conveyance etc., all complete
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SPS CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .