| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC STATION ROAD P O UKHRA DIST BURDWAN PIN 713363 W B | UKHRA | BURDWAN | WEST BENGAL | 713363 | ₹3.6 L | L1 | Accepted-AOC TC recommendation |
| 2 | Rejected-Technical STATION ROAD UKHRA BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | - | - | Rejected-Technical TC recommendation |
| 3 | Rejected-Technical BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | - | - | Rejected-Technical TC recommendation |
| Sl No | Description | Qty | Unit | ANNAPURNA ENTERPRISE L1 |
|---|---|---|---|---|
| 1.00Complete rewinding and repairing of 100 KVA , 11 KV/440V transformer | ||||
| 2.00 | Cost of TPC coated copper wire | 120 | KGs | 600 ₹72,000 |
| 3.00 | Cost of insulating materials | 1 | ls | 9,500 ₹9,500 |
| 4.00 | Cost of cork sheet, rupoton rod, DA, Oxygen etc. | 1 | ls | 6,100 ₹6,100 |
| 5.00 | Cost of brass stud with insulator brass | 7 | set | 1,600 ₹11,200 |
| 6.00 | Cost of decarbonizing of tank, core, cleaning etc. | 1 | ls | 3,300 ₹3,300 |
| 7.00 | Cost of varnishing, thinner etc. | 1 | ls | 4,000 ₹4,000 |
| 8.00 | Repairing of tank and damage cooling pipe | 1 | ls | 3,800 ₹3,800 |
| 9.00 | Labour charges for complete rewinding assembling, fitting etc. | 1 | ls | 9,900 ₹9,900 |
| 10.00 | Transportation charges with loading and unloading to and fro | 1 | ls | 3,600 ₹3,600 |
Tender Value
₹3.5 L
EMD Value
₹4,500
Closing Date
6 Sept 2025, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Complete rewinding and repairing of 100 KVA , 11 KV/440V transformer along with installation at 11 KV VK unit Substation and making heat shrink kit joint at 11 KV VK Unit substation of Khandra Colliery under Bankola Area
2025_ECL_342411_1
ECL/GM/BA/E TENDER/25-26/ENM/88 Dt 25.08.2025
Open Tender
Electrical and Maintenance Works
30 days
KHANDRA COLLIERY
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,500
28 Apr 2026
25 Aug 2025
8 Sept 2025
25 Aug 2025
6 Sept 2025
25 Aug 2025
25 Aug 2025 - 1 Sept 2025
Amount
Complete rewinding and repairing of 100 KVA , 11 KV/440V transformer
Cost of TPC coated copper wire
Cost of insulating materials
Cost of cork sheet, rupoton rod, DA, Oxygen etc.
Cost of brass stud with insulator brass
Cost of decarbonizing of tank, core, cleaning etc.
Cost of varnishing, thinner etc.
Repairing of tank and damage cooling pipe
Labour charges for complete rewinding assembling, fitting etc.
Transportation charges with loading and unloading to and fro
Installation, testing and commissioning etc.
Laying and erection of 70/95Sqmm XLPE Cable
Supply and crimping of copper lugs
(B) 11KV Heat shrink kit joint at V.K. Unit and NKJ Unit Sub station -Making terminal kit joint with 3m make 11KV grade 3 core heat shrink out door type kit joint for 50-95Saqmm XLPE cable
Making straight through kit joint with 11KVX3 core 50-95Sqnmm 3m make heat shrink straight through kit joint
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Tendernotice_2.pdf
PDF • 0.21 MB
Tendernotice_3.pdf
PDF • 1.25 MB
BOQ_354951.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid