Loading…
Loading…
Tender Value
₹25.4 L
EMD Value
₹2.5 L
Closing Date
14 Sept 2026, 9:00 am
EO, NPP Baraut
NPP Baraut
02 - Kashba baraut mai badauli road par esthit samsan ghat me savdahgrah kaksh ka nirman kariya.
2026_DOLBU_1182309_2
369/2026-27, 22-08-2026
Open Tender
Miscellaneous Works
Percentage
180 days
Baraut
Tender fee, EMD and other documents as per the tender documents/NIT
2 documents required · 2 mandatory
₹3,000
EO, NPP Baraut
₹2.5 L
3 Sept 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation or trunch of drain in all complete / possition. | 64.8 | cum | 194.9 | ₹12,629.52 |
| - | PCC in 1:4:8 (1 Cement : 4 coarse sand (zone-ill) derived from natural sources : 8 graded stone aggregate 40 mmnominal size derived from natural sources) all complete . | 3.51 | CUM | 5,100 | ₹17,901 |
| - | dismentling of rcc work in all complete / possition | 8.36 | cum | 2,658.96 | ₹22,235.29 |
| - | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | 15.73 | CUM | 4,870.47 | ₹76,610.54 |
| - | 12 MM thick plaster on wall in 1 : 6 ( 1 cement , 6 course sand ) | 284.5 | SQM | 257.3 | ₹73,201.85 |
| - | providing and laying in possition grade of reinforced cement concrete excluding the cost of centering shuttering finishing and reinforcement - all work up to plinth level 1;1.5;3 in complete possition | 2.43 | CUM | 6,772.9 | ₹16,458.15 |
| - | reinforcement cement concrete work in coloumn above plinth level up to floor five level excluding cost of centering, shuttering finishing and reinforcement - in 1;1.5;3 in complete possition | 4.86 | CUM | 8,122 | ₹39,472.92 |
| - | reinforcement cement concrete work in coloumn above plinth level up to floor five level excluding cost of centering, shuttering finishing and reinforcement - in 1;1.5;3 in complete possition | 34.07 | CUM | 8,614.61 | ₹2,93,541.11 |
| - | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete | 284.5 | SQM | 116.84 | ₹33,240.98 |
| - | CENTERING and shuttering including strutting proping etc and removal of from work for foundation footing FOOTING base COLUMN TEC FOR MASS CONCRETE . | 56.4 | SQM | 293.62 | ₹16,560.17 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.61 MB
Tendernotice_2.pdf
PDF • 0.90 MB
BOQ_2222742.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].