| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.0 LAccepted-Finance | L-1 | Accepted-Finance Admitted | |
| 2 | L-2₹2.1 L+₹13,300 (6.66%)Accepted-Finance | L-2 | Accepted-Finance Admitted | |
| 3 | L-3₹2.5 L+₹48,550 (24.3%)Accepted-Finance | L-3 | Accepted-Finance Admitted | |
| 4 | L4₹2.7 L+₹69,800 (35.0%)Accepted-Finance | L4 | Accepted-Finance Admitted | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.0 L
EMD Value
₹3,000
Closing Date
17 Jan 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle, 220 KV S/S Natwa, Mirzapur
Cleaning of Jungle and unwanted Plants, Shrubs, Grass etc for premises of 220 KV S/S Mirzapur under ETD, Mirzapur
2022_UPTCL_669326_1
short term T. No. 40/2021-22/ETC/Mzp
Open Tender
Electrical Works
Fixed-rate
210 days
Mirzapur
as per tender specification
2 documents required · 2 mandatory
₹354
Executive Engineer, ETD, Mirzapur
₹3,000
29 Jan 2022
1 Jan 2022
18 Jan 2022
1 Jan 2022
17 Jan 2022
1 Jan 2022
180 days
Amount
Cleaning of Grass, unwanted plants,, lopping choping of trees, removal of all the un-desired growths, cleaning & uprooting of shrubs & bushes by digging with all cost of men, material and T&P etc. required for the job:
Uprooting of tiny plant by digging and taking out the complete root and then levelling of surface entire the substation area including colony permises. Disposing uprooted plant to outside the permises. labour and T&P shall be provided by Contractor including in cost..
Lopping & choping of trees including disposal of chopped branch, cleaning entire area of the substation including colony permises. labour and T&P shall be provided by Contractor including in cost.
Cleaning of jungles including up-rooting of rank vegitation grass, bushes,Kusha,Kansa,Shrubs and scrapping of grass , collection of foreign materials, papers, plastics entire the substation area including colony permises and general cleaning maintaning all time upto one year. All man and T&P arranged by contractor.
First cutting between within 1 month of LOI/Agreement date and spraying of weed medicine of 2 times in interval of 15 days and dry grass throughing in outside of permisses.
Second cutting after three month of first cutting and spraying of weed medicine of 2 times in interval of 15 days and dry grass throughing in outside of permisses.
Third cutting after three month of second cutting and spraying of weed medicine of 2 times in interval of 15 days and dry grass throughing in outside of permisses.
A.S.Contruction
Shailesh Kumar Mishra
C S ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .