| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAccepted-Finance | L1 | Accepted-Finance Accept | |
| 2 | L2₹14.2 L+₹704.75 (0.05%)Rejected-Finance | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | P.Sathish L1 | Somasundaram L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, leveling, sectioning breaking clods etc., including all incidental charges etc., complete as per standard specification . for Foundations SS 20B TNDSS NO. 23 &24 V, VI (S2) VI 9 | 265 | m3 | 246 ₹65,190 Lowest | 247 ₹65,455 |
| 2.00 | supply and filling of M sand filling approved quarry including cost and Conveyance of all materials to site and all labor charges for filling etc., Complet | 26.5 | m3 | 2,036 ₹53,954 Lowest | 2,037 ₹53,980.5 |
| 3.00 | Plain Cement concrete of mix 1:4:8 (One cement four sand and eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. TNDSS NO.28 V,VI S25 | 40 | m3 | 5,835 ₹2,33,400 Lowest | 5,836 ₹2,33,440 |
| 4.00 | Supplying & Erecting of steel centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications ..(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). TNDSS NO.86 K, 86 A a)Without strutting S.W.Drain | 630 | m2 | 459.8 ₹2,89,674 Lowest | 460 ₹2,89,800 |
| 5.00 | a)With strutting Culvert | 10.5 | m2 | 919 ₹9,649.5 Lowest | 920 ₹9,660 |
| 6.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and fourpart of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 94.5 | m3 | 7,285.5 ₹6,88,479.75 Lowest | 7,286 ₹6,88,527 |
| 7.00 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part M. sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications.(Using Vibrator) TNDSS NO: 30 V, VI (S3), VII-3. | 2.5 | m3 | 8,810 ₹22,025 Lowest | 8,811 ₹22,027.5 |
| 8.00 | Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3. | 360 | kg | 89.8 ₹32,328 Lowest | 90 ₹32,400 |
| 9.00 | Finishing the top of flooring with granothitic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete. | 115 | m3 | 176 ₹20,240 Lowest | 177 ₹20,355 |
Tender Value
₹17 L
EMD Value
₹17,000
Closing Date
12 Dec 2025, 5:00 pmClosed
Town panchayat kattumannarkoil
Town panchayat kattumannarkoil
Construction of storm water Drain and Culvert at kakkannagar in kattumannarkoil
2025_DTP_631008_1
A1/40/2024 GF 2023-24
Open Tender
Civil Works
Item Rate
180 days
Kattumannarkoil
As per tender
1 document required · 1 mandatory
₹0
₹17,000
Yes
Town panchayat kattumannarkoil
13 Mar 2026
11 Dec 2025
12 Dec 2025
11 Dec 2025
12 Dec 2025
11 Dec 2025
11 Dec 2025
Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, leveling, sectioning breaking clods etc., including all incidental charges etc., complete as per standard specification . for Foundations SS 20B TNDSS NO. 23 &24 V, VI (S2) VI 9
supply and filling of M sand filling approved quarry including cost and Conveyance of all materials to site and all labor charges for filling etc., Complet
Plain Cement concrete of mix 1:4:8 (One cement four sand and eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. TNDSS NO.28 V,VI S25
Supplying & Erecting of steel centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications ..(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). TNDSS NO.86 K, 86 A a)Without strutting S.W.Drain
a)With strutting Culvert
Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and fourpart of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part M. sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications.(Using Vibrator) TNDSS NO: 30 V, VI (S3), VII-3.
Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3.
Finishing the top of flooring with granothitic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_754756.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_754756.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .