| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.9 LAccepted-AOC | ₹80.9 L | L1 | Accepted-AOC 1st Lowest |
| 2 | L2₹82.2 LRejected-Finance 12 471 CHURCH ROAD KANPUR GWALTOLI KANPUR NAGAR UTTAR PRADESH 208001 | KANPUR NAGAR | UTTAR PRADESH | 208001 | ₹82.2 L | L2 | Rejected-Finance High Biddeer |
| 3 | L3₹91.4 LRejected-Finance 01 REWARI REWARI HARYANA 123401 | REWARI | HARYANA | 123401 | ₹91.4 L | L3 | Rejected-Finance High Bidder |
| Sl No | Description | Qty | Unit | M/S ASHISH KUMAR L3 | M/S Kamlesh Kumar Singh L1 | M/S ROHIT ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00 | Demolishing RCC Work manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Eng-in- charge. | 90.58 | Cum | 900 ₹81,522 | 100 ₹9,058 | 1,500 ₹1.4 L |
| 2.00 | Demolishing Cement concrete Work manually/By mechanical means including disposal of material within 50 meters lead as per direction of Engineer in charge. | 173.63 | Cum | 600 ₹1.0 L | 87 ₹15,105.81 | 300 ₹52,089 |
| 3.00 | Demolishing brick work in cement mortar manually/By mechanical means I/C disposal of unserviceable material within 50 meters lead as per direction of Eng-in- charge. | 559.03 | Cum | 700 ₹3.9 L | 80 ₹44,722.40 | 600 ₹3.4 L |
| 4.00 | E/W in Making Road Diversion By Power Transport with lead upto 5 Km including Excavation, loading, unloading, Royalty, dressing etc. | 1,054.13 | Cum | 110 ₹1.2 L | 40 ₹42,165.20 | 300 ₹3.2 L |
| 5.00 | E/w in cutting in foundation of box Culvert / Guide wall on channels including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per direction of engineer-in-charge. | 392.42 | Cum | 110 ₹43,166.20 | 60 ₹23,545.20 | 50 ₹19,621 |
| 6.00 | Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site. | 600 | Hr. | 195 ₹1.2 L | 20 ₹12,000 | 50 ₹30,000 |
| 7.00 | Laying Plain Cement Concrete (M -15) in foundation 1:2:4 with stone grit including cost of all materials, labour, T&p etc, complete. | 41.94 | Cum | 6,800 ₹2.9 L | 6,900 ₹2.9 L | 5,800 ₹2.4 L |
| 8.00 | Bending,Binding,Cutting and Placing in position reinforcement including cost of all materials,labour and T&P etc. required for porper completion of the work | 41.48 | MT | 80,000 ₹33.2 L | 83,000 ₹34.4 L | 94,000 ₹39.0 L |
| 9.00 | Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for proper completion of the work. | 668.31 | Sqm | 800 ₹5.3 L | 700 ₹4.7 L | 500 ₹3.3 L |
| 10.00 | Providing & Fixing 110 mm dia PVC drainage spouts complete in all respect including cost of all material, labour and T&P etc. as per drawing | 4.2 | RM | 210 ₹882 | 230 ₹966 | 230 ₹966 |
Tender Value
₹1.2 Cr
EMD Value
₹2.3 L
Closing Date
28 Feb 2026, 4:00 pmClosed
Superintending Engineer
Superintending Engineer 16th Circle Irrigation work Pratapgarh
Construction of RCC Box Culvert in the Place of Old Damaged V.R.B.at Km. 0.935 of Deeh Dy.
2026_UPIDC_1118605_1
11/S.E/XVI/2025-26
Open Tender
Civil Works
365 days
Raeebareli.
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,510
₹2.3 L
Yes
8 May 2026
23 Feb 2026
28 Feb 2026
23 Feb 2026
28 Feb 2026
23 Feb 2026
Demolishing RCC Work manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Eng-in- charge.
Demolishing Cement concrete Work manually/By mechanical means including disposal of material within 50 meters lead as per direction of Engineer in charge.
Demolishing brick work in cement mortar manually/By mechanical means I/C disposal of unserviceable material within 50 meters lead as per direction of Eng-in- charge.
E/W in Making Road Diversion By Power Transport with lead upto 5 Km including Excavation, loading, unloading, Royalty, dressing etc.
E/w in cutting in foundation of box Culvert / Guide wall on channels including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per direction of engineer-in-charge.
Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site.
Laying Plain Cement Concrete (M -15) in foundation 1:2:4 with stone grit including cost of all materials, labour, T&p etc, complete.
Bending,Binding,Cutting and Placing in position reinforcement including cost of all materials,labour and T&P etc. required for porper completion of the work
Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for proper completion of the work.
Providing & Fixing 110 mm dia PVC drainage spouts complete in all respect including cost of all material, labour and T&P etc. as per drawing
Providing & Fixing 75 mm dia PVC weep holes pipe complete in all respect including cost of all material, labour and T&P etc. as per drawing
Laying Reinforced Cement Concrete (M25 A20) in foundation , wall, slab etc. in 1:1:2 with stone grit including cost of all material, labour and T&p etc, complete.
Providing & Fixing 25 MM thick Bitumen Joint filer Board For Expansion Joints.
Filling local sand including all cost of material, manual compaction, raming & watering, Labour T&P etc complete.
Finishing walls with Premium Acrylic Smooth exterior paint of required shade New work (Two or more coats applied @ 1.67 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20kg/10sqm)( ace adv. walmasta) Asian/ burger.
Dry brick on edge pitching including preparation of sub grade and filling joints with local sand including cost of Material,Labour and T&P etc.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.63 MB
11bid.pdf
Tender Documents • 2.23 MB
BOQ_2079268.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid