| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.1 CrAccepted-AOC | ₹5.1 Cr | 1 | Accepted-AOC l1 |
| 2 | 2₹5.3 Cr+₹17.9 L (3.51%)Rejected-Finance 12F ALOOKARAN HOUSE WOODCOCK ROAD ST MARYS HILL OOTY NILGIRIS DISTRICT 643 001 | THE NILGIRIS | TAMIL NADU | 643001 | ₹5.3 Cr+₹17.9 L (3.51%) | 2 | Rejected-Finance l2 |
| Sl No | Description | Qty | Unit | Hilltop Constructions (P) Ltd L2 | trust constructions L1 |
|---|---|---|---|---|---|
| 1.10Strengthening of road from Hubbathalai village Poraithatty road Km 0/0 - 1/6 H/O Hubathalai | |||||
| 1.20 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 2,304 | Sqm | 9 ₹20,736 | 8.3 ₹19,123.2 Lowest |
| 1.30 | Scarifying the existing bituminous road surface to a depth of 150mm and disposal of scarified material with a lift of upto 3m and lead upto 1000m as per technical specification | 1,391 | Sqm | 9 ₹12,519 | 8.55 ₹11,893.05 Lowest |
| 1.40Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete | |||||
| 1.50 | Km 0/0 to 1/0 | 444.9 | Cum | 3,119 ₹13,87,643.1 | 3,014 ₹13,40,928.6 Lowest |
| 1.60 | Km 1/0 to 1/6 | 261.45 | Cum | 3,119 ₹8,15,462.55 | 3,014 ₹7,88,010.3 Lowest |
| 1.70Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per | |||||
| 1.80 | Km 0/0 to 1/0 | 2,966 | Sqm | 104 ₹3,08,464 | 100 ₹2,96,600 Lowest |
| 1.90 | Km 1/0 to 1/6 | 1,743 | Sqm | 104 ₹1,81,272 | 100 ₹1,74,300 Lowest |
| 2.00Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per | |||||
Tender Value
₹5.3 Cr
EMD Value
₹5.3 L
Closing Date
25 Jun 2025, 3:00 pmClosed
ADDL COLLECTOR DEV
DRDA THE NILGIRIS
Improvement of 1 Rural Road of length 1.600 Km in Coonoor block and 2 Rural Roads of length 3.450Km in Kotagiri block of The Nilgiris PO4
2025_RDTN_570516_1
SASCI 2025-2026 - PKG 04
Open Tender
Civil Works - Roads
Item Rate
180 days
COONOOR AND KOTAGIRI BLOCK
AS PER TENDER CONDITION
2 documents required · 2 mandatory
₹0
₹5.3 L
Yes
DRDA THE NILGIRIS
1 Sept 2025
18 Jun 2025
25 Jun 2025
18 Jun 2025
25 Jun 2025
18 Jun 2025
23 Jun 2025
Amount
Strengthening of road from Hubbathalai village Poraithatty road Km 0/0 - 1/6 H/O Hubathalai
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Scarifying the existing bituminous road surface to a depth of 150mm and disposal of scarified material with a lift of upto 3m and lead upto 1000m as per technical specification
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per
Providing and laying 50mm consolidated thick bituminous macadam using 0.20 cum fo 26.50- 13.20mm, 0.43 cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below size IRC metal with 37 Kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification.(Bituminous Macadam 50mm
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic (6%) for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Construction of un-reinforeced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2. M30 (Grade), coarse and fine aggregaes conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, lain in approved fixed side form work (steel channel, laying and fixing of 25 micron thick polythene film, wedges, steel plates including levelling the formwork a sper drawing), spreading the concrete with sholves, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including including provsion of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construciton joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing
V shape drain
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Cement concrete 1:4:8 using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 30cm, thick, compacting etc., complete complying with standard specification and as directed.
Cement concrete 1:2:4 using 20mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 30cm, thick, compacting etc., complete complying with standard specification and as directed.
Provision for Sign Board Charges
Road Marker / Road stud with lens Reflector
Provision for KM Stones
Provision for HM Stones
Strengthening of Km 2.8 of corsley marvalla Road to kappaty palliyada Road 0/0 -2/200 R-124
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with Cross bracings using mild steel sheets of size 90cms x 60cm and 10 gauge stiffened welded with mild steel angles of size 25mm x 25mmx3mm for boarding laid over silver oak (Country wood) Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification and as directed for the following items.
Cement concrete 1:3:6 using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc., complete complying with standard specification and as directed.
Construction of un-reinforeced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2. M30 (Grade), coarse and fine aggregaes conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, lain in approved fixed side form work (steel channel, laying and fixing of 25 micron thick polythene film, wedges, steel plates including levelling the formwork a sper drawing), spreading the concrete with sholves, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including including provsion of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construciton joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing
Estimate for Pipe culvert
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Collection and supply of sand filling
Cement concrete 1:4:8 using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 30cm, thick, compacting etc., complete complying with standard specification and as directed.
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with Cross bracings using mild steel sheets of size 90cms x 60cm and 10 gauge stiffened welded with mild steel angles of size 25mm x 25mmx3mm for boarding laid over silver oak (Country wood) Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification and as directed for the following items.
Cement concrete 1:3:6 using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc., complete complying with standard specification and as directed.
Providing & Laying RCC pipe NP3 for culverts
Gravel filling between body wall including cost & conveyence
Provision for Retaining wall (Sub estimate)
Earth work excavation and depositing on bank within initial lead of 10mtrs and initial lift of 2mtrs. in hard stiff clay still black hard red earth shales murrams gravel stoney earth a death mixed withsmall size boulders and hard gravelly soil (SS 20 B)
Cement concrete 1:4:8 (one cement four sand and eight hard broken stone) using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc.,
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with Cross bracings using mild steel sheets of size 90cms x 60cm and 10 gauge stiffened welded with mild steel angles of size 25mm x 25mmx3mm for boarding laid over silver oak (Country wood) Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification and as directed for the following items.
For Retaining wall
Parapet wall
Cement concrete 1:3:6 using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc., complete complying with standard specification and as directed.
Provision for Weep holes
Provision for Road side Drain (Sub Estimate)
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Cement concrete 1:4:8 using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 30cm, thick, compacting etc., complete complying with standard specification and as directed.
Cement concrete 1:2:4 using 20mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 30cm, thick, compacting etc., complete complying with standard specification and as directed.
Provision for Sign Board Charges
Provision for KM Stones
Provision for HM Stones
Strengthening of road from km 1/6 of Hullathatty road to Jackkacombai road km 0/0 - 1/250 H/O Nedugula R-123
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per
Providing and laying TACK COAT over WBM/WMM surface using 2.5 Kg of bitumen emulsion (RS1) per 10 sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc complete.including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Tack Coat over Existing BT surface using 3 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic (6%) for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Construction of un-reinforeced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2. M30 (Grade), coarse and fine aggregaes conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, lain in approved fixed side form work (steel channel, laying and fixing of 25 micron thick polythene film, wedges, steel plates including levelling the formwork a sper drawing), spreading the concrete with sholves, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including including provsion of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construciton joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing
Provision for Retaining wall (Sub estimate) ch 330
Earth work excavation and depositing on bank within initial lead of 10mtrs and initial lift of 2mtrs. in hard stiff clay still black hard red earth shales murrams gravel stoney earth a death mixed withsmall size boulders and hard gravelly soil (SS 20 B)
Cement concrete 1:4:8 (one cement four sand and eight hard broken stone) using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc.,
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with Cross bracings using mild steel sheets of size 90cms x 60cm and 10 gauge stiffened welded with mild steel angles of size 25mm x 25mmx3mm for boarding laid over silver oak (Country wood) Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification and as directed for the following items.
For Retaining wall
Parapet wall
Cement concrete 1:3:6 using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc., complete complying with standard specification and as directed.
Provision for Weep holes
V shape drain
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Cement concrete 1:4:8 using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 30cm, thick, compacting etc., complete complying with standard specification and as directed.
Cement concrete 1:2:4 using 20mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 30cm, thick, compacting etc., complete complying with standard specification and as directed.
Provision for Sign Board Charges
Road Marker / Road stud with lens Reflector
Provision for KM Stones
Provision for HM Stones
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Provision for Name Board
Hilltop Constructions (P) Ltd (BID ID -1377936)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_681624.xls
BOQ • 0.37 MB
173513165.pdf
Tender Documents • 0.40 MB
173513167.html
Tender Documents • 0.08 MB
TECHBID4.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .