Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.3 LAdmitted-Fee/PreQual/Technical/Finance | -40.88% | ₹7.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹9.2 L+₹1.9 L (26.0%)Admitted-Fee/PreQual/Technical/Finance | -25.51% | ₹9.2 L+₹1.9 L (26.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹11.0 L+₹3.7 L (50.7%)Admitted-Fee/PreQual/Technical/Finance | -10.90% | ₹11.0 L+₹3.7 L (50.7%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹11.6 L+₹4.3 L (59.0%)Admitted-Fee/PreQual/Technical/Finance | -6.00% | ₹11.6 L+₹4.3 L (59.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.3 L
EMD Value
₹15,400
Closing Date
19 Aug 2026, 4:00 pmClosed
Area Engineer Civil Kenda Area
OFFICE OF THE GENERAL MANAGER, KENDA AREA
Barbed wire fencing with RCC post at CL Jambad expansion OCP (Hiring) under Kenda Area
2026_ECL_363252_1
ECL/GM/Knd/AE(C)/ e-tender/26-27/62 date- 06.08.2026
Open Tender
Civil Works - Others
Percentage
60 days
CL Jambad
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,400
20 Aug 2026
7 Aug 2026
20 Aug 2026
8 Aug 2026
19 Aug 2026
8 Aug 2026
7 Aug 2026 - 14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 0.8 | cum | 188.75 | ₹151 |
| 1.02 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1 | cum | 1,061.6 | ₹1,060.54 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.6 | cum | 6,007.2 | ₹3,598.31 |
| 1.04 | Supplying at site: R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarsesand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in- charge (cost of earth works in excavation, concrete works in foundation to be paid separately). | - | cum | 24,077.65 | - |
| 1.05 | Fencing with R.C.C. post placed at required distance, embedded incement concrete blocks, every 15th post, last but one end post andcorner post shall be strutted on both sides and end post one sideonly, provided with horizontal lines and two diagonals of barbed wireweighing 9.38 kg per 100 metres (minimum), between the two postsfitted and fixed with G.I. staples on wooden plugs or G.I. binding wiretied to 6 mm bar nibs fixed while casting the post (cost of R.C.C.posts, struts, earth work and concrete to be paid for separately) :-Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire | 1 | metre | 10.45 | ₹10.44 |
| 2Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Tendernotice_2.pdf
PDF • 2.05 MB
BOQ_376169.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .