Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹40.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹41.9 L+₹1.3 L (3.25%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹42.7 L+₹2.1 L (5.23%)Admitted-Finance VILL KAKDWIP SUBHASH NAGAR P O KAKDWIP DIST SOUTH 24 PARGANAS PIN 743347 | KAKDWIP | SOUTH 24 PARGANAS | WEST BENGAL | 743347 | L3 | Admitted-Finance |
Tender Value
₹40.0 L
EMD Value
₹80,000
Closing Date
27 Jun 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DG CIVIL
OFFICE OF DG CIVIL THE KOLKATA MUNICIPAL CORPORATION 5 S.N. BANERJEE ROAD KOLKATA 700013
DEVELOPMENT OF URDU AND ENGLISH MEDIUM SCHOOL (SERVICE ORIENTED TRAINING CENTRE -U.P.S.C ORDER BY WBMDFC), 38, SIR SYED AHMED ROAD KOLKATA.(GROUND AND 1ST FLOOR STRUCTURAL PART )
2026_KMC_1027682_1
KMC/DG(C)/EE(C/HQ)/006/ 2026-27, dated 08/06/2026
Open Tender
CIVIL WORKS
Percentage
90 days
38, SIR SYED AHMED ROAD KOLKATA.
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹80,000
20 Jul 2026
12 Jun 2026
29 Jun 2026
12 Jun 2026
27 Jun 2026
12 Jun 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying ready mixed concrete of M 25 Grade with well graded stone chips
of 20 mm nominal size containing designed quantity of cement per Cu.m of
wet concrete produced in computerised batching plant under controlled
condition using approved super plastisizer, designing concrete mix following
I.S. 10262 and I.S. 456, transporting the mix with agitation in transit mixer to
work site depositing the mix on a platform erected for the purpose at required
levels of concreting and then placing the mix in its final location of form work
compacting and curing the same complete as per specification & direction of
the Engineer-in-charge including computerised batching plant transit mixer
with all accessories vibrators etc. inclusive of all other incidental charges in
this connection complete but excluding cost of hire charge of platform and its
supporting staging which would be paid through separate item. [cement to be
supplied by the Manufacturer/ supplier]
In Ground Floor and Foundation
ii) With approved concrete pump .ground floor | 72.29 | CUM | 7,512.84 | ₹5,43,095.69 |
| 2 | first floor | 72.29 | CUM | 7,607.84 | ₹5,49,963.15 |
| 3 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation, basement and upto roof of ground floor / upto 4m (i) Tor steel/Mild Steel
(I) SAIL/TATA/RINL.GROUND FLOOR | 9.91 | MT | 60,580 | ₹6,00,329.07 |
| 4 | first floor | 9.88 | MT | 61,060 | ₹6,03,038.06 |
| 5 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof) (c)Steel shuttering or 9 to12mm thick approved quality ply board shuttering in any concrete work.GROUND FLOOR | 533.4 | SQM | 369 | ₹1,96,823.86 |
| 6 | first floor | 528.64 | SQM | 387 | ₹2,04,581.75 |
| 7 | Labour for Chipping of concrete surface before taking up Plastering work. | 1,062.03 | SQM | 21 | ₹22,302.69 |
| 8 | Brick work with 1st class bricks in cement mortar (1:6).in super structure, ground floor | 46.67 | CUM | 5,636 | ₹2,63,032.12 |
| 9 | in super structure, ground floor | 46.7 | CUM | 5,747 | ₹2,68,384.9 |
| 10 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.ground floor | 2.79 | CUM | 6,216 | ₹17,336.42 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
CIVIL.pdf
Additional Documents • 4.88 MB
BOQ_2524358.xls
BOQ • 0.30 MB
TENDER_1.pdf
Tender Documents • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .