EE EnM WnS South II
Apollo B.P.S., Sarita Vihar (Near Apollo Hospital) New Delhi 110076
Repairing and rewinding of SKOPE make sub. Pump sets in Kalkaji Constituency. (Re-Invite)
2021_DJB_200356_10
NIT No. 30 EE EnM WnS South II (2020-21)
Open Tender
Miscellaneous Works
Works
30 days
EE EnM WnS South II
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
Exempted
2 Mar 2021
20 Feb 2021
27 Feb 2021
20 Feb 2021
27 Feb 2021
20 Feb 2021
5.0 HP Sub. Pump Sets Repair and Rewinding of P/set No –35 By carrying out following works: P/o Rewinding kit for Motor 1 Set, G.M. Bearing Bush 2 Nos., Stage Bowls P.P. 4 No., Suction Chamber 1 No., Rotor Sleeve Turning & Polishing 1 Job, Labour Charges 1 Job.
5.0 HP Sub. Pump Sets Repair and Rewinding of P/set No.– 36 By carrying out following works: P/o Rewinding kit for Motor 1 Set, G.M. Bearing Bush 2 Nos., Water Seal 2 Nos., Stage Bowls P.P. 3 Nos., Impeller P.P. 3 Nos., Rotor Sleeve Turning & Polishing 1 Job., Labour Charges 1 Job.
5.0 HP Sub. Pump Sets Repair and Rewinding of P/set No –287 By carrying out following works: P/o Rewinding kit for Motor 1 Set, G.M. Bearing Bush 2 Nos., Submersible Cable 2.5 sq. mm 5 Mtrs., Stage bowls P.P. 2 Nos., Impeller P.P. 2 Nos., Suction Chamber 1 No., Rotor end welding Turning/Polishing & key way making 1 Job., Labour Charges1 Job.
7.5 HP Sub. Pump Sets Repair and rewinding of P/set No. –105 By carrying out following works: P/o Rewinding kit for Motor 1 Set., G.M. Bearing Bush 2 Nos., Submersible Cable 2.5 sq mm 7 Mtrs., Guide Bush 4 Nos., Distance Bush 3 Nos., Rotor end welding Turning & Polishing & Key way making 1 Job, Stamping Repairing 1 Job., Balancing of Rotor 1 Job., Labour Charges 1 Job
7.5 HP Sub. Pump Sets Repair and rewinding of P/set No. – 137 By carrying out following works: P/o Rewinding kit for Motor 1 Set., Neck Ring 5 Nos., Motor Base 1 No., Guide Bush 4 Nos., Rotor Sleeve Turning & Polishing 1 Job, Stamping Repairing 1 Job, Impeller Rematling & Turning 2 Job., Epoxy Paint for Rotor 1 Job., N.R.V. Repairing 1 Job., Labour Charges 1 Job
7.5 HP Sub. Pump Sets Repair and rewinding of P/set No. – 138 By carrying out following works: P/o Rewinding kit for Motor 1 Set., G.M. Bearing Bush 2 Nos., Submersible Cable 2.5 sq mm 7 Mtrs., Guide Bush 3 Nos., Neck Ring 2 Nos., Rotor end welding Turning & Polishing & Key way making 1 Job, Balancing of Rotor 1 Job., Stamping Repairing 1 Job, N.R.V. Repairing 1 Job., Labour Charges 1 Job
7.5 HP Sub. Pump Sets Repair and rewinding of P/set No. – 160 By carrying out following works: P/o Rewinding kit for Motor 1 Set., G.M. Bearing Bush 2 Nos., Submersible Cable 2.5 sq mm 7 Mtrs., Guide Bush 4 Nos., Distance Bush 3 Nos., Neck Ring 5 Nos., Balancing of Rotor 1 Job., Motor Base Repairing 1 Jobs., Labour Charges 1 Job
7.5 HP Sub. Pump Sets Repair and rewinding of P/set No. – 167 By carrying out following works: P/o Rewinding kit for Motor 1 Set., G.M. Bearing Bush 2 Nos., Distance Bush 5 Nos., Guide Bush 4 Nos., Rotor end welding Turning & Polishing & Key way making 1 Job, Stamping Repairing 1 Job, Thrust Plate Repairing 1 Job., Shaft Stationing 1 Job., Epoxy Paint for Rotor 1 Job., Labour Charges 1 Job
7.5 HP Sub. Pump Sets Repair and rewinding of P/set No. – 171 By carrying out following works: P/o Rewinding kit for Motor 1 Set., G.M. Bearing Bush 2 Nos., Submersible Cable 2.5 sq mm 7 Mtrs., Distance Bush 5 Nos., Balancing of Rotor 1 job., Epoxy Paint for Rotor 1 Job., Stamping Repairing 1 Job., Thrust Bearing Repairing 1 Job., Labour Charges 1 Job
7.5 HP Sub. Pump Sets Repair and rewinding of P/set No. –195 By carrying out following works: P/o Rewinding kit for Motor 1 Set., G.M. Bearing Bush 2 Nos., Guide Bush 6 Nos., Distance Bush 4 Nos., C.I. Stage Bowls 1 Job., Rotor end welding Turning & Polishing & Key way making 1 Job., N.R.V. Repairing 1 Job, Balancing of Rotor 1 Job., Labour Charges 1 Job
7.5 HP Sub. Pump Sets Repair and rewinding of P/set No. – 196 By carrying out following works: P/o Rewinding kit for Motor 1 Set., G.M. Bearing Bush 2 Nos., Neck Rings 5 Nos., Rotor end welding turning & Polishing & Key way making 1 Job, Thrust Plate Repairing 1 Job., Stamping Repairing 1 Job., Epoxy Paint for Rotor 1 Job., Balancing of Rotor 1 Job., Labour Charges 1 Job
7.5 HP Sub. Pump Sets Repair and rewinding of P/set No. – 197 By carrying out following works: P/o Rewinding kit for Motor 1 Set., Submersible Cable 2.5 sq mm 7 Mtrs., Neck Rings 5 Nos., Guide bush 7 Nos., Rotor end welding Turning & Polishing & key way making 1 Job, Stamping Repairing 1 Job., Balancing of Rotor 1 Job., Labour Charges 1 Job
7.5 HP Sub. Pump Sets Repair and rewinding of P/set No. – 220 By carrying out following works: P/o Rewinding kit for Motor 1 Set., Guide Bush 6 Nos., Motor Base Repairing 1 Job., N.R.V. Repairing 1 Job., Stamping Repairing 1 Job., Impeller Rematling & Turning 3 Job., Epoxy Paint for Rotor 1 Job., Labour Charges 1 Job
7.5 HP Sub. Pump Sets Repair and rewinding of P/set No. – 221 By carrying out following works: P/o Rewinding kit for Motor 1 Set., Submersible Cable 2.5 sq mm 7 Mtrs., Distance Bush 7 Nos., Guide Bush 6 Nos., Rotor Sleeve Turning & Polishing 1 Job, Stamping Repairing 1 Job., Balancing of Rotor 1 Job., Labour Charges 1 Job
7.5 HP Sub. Pump Sets Repair and rewinding of P/set No. –229 By carrying out following works: P/o Rewinding kit for Motor 1 Set., G.M. Bearing Bush 2 Nos., Connection Piece 1 No., Guide Bush 5 Nos., Distance Bush 4 Nos., Rotor end welding Turning & Polishing & Key way making 1 Job, Epoxy Paint for Rotor 1 Job., Impeller Rematling & Turning 3 Job., Housing Repairing 1 Job., Labour Charges 1 Job
7.5 HP Sub. Pump Sets Repair and rewinding of P/set No. – 238 By carrying out following works: P/o Rewinding kit for Motor 1 Set., Submersible Cable 2.5 sq mm 7 Mtrs., Guide Bush 5 Nos., Distance Bush 5 Nos., Rotor end welding Turning & Polishing & Key way making 1 Job, Stamping Repairing 1 Job., Thrust Bearing Repairing 1 Job., Balancing of Rotor 1 Job., Labour Charges 1 Job
7.5 HP Sub. Pump Sets Repair and rewinding of P/set No. –243 By carrying out following works: P/o Rewinding kit for Motor 1 Set., Submersible Cable 2.5 sq mm 7 Mtrs., Guide Bush 4 Nos., Distance Bush 4 Nos., Rotor Sleeve Turning & Polishing 1 Job., Stamping Repairing 1 Job., N.R.V. Repairing 1 Job., Balancing of Rotor 1 Job., Housing Repairing 1 Job., Epoxy Paint for Rotor 1 Job., Labour Charges 1 Job
7.5 HP Sub. Pump Sets Repair and rewinding of P/set No. –244 By carrying out following works: P/o Rewinding kit for Motor 1 Set., G.M. Bearing Bush 2 Nos., Submersible Cable 2.5 sq mm 7 Mtrs., Distance Bush 3 Nos., Neck Rings 3 Nos., Rotor end welding Turning & Polishing & Key way making 1 Job, Balancing of Rotor 1 jobs., Motor Base Repairing 1 Job., Epoxy Paint for Rotor 1 Job., Labour Charges 1 Job
10.0 HP Sub. Pump Sets Repair and rewinding of P/set No. –33 By carrying out following works: P/o Rewinding kit for Motor 1 Set., Submersible Cable 2.5 sq mm 7 Mtrs., Neck Rings 5 Nos., Guide Bush 8 Nos., Rotor Sleeve turning & Polishing 1 Job, Stamping Repairing 1 Job., N.R.V. Repairing 1 Job., Epoxy Paint for Rotor 1 Job., Labour Charges 1 Job
10.0 HP Sub. Pump Sets Repair and rewinding of P/set No. –34 By carrying out following works: P/o Rewinding kit for Motor 1 Set., G.M. Bearing Bush 2 Nos., Submersible Cable 2.5 sq mm 7 Mtrs., Guide Bush 2 Nos., Distance Bush 3 Nos., Rotor end welding Turning & Polishing & Key way making 1 Job, Stamping Repairing 1 Job., Balancing of Rotor 1 Job., Labour Charges 1 Job
10.0 HP Sub. Pump Sets Repair and rewinding of P/set No. – 107 By carrying out following works: P/o Rewinding kit for Motor 1 Set., Neck Rings 5 Nos., Guide Bush 4 Nos., Motor Base Repairing 1 Job., N.R.V. Repairing 1 Job., Stamping Repairing 1 Job., Impeller Rematling & Turning 3 Job., Epoxy Paint for Rotor 1 Job., Labour Charges 1 Job
10.0 HP Sub. Pump Sets Repair and rewinding of P/set No. – 109 By carrying out following works: P/o Rewinding kit for Motor 1 Set., Submersible Cable 2.5 sq mm 7 Mtrs., Distance Bush 7 Nos., Guide Bush 6 Nos., Rotor Sleeve Turning & Polishing 1 Job, Stamping Repairing 1 Job., Balancing of Rotor 1 Job., Labour Charges 1 Job
10.0 HP Sub. Pump Sets Repair and rewinding of P/set No. – 113 By carrying out following works: P/o Rewinding kit for Motor 1 Set., G.M. Bearing Bush 2 Nos., Connection Piece 1 No., Guide Bush 9 Nos., Rotor end welding Turning & Polishing & Key way making 1 Job, Epoxy Paint for Rotor 1 Job., Impeller Rematling & Turning 3 Job., Housing Repairing 1 Job., Labour Charges 1 Job
10.0 HP Sub. Pump Sets Repair and rewinding of P/set No. –119 By carrying out following works: P/o Rewinding kit for Motor 1 Set., submersible Cable 2.5 sq mm 7 Mtrs., Guide Bush 4 Nos., Distance Bush 4 Nos., Rotor end welding Turning & Polishing & Key way making 1 Job, Stamping Repairing 1 Job., Thrust Bearing Repairing 1 Job., Balancing of Rotor 1 Job., Labour Charges 1 Job
10.0 HP Sub. Pump Sets Repair and rewinding of P/set No. – 122 By carrying out following works: P/o Rewinding kit for Motor 1 Set., submersible Cable 2.5 sq mm 7 Mtrs., Guide Bush 2 Nos., Distance Bush 4 Nos., Rotor Sleeve Turning & Polishing 1 Job., Stamping Repairing 1 Job., N.R.V. Repairing 1 Job., Balancing of Rotor 1 Job., Housing Repairing 1 Job., Epoxy Paint for Rotor 1 Job., Labour Charges 1 Job
10.0 HP Sub. Pump Sets Repair and rewinding of P/set No. –130 By carrying out following works: P/o Rewinding kit for Motor 1 Set., G.M. Bearing Bush 2 Nos., Submersible Cable 2.5 sq mm 7 Mtrs., Neck Rings 7 Nos., Rotor end welding Turning & Polishing & Key way making 1 Job, Balancing of Rotor 1 jobs., Motor Base Repairing 1 Job., Epoxy Paint for Rotor 1 Job., Labour Charges 1 Job
10.0 HP Sub. Pump Sets Repair and rewinding of P/set No. – 133 By carrying out following works: P/o Rewinding kit for Motor 1 Set., Submersible Cable 2.5 sq mm 7 Mtrs., Neck Rings 5 Nos., Guide Bush 8 Nos., Rotor Sleeve turning & Polishing 1 Job, Stamping Repairing 1 Job., N.R.V. Repairing 1 Job., Epoxy Paint for Rotor 1 Job., Labour Charges 1 Job
10.0 HP Sub. Pump Sets Repair and rewinding of P/set No. – 134 By carrying out following works: P/o Rewinding kit for Motor 1 Set., G.M. Bearing Bush 2 Nos., Submersible Cable 2.5 sq mm 7 Mtrs., Guide Bush 3 Nos., Distance Bush 4 Nos., Rotor end welding Turning & Polishing & Key way making 1 Job, Stamping Repairing 1 Job., Balancing of Rotor 1 Job., Labour Charges 1 Job
10.0 HP Sub. Pump Sets Repair and rewinding of P/set No. –136 By carrying out following works: P/o Rewinding kit for Motor 1 Set., Neck Ring 5 Nos., Motor Base 1 No., Guide Bush 4 Nos., Rotor Sleeve Turning & Polishing 1 Job, Stamping Repairing 1 Job, Impeller Rematling & Turning 2 Job., Epoxy Paint for Rotor 1 Job., N.R.V. Repairing 1 Job., Labour Charges 1 Job.
10.0 HP Sub. Pump Sets Repair and rewinding of P/set No. – 142 By carrying out following works: P/o Rewinding kit for Motor 1 Set., Submersible Cable 2.5 sq mm 7 Mtrs., Neck Ring 4 Nos., Guide Bush 4 Nos., Rotor end welding Turning & Polishing & Key way making 1 Job, Balancing of Rotor 1 Job., Thrust Bearing Repairing 1 Job., Stamping Repairing 1 Job, N.R.V. Repairing 1 Job., Labour Charges 1 Job
Old Material Rebate
pumps engineering enterprises
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .