Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.8 CrAccepted-AOC | ₹6.8 Cr Quoted ₹7.4 Cr | 1 | Accepted-AOC L1 M/s.SGK BLUE METAL is Accepted |
| 2 | 2₹7.6 Cr+₹13.6 L (1.83%)Rejected-Finance | ₹7.6 Cr+₹13.6 L (1.83%) | 2 | Rejected-Finance L1 Lowest Tenderer can only be Accepted. L2 is Rejected |
| 3 | Rejected-Technical COIMBATORE 18 TAMIL NADU | 18 | - | - | Rejected-Technical Rejected |
Tender Value
₹6.8 Cr
EMD Value
₹3.5 L
Closing Date
3 Jul 2020, 3:00 pmClosed
Superintending Engineer H C and M
The Superintending Engineer Highways C and M 39 Chikkanna College Road Tirupur 641602
Widening and Improvements IRQP Construction of CD Works Construction of Retaining Wall Works and including Up Keeping for a period for a period of 60 months on Govt Roads in Madathukulam H C and M Sub Division Pkg 37
2020_HWAY_165740_1
TN 02 20 21 HDO Dt 26.05.2020 Pkg 37 Dharapuram Dn
Open Tender
Civil Works - Highways
Percentage
240 days
Madathukulam
Refer PQ Documents Volume I
15 documents required · 15 mandatory
₹0
₹3.5 L
26 Sept 2020
1 Jun 2020
6 Jul 2020
1 Jun 2020
3 Jul 2020
8 Jun 2020
2 Jun 2020 - 5 Jun 2020
eProcurement System Government of Tamil Nadu Created By: Nagarajan GV Created Date/Time: 16-Jul-2020 11:23 AM Tender Title: TN 02 20 21 HDO Dt 26.05.2020 Pkg 37 Dharapuram Division Tender ID: 2020_HWAY_165740_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Tirupur Circle
Name of Work :- Widening and Improvements, Improvements to Riding Quality, Construction of CD Works, Construction of Retaining Wall Works and including Up Keeping for a period for a period of 60 months on Government Roads in Madathukulam (Highways), C&M, Sub Division. Package No.37 Road A :- Widening from Intermediate lane to Two lane and Improvements of Dhali - Komaralingam road at km 8/0 - 9/0 construction of retainingwall at km 8/4, 8/6 & 8/8 (MD 94) including upkeeping for a period of 60 months Road B :- Widening from Intermediate lane to Two lane and Improvements of Dhali - Komaralingam road at km 9/0 - 10/0 construction of retainingwall at km 9/6 & 9/10 (MD 94) including upkeeping for a period of 60 months Road C :- Widening from Single lane to Intermediate lane and Improvements of Thungavai - Poolavadi road. at km 5/6 - 6/4 and 7/0 - 7/700 Construction of retainingwall at km 6/2 & 6/4 including upkeeping for a period of 60 months Road D :- Widening from Single lane to Two lane and Improvements of The road branching at Km 80/0 of Coimbatore - Dindigal road to meet at km 4/6 of Karatholuvu - komarlingam at km 0/0 - 1/0 ,reconstruction of culvert at km 0/10, widening of culvert at km 0/4 and construction of retainingwall at km 0/10 including upkeeping for a period of 60 months Road E :- Improvements to Riding Quality at km 16/4 - 17/0 of Udumalpet - Dharapuram road (SH 97) including upkeeping for a period of 60 months Road F :- Improvements to Riding Quality at km 7/6 - 10/0 of Kaniyur - Myvadi - Periyakottai road. including upkeeping for a period of 60 months Road G :- Improvements to Riding Quality at km 0/0 - 2/2 of Nallannagoundenpudur - Madathur road including upkeeping for a period of 60 months Road H :- Improvements to Riding Quality at km 0/0 - 1/150 of Karatholuvu - Komaralingam road to Vedapatti road. including upkeeping for a period of 60 months Road I :- Improvements to Riding Quality at km 0/0 - 1/0 of The road branching from Pollachi - Dharapuram - Karur road to Dhasarpatti including upkeeping for a period of 60 months Road J :- Improvements to Riding Quality at km 6/8 - 9/8 of Amaravathi sugar mill to Kongalakurichi road including upkeeping for a period of 60 months Road K :- Improvements to Riding Quality at km 7/0 - 7/6 of Kaniyur - Myvadi - Periyakottai road. including upkeeping for a period of 60 months Road L :- Improvements to Riding Quality at km 0/0 - 1/500 of Mylapuram- Amaravathi Nagar road including upkeeping for a period of 60 months Road M :- Improvements to Riding Quality at km 0/8 - 1/842 of N.G.Pudur to Meet Kolumam - Palani road (Ird Reach) including upkeeping for a period of 60 months Road N :- Improvements to Riding Quality at km 1/6 - 2/6, 7/100 - 7/6, 12/2 - 12/350 and 12/650 - 13/100 of Karatholuvu - Komaralinga salai (MD 149) including upkeeping for a period of 60 months
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 SGK BLUE METAL 60882031.97 9.00 74324785.00 Seven Crore Fourty Three Lakh Twenty Four Thousand Seven Hundred and Eighty Five
2.00 SRI GANAPATHY AND CO 60882031.97 11.00 75688543.00 Seven Crore Fifty Six Lakh Eighty Eight Thousand Five Hundred and Fourty Three
Lowest Amount Quoted BY: SGK BLUE METAL(74324785.00)
BOQ Summary Details Tender Title: TN 02 20 21 HDO Dt 26.05.2020 Pkg 37 Dharapuram Division Tender ID: 2020_HWAY_165740_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 SGK BLUE METAL 74324785.00 L1
2 SRI GANAPATHY AND CO 75688543.00 L2
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .