| 1 | L1₹2.3 CrAccepted-AOC 180 10 STREET NO 10 HARPAL NAGAR NEAR TRIVENI MANDIR BHATTI ROAD BATHINDA 151001 | BATHINDA | PUNJAB | 151001 | ₹2.3 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.6 Cr+₹36.9 L (16.2%)Rejected-Finance 107 KRISHNA COLONY MALOUT DISTRICT SRI MUKTSAR SAHIB | MALOUT | SRI MUKTSAR SAHIB | ₹2.6 Cr+₹36.9 L (16.2%) | L2 | Rejected-Finance Rejected due to highest rate. |
Tender Value
₹1.8 Cr
EMD Value
₹3.5 L
Closing Date
12 Jan 2023, 12:00 pmClosed
Executive Engineer
Executive Engineer, Bathinda Canal Division, Bathinda.
Relining of Concrete M-15 Concrete Mixed in automatic batching and mixing plant carried to site of work in transit mixer laid manually with specified thickness RD 19350 - 37500 of Mehma Mara Minor.
2022_WR_93006_2
13/22A/2022-23
Open Tender
Civil Works - Canal
Item Rate
42 days
Bathinda
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹3.5 L
Yes
Bathinda
1 Jun 2023
30 Nov 2022
12 Jan 2023
30 Nov 2022
12 Jan 2023
1 Dec 2022
14 Dec 2022
Amount
Ordinary jungle clearance of both banks of Distributries, minors and drains with discharge 1.50 to 4.50 cumecs including boundary road
Excavation in soil (any type) using hydraulic excavator CK 90 with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections including all lifts and combined lead upto 30 m
Excavation in soil using hydraulic jcb and hydraulic trolley with disposal upto 450 m including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to embankment location within all lifts and lead. (lead = 4.26 km )
Earthwork for compaction in 20 cm layers and dressing., Extra for watering the earth., Extra for rolling to specifications.
Dressing of earthwork.
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above upto 1.50 m
Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres.
Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification.
Laying cement slurry 1:3 with cement 2.25kg/sqm
Cement concrete lining 75 mm thick or less with mechanical paver for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (for vertical height upto 2.0 m)(For Lining)
Cement concrete lining 75 mm thick or less with mechanical paver for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (for vertical height upto 2.0 m)(For coping)
Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (For Sleeper)
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Filling Contraction/Construction Joint with sealing compound complete in all respect
Filling expansion joints with special impervious hot pour 12.5 mm wide.
Extra bitumen painting over concrete surface at joints @ 0.69 kg per Sqm
250 wide LDPE film of 150 micron over sleepers for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specification and Engineer in Charge.
Dismantling brick work, tile masonry or tile lining (in cement mortar).
Dag belling single kassi stroke
Providing and Fixing Distance Marks
Earth work involved in dismantling open flume A.P.M. or O.S.M. type outlets with 'H' more than 0.50 m but upto 0.90 m (including excavation, refilling, consolidation and dressing) .
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling with 'H' more than 0.50 m but upto 0.90 m.
Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.50 m but upto 0.90 m.
PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
RCC M-20 in superstructure
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete.
Dinesh Kumar Garg Contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .