| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC 93 SOUTH ZONE COIMBATORE CORPORATION | ERODE | TAMIL NADU | 638459 | L1 | Accepted-AOC Accept | |
| 2 | L2₹8.7 L+₹44,456.48 (5.35%)Rejected-AOC | L2 | Rejected-AOC Reject |
Tender Value
₹10.5 L
EMD Value
₹10,500
Closing Date
20 Feb 2024, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
The Commissioner, Coimbatore Corporation
Reconstruction of culverts at Podanur main road in Ward No 85 at South Zone.
2024_MAWS_425789_26
E10/2024
Open Tender
Civil Works
Works
365 days
Coimbatore corporation-
As per the tender condition attached
3 documents required · 3 mandatory
₹0
₹10,500
14 May 2024
16 Feb 2024
21 Feb 2024
16 Feb 2024
20 Feb 2024
16 Feb 2024
Amount
Dismantling the damaged RCC Slab as per the instruction of deparrtmental officers including all initial lead and other labour charges
Desilting the existing drain as per the instruction of departmental officers including all initial lead and other labour charges
Dismantling the damaged concrete wall work as per the instruction of departmental officers including all initial lead and other labour charges
Earth work for drain to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting
Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, Spreading, leveling, making approaches for areas of dum+s etc. complete.
Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete
Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as reinforced cement concrete slabs, walls etc., with all cross bracing etc., including decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all
Drain walls with of ReinforcedCement concrete 1:2:4 (one cement, three sand and six aggregate) ‘using 20mm gauge hard broken granite stone jelly ' for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but ‘including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Wall plastering for Plain cement concrete surfaces using cement mortar 1:5(One part of cement, five parts of sand by volume) thickness 12 mm (average) for all internal/external surfaces for drains etc., finished smoothly to one level including curing etc., complete, at all leads and at all heights.
Supplying and erecting in the position of centering for slab lintel and beams including necessary supports and strutting with all cross bracings using mild steel sheel boarding etc completed
Supplying and fabricating of reinforcement steel of all diameters for reinforced cement concrete works at all heights and depths including straightening, cleaning,cutting.ending, placing in position and binding, hoisting and welding if any including cost of power, electrodes etc, cost of annealed binding wire (18 gauge), providing overlaps, tying in position and providing necessary cover blocks for all works as per detailed drawings supplied (including chairs, cranks, lap rods, spacer bars, fan hooks etc.,) with the relevant standard specifications, complete for all leads & lifts.
Reinforced Cement Concrete 1:1.5:3, one part of cement, one and half parts of sand , three parts of 20 mm hard blue granite metal by volume, characteristic strength not less than 20 N/sqmm) machine mixed for all reinforced Cement Concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., complete complying with the relevant standard specifications.
Plain cement concrete 1:2:4 mix (one part of cement, two parts of sand and four aggregates)using 20mm gauge hard stones complying with standard specification
Supply and fixing of 600mm man hole cover with frame (SFRA) isi2592 as per standard specification and direction of departmental officers
PERUMAL
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .