Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.3 L+₹130 (0.10%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.3 L
EMD Value
₹3,900
Closing Date
27 Aug 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O CSC NEAR MASJID SHAREEF PALPORA AKURA BLOCK KPORA
2026_RDPR_321602_110
ENIT97of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹3,900
5 Sept 2026
21 Aug 2026
28 Aug 2026
21 Aug 2026
27 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of labours for site clearance,removal of malba etc | 2 | labs | - | - |
| 2 | Earth work in excavation by mechanical means in trenches for foundations drains,cables,etc. (not exceeding 1.5mt in width), depth up to 1.5mt including disposal up to 1 mt. | 6.73 | cum | - | - |
| 3 | P/laying dry stone soling hand packed including all carriages | 1.31 | cum | - | - |
| 4 | P/L in position cement concrete of grade 1:4:8 mix with 40mm n-mix aggregate, all works up to plinth level | 0.28 | cum | 1 | ₹0.28 |
| 5 | P/L of cement concrete 1:3:6 mix with 20mm aggregate all works upto plinth level. | 1.54 | cum | - | - |
| 6 | Brick work with common burnt clay (non modular) bricks of class designated 7.5 in foundation and plinth including curing (in 1:6 mix) | 3.71 | cum | - | - |
| 7 | Extra for brick work above plinth up to floor v-level | 3.12 | cum | - | - |
| 8 | Centering & shuttering including strutting propping etc. removal of same | 5.01 | sqm | - | - |
| 9 | plum qty | 0.39 | cum | - | - |
| 10 | Reinforcement cement concrete work in beams, suspended floors etc. including curring but excluding the cost of centering shuttering, finishing and reinforcement with 1:2:4 mix with 20mm aggregate | 0.83 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_1075773.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .