| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.2 LAccepted-AOC | ₹84.2 L | L1 | Accepted-AOC eemid godda letter no 1516 dt 19.08.2026 |
| 2 | L2₹84.5 LRejected-Finance | ₹84.5 L | L2 | Rejected-Finance eemid godda letter no 1516 dt 19.08.2026 |
| 3 | Rejected-Technical | - | - | Rejected-Technical semic dumka letter no 523 dt 20.07.2026 |
| 4 | Rejected-Technical | - | - | Rejected-Technical semic dumka letter no 523 dt 20.07.2026 |
Tender Value
₹80.6 L
EMD Value
₹1.6 L
Closing Date
19 Jun 2026, 5:00 pmClosed
EE, MID, GODDA
EE, MID, GODDA
Construction of Check Dam in Rakshi River under Block - Sundarpahari, District - Godda
2026_WRD_115080_1
WRD/MID/GODDA/F2-08/26-27/3rd
Open Tender
Civil Works
Percentage
330 days
Block - Sundarpahari, Dist - Godda
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.6 L
24 Aug 2026
11 Jun 2026
20 Jun 2026
11 Jun 2026
19 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Grass and Removal of Rubbish, Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area . as per specification and direction of E/I. Part -A , Common Item of Works ,Page:-195 & S No:-2.02 | - | Ha | 19,760.3 | - |
| 2 | Earth work in excavation in canals by the hydraulic excavator as per designed section in all kinds of soil, mixed with kankar, pebbles and boulders upto 300mm size and disposel of spoil upto 500m with all lifts by tipper including costruction and maintanance of hual road allwith excavated earth in proper profile and clod breaking and laying earth in 225mm layers all complete as per Specification and direction of E/I.3/ Part -B (W. R. D. ) Page No- 138 & Item No-7.1.43.2. | - | M³ | 105.09 | - |
| 3 | Earth work in excavation in of foundation trenches in ordinary soil (Vide classification of soil item -A) and disposal of excavated earth so obtained (50 M away from the edge of the trenches ) with initial lead of 150M and initial lift of 1.5m all complete as per Specification and direction of E/I . 1/ Part -B (W. R. D. ) Page No- 119 & Item No- 6.1.8 | - | M³ | 177.76 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level Providing and laying P. C. C. M150 with nominal 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)all complete as per bulding specification and direction of E/I. Part -B ( B. C. D.) ,Page:-106, Item No:-5.3.1.2 | 1 | M³ | 4,598.23 | ₹4,598.23 |
| 5 | Providing ramdom rubble stone masonary in c.m. (1:4) in foundation and plinth with hammer dressed stone of less then 0.03 m3 in volume and clean coarse sand of F.M.2.to 2.5 including cost of screening , racking out joints, to 20mm,depth, curing taxes and royality all complete as per bulding specification and direction of E/I. Part - A , Common Item of Works Page No- 204 & Item No- 5.2.28 | 1 | M³ | 2,739.68 | ₹2,739.68 |
| 6 | Providing ramdom rubble stone masonary in c.m. (1:4) in superstructure and with hammer dressed stone of less then 0.03 m3 in volume and clean coarse sand of F.M.2.to 2.5 including cost of screening of materials,Scaffolding, racking out joints, to 20mm,depth, curing texas and royality all complete as per bulding specification and direction of E/I. Part - A , Common Item of Works Page No- 204, & Item No- 5.2.31 | 1 | M³ | 2,906.96 | ₹2,906.96 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level Providing and laying P. C. C. M150 with nominal 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)all complete as per bulding specification and direction of E/I. Part -B ( B. C. D.) ,Page:-106, Item No:-5.3.1.2 | - | M³ | 4,598.23 | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. R. C. C. M200 with nominal 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) all complete as per bulding specification and direction of E/I Part -B ( B. C. D.) ,Page:-107, Item No:-5.3.9.1 | - | M³ | 5,218 | - |
| 9 | Prov. Tor Steel reinforcement of 8mm Dia bars as par approved design and drawin....do..do. (TMT coil Fe 500 (Only valid for Tata (Tiscon), Sail, JSPL, Electro steels Ltd. Bokaro and Vijag (RINL) Part - B (B. C. D), Page:-119, & Item No-5.5.4 | 1 | MT | 83,314.02 | ₹83,313.94 |
| 10 | Prov. Tor Steel reinforcement of 10 mm, 12mm & 16 mm. Dia bars as par approved design and drawin....do..do. (a) 10 mm (TMT coil Fe 500 (Only valid for Tata (Tiscon), Sail, JSPL, Electro steels Ltd. Bokaro and Vijag (RINL) Part - B (B. C. D), Page:-119, & Item No-5.5.5 (a) | - | MT | 82,096.54 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 21.06 MB
BOQ_155605.xls
BOQ • 0.29 MB
NIT.PDF
Tender Documents • 21.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].