Tender Value
₹19.8 L
EMD Value
₹39,600
Closing Date
23 Sept 2026, 6:00 pm
Executive Engineer
m and h divi Sikar
Renovation and Branding Work in the Building at Urban Health Centre Government Primary School, Heeranagar, Neemkathana sikar
2026_MEDIC_589758_2
NIT 23 2026-27 Div Sikar
Open Tender
Civil Works
Percentage
120 days
Sikar
refer bid
2 documents required · 2 mandatory
₹500
refer bids
₹39,600
23 Sept 2026
17 Aug 2026
24 Sept 2026
17 Aug 2026
23 Sept 2026
17 Aug 2026
17 Aug 2026 - 23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 36.48 | cum | 178 | ₹6,493.44 |
| 1.02 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - M10 grade Nominal Mix
1: 4: 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size). | 38.27 | cum | 3,302 | ₹1,26,367.54 |
| 1.03 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: | - | - | - | - |
| 1.04 | Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 23.84 | cum | 2,838 | ₹67,657.92 |
| 1.05 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. | 30.01 | cum | 64 | ₹1,920.64 |
| 1.06 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 6.57 | Sqm. | 157 | ₹1,031.49 |
| 1.07 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement.
M20 grade Nominal Mix / Design Mix | 1.62 | cum | 4,934 | ₹7,993.08 |
| 1.08 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 3: 6 or richer mix. | 42.58 | cum | 637 | ₹27,123.46 |
| 1.09 | Dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. | 186.41 | Sqm. | 80 | ₹14,912.8 |
| 1.1 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.91 MB
Tendernotice_2.pdf
PDF • 35.86 MB
Tendernotice_3.pdf
PDF • 0.19 MB
Tendernotice_4.pdf
PDF • 3.44 MB
Tendernotice_5.pdf
PDF • 0.33 MB
BOQ_1047422.xls
BOQ • 0.58 MB
dateextend.pdf
PDF • 0.22 MB
dateextend.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].